
Cost of converting a bathtub to a shower: everything you need to know
Replacing a bathtub with a shower is a popular bathroom remodel that frees up space and makes daily use easier. The cost depends on the size of the shower, the type of glass shower door or shower enclosure, and the condition of the existing drain and tiles. Read all about prices, materials, and the approach here.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€2,800
incl. materials, labor, and bathtub disposal
average hourly rate
€55
contractor hourly rate (€45–€70/hour)
turnaround time
1–3 days
depending on tiling and drain location
€ Average price by type
| Shower type | Range | Average price |
|---|---|---|
| Simple shower pan with panelsShower pan + plastic or acrylic panels, standard faucet | €1,200 – €2,200 | €1,700avg.incl. installation |
| Walk-in shower with glass panelShower floor or pan, glass shower panel, designer faucet | €1,800 – €3,500 | €2,600avg.incl. installation |
| Complete shower enclosureFully prefab shower enclosure, including installation and hookup | €1,500 – €3,000 | €2,200avg.incl. installation |
| Luxury tiled walk-in showerCustom walk-in shower, large-format tiles, thermostatic faucet, alcove shower | €3,000 – €6,000 | €4,200avg.incl. installation |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Removing and disposing of the bathtubDisconnecting lines, removing the tub, hauling to the dump | DoableRequires some strength and basic knowledge of shutting off lines | €0–€50 (dumpster rental) | €150–€350 |
| Modifying the drain and water supply linesRerouting or modifying the drain and supply lines | Not recommendedRequires a licensed plumber; leaks or drain problems if done wrong | €150–€600 | - |
| Touching up or laying tilesFloor and wall tiles around the new shower | With experienceWatertight finishing (caulk, grout) is crucial; mistakes lead to moisture problems | €100–€400 (materials) | €300–€800 |
| Installing a glass shower panel or shower enclosureMounting and watertight caulking of the glass panel or enclosure | With experienceRead the instructions carefully; watertight caulk seams are essential | €0 (own materials) | €150–€300 |
Removing the bathtub and touching up the tiling are jobs that a DIYer with some experience can handle. This saves you €400–€1,000 on the total cost. Keep in mind, though, that poor caulk seams or insufficiently watertight finishing can lead to moisture damage and mold over time. Always leave modifying the water supply lines and drain to a licensed plumber. Mistakes in the plumbing can cause leaks in the floor or wall, which leads to significant consequential damage. A good plumber also provides a workmanship warranty on the work done.
The full process step by step
Demolition and bathtub removal
The water lines are shut off, the bathtub is detached from the wall, and the drain is disconnected. The bathtub is then removed from the bathroom and hauled away. Damaged tiles are also removed at this point.
2–4 hours
Modifying the drain and lines
The plumber adapts the drain to the new position of the shower drain. If needed, supply lines are rerouted. This is when the floor may need to be opened up to reroute the drain line.
2–6 hours
Tiling and watertight finishing
The floor and walls are touched up or completely retiled. Special attention goes to the watertight finishing around the drain and the transition between floor and wall. Grout and caulk are applied.
1–2 days (incl. drying)
Installing the shower components
The shower pan, walk-in shower floor, glass shower panel, or shower enclosure is installed and caulked watertight. The thermostatic or mixing faucet and showerhead are connected and tested for leaks.
2–4 hours
Final inspection and handover
The contractor checks all connections for leaks, tests the water pressure, and checks the drain. The bathroom is cleaned and handed over. You'll receive instructions for maintaining the caulk and glass panels.
1 hour
4 smart money-saving tips
Frequently asked questions
What does it cost on average to replace a bathtub with a shower?
On average, you'll pay €1,500 to €4,500, depending on the type of shower, the condition of your bathroom, and the amount of tiling. A simple shower pan with plastic panels is cheaper; a luxury walk-in shower with custom tiling costs more.
Do I need to break open the floor for a new drain?
That depends on the position of the existing bathroom plumbing. If the bathtub drain is close to the new shower position, you often won't need to break open the floor. If the drain is somewhere else, it may be necessary to partially open up the floor, which brings extra costs (€150–€400 extra).
Can I keep my bathroom tiles?
In some cases, the existing wall tiles can stay, especially if you install a full glass shower panel or shower enclosure that covers the wall. The floor usually needs to be touched up or retiled, because the bathtub covers a different area than a shower floor.
How long does the remodel take?
Most bathtub-to-shower remodels are done in 1 to 3 days. The first day is for demolition and plumbing changes, the rest for tiling, drying, and installing the shower components. With more extensive tiling, this can increase to 4–5 days.
Which contractors do I need?
For a complete bathtub-to-shower remodel, you'll usually need a plumber for the water and drain work, and a tile setter for the tiling. Some bathroom companies offer a complete package in which one general contractor handles everything.
Related jobs
Ready to have your bathtub converted to a shower?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes