Stripping a bathroom or kitchen is the first step of any renovation: tiles, plumbing fixtures, or kitchen cabinets come out, pipes are safely capped, and the room is left bare for the new layout. The cost depends on the size of the room, the amount of tiling, accessibility, and debris removal. With a professional demolition company, the cost of a complete bathroom is usually between €950 and €1,800, including removal; stripping a kitchen costs €500 to €1,100 on average.

In this article

  • ›What does it cost to strip a bathroom or kitchen?
  • ›Prices by type of strip-out
  • ›Labor and additional costs
  • ›Hire a contractor or do it yourself?
  • ›How does the process work?
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€1,350

complete bathroom strip-out (approx. 6 m², incl. removal)

average hourly rate

€45

demolition contractor hourly rate (€40–55/hour)

turnaround time

1–3 days

depending on scope and removal

€ Average price by type

Type of strip-outRangeAverage price
Kitchen strip-out (cabinets, appliances, and tiles)Dismantle kitchen cabinets, remove wall tiles, and cap pipes€500 – €1,100€800avg.incl. labor
Complete bathroom strip-out (most popular)Fixtures, wall and floor tiles out, room left bare incl. removal€950 – €1,800€1,350avg.incl. labor
Toilet room strip-outRemove toilet, small sink, and tiling in a small room€350 – €700€500avg.incl. labor
Bathroom and toilet room strip-out in one goBoth wet rooms stripped at once, one dumpster and one crew€1,200 – €2,200€1,700avg.incl. labor
Full gut incl. pipe removalFully bare down to the structure, old pipes out and capped€1,500 – €2,800€2,100avg.incl. labor

Prices include labor and debris removal, but exclude pipe capping by a plumber and any repair work or new finishing. Based on Google price research.

Material and labor costs

Demolition contractor labor (per hour)labor
€47€40 – €55
Debris dumpster rental (6–10 m³)additional
€350€250 – €450
Disposal fees for construction and demolition waste (per ton)additional
€55€30 – €80
Dust barriers and protective materialsmaterial
€65€30 – €100
Capping water and drain pipes (plumber)additional
€175€100 – €250
Safely disconnecting electrical (electrician)additional
€145€90 – €200

Demolition contractor hourly rate averages €40–€55/hour. Prices may vary by region; always request multiple quotes.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Removing wall and floor tilesChipping out tiling down to the bare wall or floorDoableWith a demolition hammer, safety glasses, and hearing protection, this is hard work but quite doable yourself€300–€600up to €400
Dismantling kitchen cabinets and appliancesUnscrewing and removing cabinets, countertop, and built-in appliancesDoableMostly unscrewing; shut off water and power first and work with two people because of the weight€250–€500up to €350
Removing plumbing fixtures (bathtub, shower, toilet)Dismantling and removing the toilet, sink, bathtub, or shower enclosureWith experienceWater pipes must be shut off and capped first; a leaking connection quickly causes water damage€300–€650up to €300
Disconnecting water, gas, and electricalSafely capping pipes and wiring before demolition startsNot recommendedMistakes lead to leaks, short circuits, or gas hazards; gas work is also reserved for licensed (CO-vrij certified) installers€200–€450No recommended savings
Removing material suspected of containing asbestosOld vinyl flooring, caulk, window sills, or sheet material in homes built before 1994Not recommendedAbove the exemption limits, abatement may legally only be done by a certified company and must be reported to the municipality in advance€500–€1,500No recommended savings

Stripping a bathroom or kitchen is mostly demolition work without structural risk: chipping out tiles, dismantling cabinets, and removing debris is something you can easily do yourself with good tools and some muscle. Still, two parts always call for a contractor. First, disconnecting water, gas, and electrical: a forgotten shutoff valve or a poorly capped pipe can cause water damage or worse during or after demolition. Second, asbestos: in homes built before 1994, asbestos may be present in vinyl flooring, caulk, and sheet material. Above the exemption limits, removing it is legally reserved for certified abatement companies and must be reported to the municipality in advance. A professional demolition company also works with minimal dust, protects the rest of the home, and leaves the room clean and ready for the build-out. That often saves the tile setter or kitchen installer who comes next hours of work.

The full process step by step

1

Site visit and quote

The demolition company looks at the room on site or via photos and assesses the amount of tiling, the plumbing fixtures or kitchen cabinets, and the route the debris must take to get outside. For homes built before 1994, they'll ask about an asbestos survey or recommend one. You receive a quote stating exactly what will be demolished, whether removal is included, and what condition the room will be left in.

1 hour

2

Shutting off and capping utilities

Before the first hammer blow, water, electrical, and any gas in the room are shut off. A plumber caps the water supply and drain pipes, and an electrician de-energizes the circuits. This prevents leaks and short circuits during demolition and is the basis for a safe work area.

2–3 hours

3

Protecting the home and setting up the work area

The walkway from the bathroom or kitchen to the dumpster is covered with hardboard or floor protection runner, and doorways get dust barriers or plastic sheeting. The debris dumpster is placed on your own property or, with a municipal exemption, on the street. Vulnerable areas such as the meter cabinet (where the electricity meter and the breaker panel are) and adjacent floors get extra protection.

1–2 hours

4

Dismantling plumbing fixtures or kitchen cabinets

The loose items go first: toilet, sink, bathtub, and shower enclosure, or the kitchen cabinets with appliances and countertop. Usable items, such as a kitchen in good condition or a freestanding bathtub, are set aside for sale or reuse if agreed. That exposes the tiling for the next step.

3–5 hours

5

Chipping out tiles, ceiling, and screed

Wall and floor tiles are removed with demolition hammers, including the adhesive layer or mortar bed underneath. Where needed, the ceiling system and screed come out too, for example if the new bathroom will have radiant floor heating. This is the heaviest and dustiest part of the job; good dust extraction and keeping things wet limit the dust.

1–2 days

6

Removing debris and leaving the room broom-clean

All debris goes in the dumpster to a licensed processing facility; metal and wood are separated where possible to reduce disposal fees. The room is left broom-clean, and loose edges or protruding wall plugs are removed so the walls are flat.

2–4 hours

7

Handover and check for the next contractor

Together with the demolition contractor, you walk through the stripped room: are all pipes neatly capped, are the walls and floor ready for the tile setter or kitchen installer, and is there no damage to adjacent rooms? Any surprises behind the old tiling, such as damp spots or outdated plumbing, are recorded so you can have them repaired before the build-out.

1 hour

What can go wrong when stripping a bathroom or kitchen?The biggest risks come at the start: demolishing while water or electrical hasn't been disconnected leads to leaks into the floor below or a short circuit in the breaker panel. A second classic is asbestos: old vinyl flooring, caulk, or sheet material in homes built before 1994 that only turns up during demolition and legally halts the work immediately until a certified company has removed it. Overly enthusiastic chipping also regularly damages pipes in the wall or cracks adjacent plaster, and debris removal is often underestimated: a dumpster that wasn't in the quote can easily cost €350 extra. So always ask for a quote that spells out removal, capping, and the handover condition in black and white.

6 smart money-saving tips

Strip the loose items yourselfDismantling kitchen cabinets, unscrewing the shower enclosure, and removing baseboards is mostly unscrewing. By doing this prep work yourself, the demolition contractor only has to do the chipping and breaking. That can easily save €300–€500 in labor hours.
Sell the old kitchen or plumbing fixturesA kitchen in good condition or a freestanding bathtub often brings in €200–€800 through a reseller or an online marketplace. Some resellers even dismantle the kitchen for free. Then you save twice: on demolition costs and on removal.
Combine bathroom, toilet room, and kitchen in one jobIf several rooms are being renovated, have them stripped in one go. One dumpster, one trip charge, and one crew saves €300–€500 compared with two separate jobs.
Haul debris away yourself for small jobsFor a toilet room or small kitchen, the debris often fits in a trailer or in bulk bags. Taking it to the municipal recycling center yourself saves the dumpster rental of €250–€450; residents can usually drop off construction debris there for a small fee or for free.
Have the asbestos survey done before the quoteFor homes built before 1994, a survey in advance (€350–€600) prevents the work from stopping halfway and requiring urgent abatement at top rates. Clarity up front also makes the demolition quote sharper, because the company doesn't need to add a risk surcharge.
Request multiple quotes and compare what's includedPrice differences between demolition companies can reach 30% for the same job. Look beyond the final price: is the dumpster included, who caps the pipes, and is the room left broom-clean? The cheapest quote without removal often ends up being the most expensive.

Frequently asked questions

What does it cost to strip a bathroom or kitchen on average?

Stripping a complete bathroom costs €950–€1,800 on average, including removal; stripping a kitchen costs €500–€1,100. The average bathroom job of about 6 m² comes to around €1,350. The price mainly depends on the amount of tiling and accessibility.

How long does it take to strip a bathroom or kitchen?

A kitchen is usually stripped in one workday. A complete bathroom takes 1 to 3 workdays, including debris removal. On an upper floor without an elevator, or with thick, old tiling set in mortar, it can take an extra day.

Is debris removal included in the price?

With most demolition companies it is, but always check the quote. A debris dumpster costs €250–€450, and disposal fees can run up to €80 per ton. If removal isn't in the quote, the final bill can come out hundreds of euros higher than expected.

Can I strip my bathroom or kitchen myself?

Removing tiles and dismantling kitchen cabinets is doable yourself with good tools and can easily save €400–€700. However, always leave disconnecting water, gas, and electrical to a plumber or electrician, and never touch material suspected of containing asbestos yourself.

What about asbestos when stripping an old bathroom or kitchen?

In homes built before 1994, asbestos may be present in vinyl flooring, window sills, caulk, or sheet material. Above the exemption limits, asbestos may only be removed by a certified asbestos abatement company, and the work must always be reported to the municipality in advance. If in doubt, have an asbestos survey done first (€350–€600).

What are the additional costs of stripping a bathroom or kitchen?

On top of the demolition work, budget for capping water pipes (€100–€250), safely disconnecting electrical (€90–€200), and dumpster rental if it isn't included. If you want the floor leveled or pipes rerouted for the new layout, those are separate items.

Related jobs

Ready to have your bathroom or kitchen stripped?

Describe your job and receive quotes from verified demolition companies near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →