Cost of building an addition or second story: everything you need to know
An addition or second story expands your home without you having to move. The cost depends heavily on the type (prefab or traditional), the floor area in m², the foundation, and the finish. In this overview you'll find current prices by type, a breakdown of material and labor costs, and answers to the most frequently asked questions.
In this article
- ›Average cost of an addition or second story
- ›Cost by type of addition
- ›Material and labor cost breakdown
- ›Hire a contractor or do it yourself?
- ›How does the construction process work?
- ›Money-saving tips for your addition
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€27,500
complete, including foundation and standard finish
average hourly rate
€55
contractor hourly rate (€45–65/hour)
turnaround time
4–12 weeks
depending on type and size
€ Average price by type
| Type of addition or second story | Range | Average price |
|---|---|---|
| Prefab additionReady-made modules, installed quickly | €12,000 – €22,000 | €17,000avg.incl. installation |
| Traditional addition (most popular)Cavity wall or timber frame, fully custom finish | €20,000 – €40,000 | €28,000avg.incl. installation |
| Rooftop addition (extra story)Vertical expansion on the existing roof | €35,000 – €70,000 | €50,000avg.incl. installation |
| Sunroom or verandaLight structure with lots of glass | €8,000 – €18,000 | €13,000avg.incl. installation |
| Kitchen or living room bump-outSmaller addition of 8–15 m² | €15,000 – €30,000 | €22,000avg.incl. installation |
Prices include foundation and standard finish; custom work, permit costs, and installation work are budgeted separately. Based on Google price research.
Material and labor costs
Contractor hourly rate averages €45–65/hour. Structural engineers typically charge €80–120/hour; architects often work for a percentage (6–10%) of the contract price.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Digging and pouring the foundationExcavation, setting formwork, and pouring the concrete slab for the addition | Not recommendedA shallow or uneven foundation causes settling and cracks in the new walls; repairs cost more than the original savings | €2,000–€6,000 | No recommended savings |
| Building the shell (walls and roof)Putting up walls with masonry, timber frame, or prefab and installing the roof structure | Not recommendedStructural errors in load-bearing walls or roof trusses are dangerous and aren't covered by homeowners insurance | €8,000–€20,000 | No legal savings possible |
| Installing window frames and glazingMeasuring, ordering, and setting windows, doors, and HR++ glass into the masonry or framing | With experienceMeasuring and ordering is doable; setting and caulking requires precision to prevent drafty or sagging frames | €2,000–€5,000 | up to €1,200 |
| Laying the floor in the additionInstalling laminate, vinyl, or tile on the poured screed | DoableEasy to do yourself with the right tools; the screed does need to be dry and level before you start | €1,000–€3,500 | up to €2,000 |
| Interior painting and finishingPriming and painting walls and ceiling and installing baseboards | DoableEasy work you can do yourself once the shell is completed | €500–€1,500 | up to €1,000 |
With an addition or second story, the line between doing it yourself and hiring a contractor is clearer than with most other jobs. Foundation, shell, and structural roof work require a licensed contractor and usually a structural engineer with calculations. This is legally required for construction that needs a permit and is checked by the municipality. Installations (electrical, heating, plumbing) must be done by certified electricians, HVAC technicians, and plumbers; faulty electrical or plumbing work can lead to fire or water damage and isn't covered by insurance. The finishing phase does leave room for DIYers: painting, laying floors, installing baseboards, and plastering are jobs where you can save significantly without construction knowledge, up to €3,000–€5,000 of the total budget.
The full process step by step
Arrange the design and permit
An architect or draftsperson prepares construction drawings, including structural calculations if the addition affects load-bearing walls. Through the Omgevingsloket, you check whether a building permit is needed. Permit-free construction is possible for additions that meet the legal maximum dimensions and placement rules.
2–6 weeks
Compare quotes and choose a contractor
Request at least three quotes from licensed contractors based on the same specifications. Pay attention to what is and isn't included: foundation, installations, and finishing are sometimes priced separately. Check reference projects and choose a contractor with proven experience building additions.
1–3 weeks
Excavate and lay the foundation
The contractor digs the foundation to the calculated depth, sets formwork, and pours concrete. After curing, the floor slab or a ventilated crawl space follows, depending on soil conditions. This is the most critical phase: a shallow or uneven foundation causes long-term problems.
1–2 weeks
Build the shell and make it watertight
Walls go up using masonry, timber frame, or prefab modules. Then the roof structure follows with roofing and insulation. Window frames, doors, and glazing are installed and sealed. The shell is made fully weathertight before finishing starts.
2–5 weeks
Install the systems
Licensed electricians, HVAC technicians, and plumbers install the electrical, heating, and any plumbing. Make sure conduits, wall boxes, and sleeves are already built into or cut into the walls during the rough construction phase; opening up walls or the screed later costs hundreds of euros extra.
1–2 weeks
Pour the screed and let it dry
The screed is poured and must dry sufficiently before flooring can be installed. Depending on the type of screed (anhydrite or concrete), this takes 4–8 weeks at normal indoor temperature. Use construction dehumidifiers to speed up the process.
4–8 weeks drying time
Finishing and handover
Plastering, floors, painting, and any plumbing fixtures are finished. Inspect the addition against the construction drawing and specifications, and record any defects in writing. After completion, report the expansion to your municipality so the WOZ value can be recalculated.
1–3 weeks
6 smart money-saving tips
Frequently asked questions
What does an addition or second story cost on average?
On average, you'll pay €27,500 for a complete addition. The range is €12,000 for a small prefab sunroom up to €70,000 for a full rooftop addition with an extra story.
How long does it take to build an addition?
A prefab addition is installed in 2 to 4 weeks. A traditional brick addition takes 6 to 12 weeks depending on its size, the weather, and the subcontractors' schedules.
Do I need a permit for an addition?
Not always. Many additions at the back or side of a home qualify as permit-free construction if they stay within the maximum dimensions in the omgevingsplan (the municipal zoning plan), typically max. 4 meters high and covering max. 50% of the backyard. Always check with your municipality or via the Omgevingsloket (the Dutch government's online permit portal).
Can I build an addition myself?
Foundation and structural work requires a contractor and often a structural engineer. Finishing work such as painting, laying floors, or plastering you can do yourself to save money. Always have the shell built by a licensed construction company.
What does an addition cost per m²?
Expect €1,800 to €2,800 per m² for a traditional brick addition including finishing. A prefab option is cheaper: €1,200 to €2,000 per m². A rooftop addition costs €2,500 to €4,500 per m² because of the extra structural work.
Does an addition increase the WOZ value?
Yes. A well-built addition usually increases the WOZ value (the official Dutch property valuation) and with it the home's sale price. On average, the home's value rises by 60–80% of the construction cost. After completion, report the expansion to your municipality so the WOZ can be recalculated.
Related jobs
Ready to have your addition or second story built?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes