Cost of installing or replacing bank revetment, sheet piling, or a dock: everything you need to know

Bank revetment or sheet piling keeps the bank in place and stops your yard from slowly eroding into the water. The cost depends on the material (pressure-treated softwood, hardwood, plastic, or steel or concrete sheet piling), the length in linear meters, the retaining height, and how easy it is for the contractor to reach the waterfront. For wooden revetment, expect €60–€220 per linear meter including installation and anchoring; a dock or deck over the water costs €200–€400 per m². For a backyard waterfront of about 20 meters with hardwood revetment, you'll typically pay €2,200–€4,400, around €3,200 on average.

In this article

  • ›What does revetment, sheet piling, or a dock cost?
  • ›Prices by type
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›How does the process work?
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€3,200

average revetment (approx. 20 m hardwood, incl. installation)

average hourly rate

€45

excavation contractor hourly rate (€40–50/hour)

turnaround time

2–4 days

depending on length, material, and access

€ Average price by type

Type of revetment, sheet piling, or dockRangeAverage price
Wooden revetment, pressure-treated softwoodBudget-friendly bank revetment of pressure-treated pine or spruce, per linear meter€60 – €120€85avg.incl. installation
Hardwood revetment, azobé (most popular)Durable hardwood bank revetment with a long lifespan, per linear meter€110 – €220€160avg.incl. installation
Plastic or composite revetmentLow-maintenance, rot-free revetment boards, per linear meter€100 – €190€145avg.incl. installation
Steel or concrete sheet pilingWater-retaining sheet piling for higher pressure or height differences, per linear meter€180 – €400€280avg.incl. installation
Wooden dock or deck over waterMooring or sun dock of hardwood on piles, price per m² of deck area€200 – €400€290avg.incl. installation

Prices for revetment and sheet piling are per linear meter including materials, installation, and anchoring; docks and decks per m² of deck area (indicated by type). Excludes heavy earthwork, driving sheet piling with a crane or pontoon, and any waterschap permit. Based on Google price research.

Material and labor costs

Wooden revetment boards and piles (per linear meter)material
€55€30 – €90
Plastic or composite revetment boards (per linear meter)material
€85€50 – €130
Walers, anchors, and stainless steel fasteners (per linear meter)material
€22€12 – €40
Labor and installation (excavation contractor hourly rate)labor
€45€40 – €50
Earthwork and backfilling or finishing the slope (per linear meter)additional
€35€20 – €60
Delivery and removal, crane or pontoonadditional
€300€150 – €500

Excavation contractor hourly rate averages €40–€50/hour. Prices may vary by region and by how accessible the waterfront is; always request multiple quotes.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Replacing revetment boards (piles still good)Removing and replacing worn boards while the existing piles stay in placeWith experienceDoable if the piles are still solid; work from the bank or a pontoon and make sure the new boards are level and securely fastened€400–€1,200up to €500
Installing new wooden revetment along a long bankDriving piles, mounting and anchoring walers and boards over dozens of metersNot recommendedDriving piles to depth and installing the right anchoring takes equipment and experience; an improperly anchored bank tilts forward after a few years€2,000–€5,000No recommended savings
Installing steel or concrete sheet pilingInstalling water-retaining sheet piling for a large height difference or heavy loadNot recommendedSheet piles must be vibrated, pressed, or driven with a crane or pontoon; this is specialized work and impossible without machinery€3,500–€9,000No recommended savings
Building a wooden dock or deck on existing revetmentMooring or sun dock on piles along a bank that already has revetmentWith experienceVery doable with woodworking experience if the substructure is solid; pay attention to load capacity, laying it level, and stainless steel fasteners against rust€1,500–€4,000up to €700
Backfilling the slope and finishing the bankBackfilling soil behind the revetment, compacting it, and neatly finishing the slopeDoableUnskilled but physically demanding work; easy to do yourself with a wheelbarrow, shovel, and some patience once the revetment is in place€200–€800up to €400

A short, low revetment along a shallow ditch and backfilling the slope are perfectly doable with DIY experience, especially if the existing piles are still solid and you're only replacing the boards. Once the bank gets higher, the soil pushes hard, or sheet piling is involved, it becomes truly skilled work: piles have to go deep enough and straight into the ground, and the anchoring to the land behind determines whether the whole waterfront is still upright in a few years or slowly tilts forward. An excavation contractor has the equipment to drive piles to depth and knows the waterschap rules on the bank line and water flow. Work on or in the water is also hard to undo if something goes wrong, so if you're unsure about height, pressure, or access, a contractor is the safest choice.

The full process step by step

1

Site visit, water level, and measuring

The excavation contractor inspects the waterfront, measures the length in linear meters and the desired retaining height, and assesses the water level and the firmness of the soil. They discuss the material (softwood, hardwood, plastic, or sheet piling), check access for equipment, and check whether the waterschap or municipality requires a permit. Based on this, you'll receive an itemized quote.

1–2 hours

2

Removing old revetment or sheet piling

For a replacement, the old boards and rotten piles are pulled out and hauled away. If the existing piles are still solid, they sometimes stay in place and only the upper part is renewed. Rotten wood and dredged silt that come out must be hauled away: this is part of why replacement sometimes costs almost as much as new revetment.

Half a day

3

Installing piles: vibrating, pressing, or driving

The load-bearing piles are installed along the bank line down to a firm, stable layer. Depending on the soil and material, this is done with a vibratory hammer, by pressing, or by driving from the bank or a pontoon. Depth is crucial: piles that are too short give the bank too little support, so the revetment will shift later.

Half a day–1 day

4

Mounting walers and revetment boards

A horizontal waler is attached to the piles, and the revetment boards or sheet piles are mounted level against it. Everything is secured with stainless steel or hot-dip galvanized fasteners so the connections don't rust away below the waterline. The top edge is finished neatly at the right height.

1–2 days depending on meters

5

Anchoring to the land behind

To keep soil and water pressure from pushing the revetment forward, anchor piles or tie rods are installed that pull the wall back to an anchor point in the land behind. This anchoring, often invisible underground, determines whether the bank stays upright for decades or slowly starts to tilt.

2–4 hours

6

Backfilling the slope and installing a dock if needed

The soil behind the revetment is backfilled, compacted, and the slope neatly finished so no voids remain where soil could wash away. If you also want a dock or deck, the deck piles are set and the boards laid on joists, level and with enough load capacity.

Half a day–1 day

7

Completion and aftercare

The excavation contractor checks the line, height, and anchoring, cleans up silt and construction waste, and hauls away excess material. You'll get maintenance advice: check wooden revetment now and then for loose fasteners and keep an eye on the waterline. The wood usually doesn't need treatment, but an inspection after the first winter is wise.

1 hour

What can go wrong when installing revetment, sheet piling, or a dock?The biggest mistake is piles that don't go deep enough: without support in a firm layer, soil and water pressure push the whole bank forward within a few years, and the revetment tilts into the water. Just as risky is missing or too-light anchoring to the land behind: that's the invisible force that keeps the wall upright. The wrong fasteners take their toll underwater: ordinary steel or galvanized screws rust away and the boards come loose; only stainless steel or heavy hot-dip galvanized hardware holds up. With replacements, hauling away rotten wood and silt is often underestimated, making the job more expensive than expected. And if you start work on the bank line without consulting the waterschap or municipality, you risk having to modify or undo the work.

6 smart money-saving tips

Replace only the boards if the piles are still goodIf the existing revetment piles are still solid and not rotten, you can often have just the boards replaced. That saves driving new piles and can nearly halve the cost compared to completely new revetment.
Choose pressure-treated softwood for less visible banksA hidden ditch bank doesn't always need expensive hardwood. Pressure-treated softwood is much cheaper, easily €50–€100 less per linear meter, and at 15 to 25 years still lasts a good while. Save the hardwood for the visible spots.
Do the earthwork and slope backfilling yourselfBackfilling and finishing the slope behind the revetment is heavy but unskilled work. Let the contractor install the piles and boards, and do the wheelbarrowing, backfilling, and compacting yourself. That can easily save a few hundred euros in labor.
Combine with deck, pond, or yard work in one jobHave the revetment done at the same time as a new deck, pond construction, or other earthwork. The excavation contractor already has their machines, pontoon, and tools on site and then charges delivery, removal, and the trip charge only once.
Make sure the waterfront is easy to reachIf the equipment can get close to the bank, the work goes faster and costs less. Clear shrubs, obstacles, and loose items beforehand and show where the contractor can bring in and haul away materials; a hard-to-reach bank that can only be worked from a pontoon drives the price up considerably.
Request three quotes and compare pile length and anchoringPrice differences between companies for the same bank regularly reach 20–30%. Compare not just the final price but also the type of wood, the pile length, and the anchoring: a cheaper quote with shorter piles or without solid anchoring ends up costing more in the long run.

Frequently asked questions

What does it cost to install or replace bank revetment, sheet piling, or a dock?

Wooden revetment costs €60–€220 per linear meter including materials, installation, and anchoring; plastic or composite costs €100–€190 per meter. Steel or concrete sheet piling is heavier work and costs €180–€400 per meter. A dock or deck over the water is priced per m²: €200–€400. For a backyard waterfront of about 20 meters with hardwood revetment, that comes to €2,200–€4,400, around €3,200 on average.

What's the difference between revetment and sheet piling?

Revetment is light bank protection, boards against driven piles, that gives the waterfront a neat edge and stops erosion. Sheet piling is heavier and truly water-retaining: steel or concrete panels that go deep into the ground and can hold back significant soil or water pressure. For an ordinary garden pond or ditch, revetment is usually enough; you choose sheet piling for a large height difference or when the bank carries a heavy load.

How long does wooden revetment last?

That depends on the type of wood. Pressure-treated softwood lasts 15 to 25 years on average, hardwood such as azobé easily 25 to 40 years. Plastic and composite don't rot and last even longer, but cost more to buy. The piles are often the deciding factor: if they're still solid, replacing just the boards is enough. That saves a lot on cost.

Do I need a permit for revetment or a dock?

Often, yes. Work on or along water usually falls under the waterschap (the regional water authority), which sets rules on the bank line and water flow and sometimes requires a water permit. For a dock or deck over public water, you also regularly need permission from the municipality or the owner of the water. The rules vary by location: always check with your waterschap and municipality before you start.

Does the old revetment have to come out before new revetment goes in?

Not always. If the existing piles are still solid and not rotten, a contractor can sometimes replace just the boards or install new revetment right in front of the old one. If the piles have rotted away or the line is crooked, everything has to come out and new piles are driven. Removing and hauling away old, rotten wood takes extra labor and is a major reason replacement sometimes costs almost as much as new.

Can I install revetment myself?

A short, low revetment along a shallow ditch is doable with DIY experience, as long as you drive the piles deep enough and anchor them properly to the land behind. Once the waterfront gets higher, the soil pushes hard, or sheet piling or a dock on piles is involved, it's skilled work: piles that are installed wrong or too short make the whole bank tilt forward after a few years. An excavation contractor also has the equipment to drive piles to depth.

Related jobs

Ready to have your revetment, sheet piling, or dock installed or replaced?

Describe your job and receive quotes from verified excavation contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →