Removing paving involves breaking up and hauling away tiles, pavers, or concrete slabs in a yard, driveway, or path. The cost depends on the type of paving, the area, the accessibility, and whether the rubble needs to be hauled away.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€12
average price per m² (including haul-away)
average hourly rate
€40–€65
contractor hourly rate (€40–65/hour)
turnaround time
1–2 days
depending on area and type of paving
€ Average price by type
| Paving type | Range | Average price |
|---|---|---|
| Pavers (on sand bed)Concrete tiles or street pavers lifted out | €6 – €12 | €9avg.incl. labor |
| Sidewalk tiles (on sand bed)Concrete sidewalk tiles lifted by hand | €7 – €14 | €10avg.incl. labor |
| Tiles set in mortarMortared tiles, including breaking work | €12 – €22 | €16avg.incl. labor |
| Concrete slabs or poured concreteHeavy demolition, sometimes with a jackhammer | €15 – €30 | €20avg.incl. labor |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Removing pavers or loose tilesOn a sand bed, no mortar or concrete | DoableA crowbar, pry bar, and sturdy gloves are enough | €0–50 | Save €6–12/m² on labor costs |
| Removing tiles set in a mortar bedRequires a jackhammer or demolition drill | With experienceRent tools (€50–100/day); watch out for pipes | €50–120 | Save €8–15/m² on labor costs |
| Breaking poured concreteThick concrete, heavy machinery needed | Not recommendedRisk of damage to foundations or cables; professional tools required | €150+ | The risk of extra damage outweighs the savings |
| Arranging rubble removalOrdering a dumpster and having it picked up | DoableRenting a dumpster yourself is cheaper than going through the contractor | €150–300 | Save €50–100 compared to going through a contractor |
In most cases, you can remove loose pavers and tiles on a sand bed yourself just fine. With the right tools, some muscle, and a good plan, you're done for a fraction of what a contractor costs. Do make sure you file the KLIC notification first to check for cables and pipes in the ground. With tiles set in mortar or poured concrete, it's a different story. The breaking work is intensive, there's a risk of damaging the subgrade or adjacent structures, and hauling away heavy rubble takes planning. In these cases, it pays to hire a demolition contractor who has given you a quote: they work faster and help you avoid costly repairs.
The full process step by step
KLIC notification and preparation
Request a KLIC notification through the Kadaster (the Dutch land registry) to map where cables and pipes are located. Clear the area, remove furniture or plants, and place the dumpster in an accessible spot.
1–2 days in advance
Loosening the paving
Start from a corner or edge. Use a crowbar or chisel to pry up the first stone or tile. With pavers on a sand bed, this goes quickly; with mortar or concrete, you need a jackhammer or breaker.
2–6 hours (depending on m²)
Sorting and stacking material
Sort intact material (reusable or sellable) separately from broken rubble. This makes haul-away cheaper and gives you the option to reuse pavers elsewhere.
At the same time as step 2
Rubble removal
Load rubble into the dumpster or a wheelbarrow. Heavy concrete is broken into small pieces for safe transport. Have the dumpster picked up, or drive to an approved rubble disposal site nearby yourself.
1–3 hours
Checking and leveling the subgrade
Check the subgrade for unevenness, drainage, and a stable base layer. Fill in with sand or crushed stone where needed and level it for the next paving or planting.
1–2 hours
4 smart money-saving tips
Frequently asked questions
What does removing paving cost per m²?
On average, you pay €8–20 per m² to remove paving, including haul-away. Pavers on a sand bed are the cheapest (€6–12/m²); tiles set in mortar or poured concrete cost more (€12–30/m²) because of the intensive breaking work.
Is rubble removal always included in the price?
Not always. Some contractors charge for haul-away separately, as a dumpster line item or a price per ton. Ask up front whether the quote includes haul-away and disposal, so you don't run into surprises.
How long does it take to remove a driveway?
An average driveway of 30–50 m² can be removed in one workday. With heavy poured concrete or hard-to-reach locations, this can stretch to two days. Small paths or patios (< 15 m²) are often done in half a day.
Do I need a permit to remove paving?
For most yards and private driveways, no permit is needed. If you touch the public road or municipal property, you're required to coordinate with the municipality. Also check whether cables or pipes run underground through the KLIC notification system (the Dutch system for requesting maps of underground cables and pipes).
Can I reuse or sell the old pavers?
Yes, pavers and concrete tiles that stay intact can often be reused or sold on Marktplaats. Let the contractor know so they remove the material carefully. This can also lower the haul-away costs.
Related jobs
Ready to have your paving removed?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes