9 min readPrices verifiedBathrooms & Fixtures

Cost of remodeling a bathroom and toilet room: everything you need to know

Remodeling a bathroom or toilet room is one of the most extensive jobs in a home. The cost depends heavily on the size of the room, your choice of materials and fixtures, and whether plumbing needs to be moved. In this overview, you'll find current prices, a breakdown of material and labor costs, and practical tips to save money wisely.

In this article

  • ›Average cost of remodeling a bathroom
  • ›Cost by type of renovation
  • ›Material and labor costs
  • ›Hiring a contractor vs. doing it yourself
  • ›How does a bathroom renovation work?
  • ›Money-saving tips for your bathroom remodel
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€9,500

complete bathroom renovation incl. fixtures

average hourly rate

€60

plumber (€50–75/hour)

turnaround time

3–7 days

depending on scope

€ Average price by type

Type of bathroom renovationRangeAverage price
Refreshing a toilet roomnew toilet, tiles, lighting (same plumbing)€1,500 – €4,000€2,500avg.incl. installation
Refreshing a bathroomnew fixtures, painting, no plumbing rerouting€3,500 – €6,000€4,500avg.incl. installation
Complete renovation (most popular)new fixtures, tiles, plumbing, lighting, and ventilation€6,000 – €12,000€9,000avg.incl. installation
Bathroom + toilet room togethera combined renovation offers economies of scale€8,000 – €18,000€12,000avg.incl. installation
Luxury bathroomwalk-in shower, freestanding tub, radiant floor heating, premium tiles€15,000 – €30,000€20,000avg.incl. installation

Prices include labor costs and standard fixtures; luxury materials or rerouted plumbing increase the cost. Based on Google price research.

Material and labor costs

Fixtures (toilet, sink, tub/shower)material
€2,500€1,200 – €5,000
Floor and wall tilesmaterial
€1,400€600 – €3,000
Bathroom vanity and mirrormaterial
€900€400 – €2,000
Labor (plumber/tile setter)labor
€2,800€1,500 – €4,500
Demolition and removal of old fixtureslabor
€500€300 – €800
Additional costs (caulk, grout, connections)additional
€300€150 – €500

Plumber hourly rate averages €55–75/hour. Tile setters typically charge €45–60/hour.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Demolishing old fixtures and tilesRemoving and disposing of the toilet, shower, tub, and wall tilesDoableNo special permit required; rent a mini dumpster and wear protective clothing€300–€700up to €700
Laying floor and wall tilesSetting new tiles, grouting, and caulkingWith experienceTechnically doable for handy DIYers; a watertight finish around the shower and tub requires precision€800–€2,000up to €2,000
Installing water supply and drain linesConnecting the toilet, shower, tub, and sink to the plumbing systemNot recommendedRequires a licensed plumber; incorrect connections lead to leaks, water damage, and a voided warranty on fixtures€1,200–€3,500No recommended savings
Bathroom electrical workLighting, outlets (IP rating), ventilation, and radiant floor heatingNot recommendedLegally required to be done by a licensed electrician; wet rooms fall under NEN 1010 with strict safety zones€400–€1,200No legal savings possible
Hanging the bathroom vanity and mirrorInstalling the base cabinet, medicine cabinet, and accessoriesDoableEasy to do with basic tools; use the right anchors for tiled walls€150–€350up to €350

When remodeling a bathroom or toilet room, two parts of the job are legally reserved for licensed contractors: the water supply and drain plumbing must be done by a certified plumber, and all electrical work in wet rooms (zones 0, 1, and 2 under NEN 1010, the Dutch standard for electrical installations) must be done by a licensed electrician. Plumbing mistakes cause hidden leaks that only show up after months and can lead to tens of thousands of euros in damage; electrical mistakes pose an immediate risk to life. For these two parts, a contractor is essential, even if you do the rest yourself. What you can do yourself to save money: demolishing the old fixtures and tiles, hauling in materials and removing debris (rent a mini dumpster), setting the new tiles if you have some DIY experience, and installing furniture and accessories after the plumber has finished their work. This realistically saves you €1,000 to €3,000 on the total bill without compromising on safety or quality.

The full process step by step

1

Intake, design, and quote

The plumber or general contractor visits to measure the bathroom and go over your wishes: layout, choice of fixtures, tile plan, ventilation, and whether plumbing needs to be moved. You'll receive an itemized quote with clear line items for materials and labor.

1–2 hours (visit) + 1–2 weeks (quote and approval)

2

Ordering materials and scheduling delivery

Fixtures, tiles, the bathroom vanity, and installation materials are ordered. Standard tiles can be delivered within a week; special sizes or custom fixtures can take 3–6 weeks. The start date of the remodel is matched to the delivery.

1–4 weeks (depending on material lead time)

3

Demolition and clearing the room

The old fixtures (toilet, shower, tub, sink), tiles, and any partition walls are removed. Pipes are capped and debris is hauled away in a mini dumpster. If you do the demolition yourself, make sure the water supply is shut off beforehand.

day 1 (4–8 hours)

4

Plumbing and electrical

The plumber installs new water supply and drain lines or moves existing connection points to the desired locations. At the same time, the electrician runs the wiring for lighting, ventilation, outlets (IP55 or IP67 depending on the zone), and any electric radiant floor heating. This is the most technical part of the renovation.

days 1–3

5

Floor finishing and tiling

The floor is waterproofed (screed or tiling with a waterproof underlayment). Then the floor and wall tiles are set, including a watertight seal in the shower area and around the tub. After drying, the grout is applied and the contractor caulks all seams with sanitary caulk.

days 2–5

6

Installing and connecting fixtures

The toilet, shower (glass shower door), tub, sink, and bathroom vanity are installed and connected to the plumbing. The plumber tests all connections for leaks and pressure. Exhaust ventilation is set to the minimum capacity (15 m³/h for a toilet room, 50 m³/h for a bathroom).

days 5–6

7

Inspection and handover

The contractor walks through the bathroom with you: all connections, the grout, the levelness of the tiling, and the operation of ventilation and lighting are checked. Any minor issues are fixed right away. You'll receive the warranty documents for the fixtures and, if applicable, the electrical inspection certificate.

1–2 hours

What can go wrong?The most common pitfalls when remodeling a bathroom or toilet room: (1) Hidden mold or wood rot behind the existing tiles: only visible after demolition; expect €200–800 extra for repairs. (2) Asbestos in caulk joints or floor coverings in homes built before 1994: this must be removed by a certified asbestos abatement company, and you may not dispose of it yourself. (3) Unexpected plumbing rerouting because existing connection points aren't where you want them: this adds €500–2,000 to the bill. (4) Tile breakage on irregular walls or floors: always order 10–15% extra tiles. (5) Underestimating drying time: the screed and tile adhesive must be fully cured (at least 24–48 hours) before fixtures are installed; loading them too early leads to cracks in the grout.

6 smart money-saving tips

Do the demolition yourselfRemoving the old fixtures and tiles doesn't require expertise. Rent a mini dumpster (€150–250 per week) and save €300–700 on demolition costs. Shut off the water supply before you start, and wear safety glasses and gloves.
Keep existing plumbing where it isMoving toilet, shower, or sink connection points quickly adds €500–2,000 to labor costs. Choose a new layout as close as possible to the existing connection points: the contractor then only has to connect, not reroute.
Combine the bathroom and toilet room in one jobIf you renovate the bathroom and toilet room at the same time, the plumber combines their work. You pay the trip charge once, and the contractor works more efficiently. On average, this saves you 10–20% on the total labor bill.
Buy your tiles yourselfTiles bought through the contractor or general contractor are passed on with a markup of 15–30%. Buy them yourself at a tile store or wholesaler and have them ready on site. Always order 10–15% extra for breakage and cutting.
Choose standard tile sizesSizes such as 30x60 cm or 60x60 cm are widely available and cheaper in both material and installation. Large formats (120x60 cm) are trendy but require a level substrate and more skill, which increases labor costs.
Request at least three quotesLabor costs for a bathroom renovation can vary considerably between plumbers or general contractors: sometimes as much as €1,500–2,500 on a comparable job. With VakmanBaas, you compare quotes from verified contractors near you without having to make calls yourself.

Frequently asked questions

How much does remodeling a bathroom and toilet room cost on average?

On average €9,500 for a complete renovation. Range: €3,500 for a simple refresh up to well over €25,000 for a luxury bathroom with premium finishes.

How long does a bathroom remodel take?

It takes 3 to 7 workdays for a standard renovation. More complex jobs involving rerouted plumbing or reconfiguring the room can take 1 to 2 weeks.

Do I need a permit for a bathroom renovation?

No, in the vast majority of cases no building permit is required. A permit is only needed for major structural changes or changes to the floor plan.

Can I remodel a bathroom myself to save money?

You can do tiling and painting yourself if you're handy, but plumbing and electrical work must be done by a licensed plumber or electrician. If you do everything yourself, you'll save 30 to 50% on labor costs.

What are the biggest cost items in a bathroom renovation?

The three biggest cost items are the fixtures themselves (toilet, shower, tub, sink), the tiles including tiling, and the plumber's labor costs. Together they typically make up 80% of the total budget.

Is it cheaper to renovate the bathroom and toilet room at the same time?

Yes, tackling both rooms at once saves on labor costs because the contractor combines their work. On average, you'll save 10 to 20% compared to two separate jobs.

Related jobs

Ready to have your bathroom or toilet room remodeled?

Describe your job and receive quotes from verified plumbers near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →