Skip to main content

Are you a contractor? Sign up for free

Contractor working on a complete bathroom renovation in a Dutch home
9 min readPrices verifiedBathrooms & Fixtures

Cost of a complete bathroom renovation: everything you need to know

A complete bathroom renovation is one of the most popular remodels in Dutch homes. The total cost depends on the size of the bathroom, your choice of fixtures and tile, and the amount of plumbing and electrical work. On average, you'll pay between €7,500 and €17,000 for a renovated bathroom of about 9 m².

In this article

  • ›What does a complete bathroom renovation cost?
  • ›Prices by type of renovation
  • ›Material and labor costs
  • ›Hiring a contractor vs. doing it yourself
  • ›How does a bathroom renovation work?
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€11,500

complete: demolition, tile, fixtures, installation

average hourly rate

€55

contractor hourly rate (€45–65/hour)

turnaround time

5–10 days

depending on scope and materials

€ Average price by type

Bathroom renovation typeRangeAverage price
Basic renovationnew tile, replaced fixtures, same pipe layout€3,500 – €6,000€4,750avg.incl. installation
Comfort renovation (most popular)fully renewed: tile, fixtures, lighting, and minor pipe changes€7,000 – €13,000€10,000avg.incl. installation
Extensive renovationpipe relocation, walk-in shower, alcove shower, or bathtub included€13,000 – €18,000€15,500avg.incl. installation
Luxury renovationfull gut and rebuild, premium fixtures and tile, radiant floor heating€18,000 – €25,000€21,500avg.incl. installation

Prices are estimates for a bathroom of about 9 m²; different dimensions, pipe relocation, or premium materials can significantly affect the cost. Based on Google price research.

Material and labor costs

Fixtures (toilet, shower, sink)material
€3,000€1,500 – €5,000
Floor and wall tile (per 9 m²)material
€2,000€800 – €3,500
Demolition and debris removallabor
€850€500 – €1,200
Tile work (about 20–40 hours)labor
€1,700€1,200 – €2,500
Plumbing and installationlabor
€1,400€800 – €2,000
Additional costs (electrical, ventilation, drainage)additional
€700€400 – €1,200

Plumber hourly rate on average €50–65/hour. Tile setter hourly rate on average €45–60/hour. Labor makes up 40–60% of the total renovation cost.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Demolition of existing fixtures and tileremoving toilet, shower or bathtub, sink, and wall and floor tile, including debris removalDoableheavy but technically simple; check for asbestos beforehand in homes built before 1994€500–€1,200up to €700
Floor and wall tile workinstalling wall and floor tile, grouting, and applying a waterproofing layerWith experiencerequires working level, cutting tools, and knowledge of hydrofix; mistakes cause long-term moisture problems€1,200–€2,500up to €1,300
Plumbing and pipesconnecting and possibly relocating supply and drain lines for shower, bathtub, toilet, and sinkNot recommendedmistakes cause leaks behind tile; damage only shows after months; insurance often doesn't cover DIY damage€800–€2,000No recommended savings
Electrical and mechanical ventilationbathroom lighting, outlets, and ventilation system per wet-room standardsNot recommendedwet rooms fall under NEN 1010 safety zone requirements; non-certified installations are uninsured and dangerous€400–€1,200No legal savings possible
Silicone caulk and finishingsilicone caulk around shower, bathtub, and sink, checking grout, and installing baseboardsDoablewith a good caulking gun, masking tape, and patience, this gives a professional result€150–€350up to €200

In a complete bathroom renovation, plumbing and electrical work are the parts where a licensed contractor is essential. Plumbing and installation mistakes behind finished tile only show up months later as moisture damage or mold: repair costs far exceed the 'savings.' Electrical work in bathrooms falls under the NEN 1010 (the Dutch electrical installation standard) safety zone requirements: installations in zones 1 and 2 (within 60 cm of the shower edge or bathtub) may only be done by a licensed electrician. Non-certified work voids your homeowners insurance. What you can do yourself to save costs: demolishing old fixtures and tile is technically simple and only takes time and muscle (savings up to €700). Applying silicone caulk around the shower and sink is also easy to do yourself. Tile work is doable if you have experience working level and own cutting tools; never skip the waterproofing layer (hydrofix or similar) in wet zones.

The full process step by step

1

Site visit and detailed quote

The contractor or plumber comes to measure the bathroom and discusses the desired layout, fixture choices, type of tile, and whether any pipes need to be relocated. You receive an itemized quote with separate line items for demolition, plumbing, tile work, and installation, so you can compare items with other quotes.

1–3 days

2

Demolition and subfloor inspection

Existing fixtures and wall and floor tile are demolished and hauled away. The exposed walls and floor are immediately inspected for moisture damage, mold, or (in older homes) asbestos. Any repairs, such as drying out moisture damage or replacing rotten floor joists, are handled in consultation with you before further work begins.

day 1–2

3

Rough-in: plumbing and electrical

The plumber installs new supply and drain lines or adapts the existing pipes to the new layout. At the same time, the electrician installs bathroom lighting, outlets, and mechanical ventilation in line with the NEN 1010 safety zones for wet rooms. Pipes are measured and photographed before the tile goes over them.

day 2–4

4

Waterproofing layer and tile work

In wet zones (the shower wall, the bathtub, and the floor), the tile setter first applies a waterproofing layer (hydrofix or similar). Then the floor and wall tile are laid and grouted. The tile work dries for at least 24–48 hours before the next phase begins.

day 3–6

5

Installing and connecting fixtures

The toilet, shower pan or walk-in shower, bathtub, sink, and mixing faucets are mounted in their final position and connected by the plumber. Silicone caulk is applied in all corners and around the fixtures. All connections are checked for leaks right away.

day 6–8

6

Ventilation, lighting, and finishing

The electrician makes the final connections for the lighting, ventilation unit, and any radiant floor heating. Baseboards, a mirror cabinet, or accessories are mounted. Small touch-ups (a missing grout line, a crooked mirror) are finished in this phase.

day 7–9

7

Handover and inspection

The contractor walks through the bathroom with you: all water connections are pressurized and checked for leaks, ventilation and lighting are tested, and the tile and grout work are inspected. You receive a warranty document for the work performed.

day 9–10

What can go wrong?The most underestimated pitfall in a complete bathroom renovation is hidden moisture damage behind the old tile. Wet masonry or damaged floor joists only become visible after demolition and can delay the job by several days and €500–€2,000 in repair costs. In homes built before 1994, floors may contain asbestos tile or adhesive: mandatory asbestos removal quickly runs to €1,000–€3,000 and requires a certified abatement company. A second common mistake: cheap tile setters skip the waterproofing layer in the shower and bathtub zone. Moisture problems then only appear after one to two years, long after the warranty period has expired. Always ask in writing for a warranty on both the materials and the workmanship, and have the contractor photograph the waterproofing layer before the tile goes over it.

6 smart money-saving tips

Do the demolition yourselfRemoving the old fixtures and tile yourself and hauling away the debris saves €500–€1,200 in labor costs. First check whether your home was built before 1994, because then an asbestos inspection is wise before you pick up the sledgehammer. Rent a dumpster or order a debris bag; most municipalities also offer free drop-off points for construction debris.
Keep pipes in their current positionRelocating supply and drain lines for the toilet, shower, or sink costs €500–€1,500 extra in plumbing work. By matching the new layout to the existing pipe positions as much as possible, you avoid those extra costs entirely, without making the end result look any worse.
Choose standard tile sizesLarge-format tile (60×120 cm or larger) and special shapes such as hexagon or herringbone require more cutting, more waste, and more labor time from the tile setter. Standard 30×60 cm wall tile and 60×60 cm floor tile are more efficient to install and result in lower labor costs: the visual difference in the end result is minimal.
Compare at least three quotesPrice differences of 20–30% between contractors for identical work are common in bathroom renovations. Always request quotes with the same specifications (same fixtures, same type of tile, same pipe layout) so you're comparing apples to apples. Through VakmanBaas, you receive multiple verified quotes without having to call around yourself.
Plan outside the peak seasonBathroom renovations are most often scheduled in spring (March–May) and early fall (September–October). In January, February, and August, contractors and plumbers have more room in their schedules: this regularly translates into lower prices or waiting times that are several weeks shorter.
Choose a package deal from one contractorIf you hire out demolition, tile work, plumbing, and electrical work separately, you pay for every hour contractors have to wait on each other. A contractor who coordinates the entire job, or a bathroom specialist with their own crew, has lower coordination costs and usually offers a sharper total price than the sum of separate parties.

Frequently asked questions

What does a complete bathroom renovation cost on average?

On average €11,500 for a bathroom of about 9 m². The range is €3,500 (basic renovation) to €25,000 (luxury finish). The main price factors are the size of the bathroom, your choice of fixtures and tile, and the amount of plumbing and tile work.

How long does a complete bathroom renovation take?

On average 5 to 10 workdays. A simple renovation where only the fixtures and tile are replaced takes 3–5 days. If pipes are rerouted or the room is fully gutted, plan on 8–14 days.

Do I need a permit for a bathroom renovation?

In most cases, no. A standard renovation within the existing walls doesn't require a permit. Want to tear down a wall or enlarge the bathroom? Then you may need a building permit. For a historic building, always check with the municipality first.

Can I renovate a bathroom (partly) myself?

Painting, replacing silicone caulk, and installing accessories are things you can easily do yourself. Tile work, plumbing, and electrical work are better left to a contractor: mistakes are costly and can lead to leaks or moisture damage. Save on materials, not on the workmanship.

What are the biggest cost items in a bathroom renovation?

Plumbing and tile work together make up 40–60% of the total cost. Fixtures (shower set, toilet, sink) are the largest material item. Premium tile or a freestanding bathtub can quickly raise the cost by €2,000–€5,000.

How much extra budget should I set aside for unexpected costs?

Keep 10–15% of the total budget in reserve. Common extra costs: hidden moisture damage behind tile, outdated plumbing that needs replacing, or asbestos in the floors of homes built before 1994.

Related jobs

Ready to have your bathroom completely renovated?

Describe your job and receive quotes from verified plumbers and contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →