Cost of building and structural drawings: everything you need to know

Building or structural drawings are required for renovations, additions, and new construction. The cost depends on the complexity of the project, the number of drawings, and whether a structural calculation is also needed. On average, you'll pay between €500 and €3,500 in the Netherlands.

In this article

  • ›What do building and structural drawings cost?
  • ›Cost by type of drawing
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›How does the process work?
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€1,500

including structural calculation

average hourly rate

€75

drafter/structural engineer hourly rate (€60–95/hour)

turnaround time

3–10 days

depending on complexity

€ Average price by type

Drawing typeRangeAverage price
Simple building drawingsmall renovation, dormer, or shed€500 – €1,200€800avg.incl. labor
Building drawing + structural calculation (most popular)addition, extension, or wall opening with a steel beam€900 – €2,200€1,500avg.incl. labor
Complete drawings for a newly built homearchitectural drawings, specification drawings, and structure€2,500 – €5,000€3,500avg.incl. labor
Apartment renovation drawinglayout, floor plan, and cross-section€700 – €1,800€1,200avg.incl. labor

Prices are estimates; complex projects with multiple revision rounds may cost more. Based on Google price research.

Material and labor costs

Drafting work (drafting firm hours)labor
€900€400 – €1,500
Structural calculation by a structural engineerlabor
€700€300 – €1,200
Municipal fees (permit)additional
€250€100 – €500
Revised drawings after building inspectionadditional
€150€0 – €400
Printing and digital files (DWG/PDF)material
€50€20 – €100

Drafting firm/structural engineer hourly rate averages €60–95/hour. Structural engineers usually charge a higher rate than drafters.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Sketch floor plan for your own useSketching the spatial layout for orientation or a first meeting with a general contractorFeasibleEasy to do with free or low-cost tools such as Floorplanner or SketchUp Free€0–50up to €800
Permit-ready building drawingScaled floor plans, elevations, and cross-sections with dimensions and legend that meet permit requirementsNot recommendedThe municipality has strict requirements for scale, coding, and completeness; mistakes lead to rejection and weeks of delay€600–1,500No recommended savings
Structural calculation for a steel beam or foundationStatic calculation of load-bearing capacity and loads per Eurocode/NEN standardsNot recommendedLegally required from a certified structural engineer; the municipality doesn't accept self-made calculations€300–1,200No legal savings possible
Small changes to an existing CAD fileRevised drawings after building inspection or a minor dimension change to an existing floor planWith experienceOnly feasible if you have the original DWG file and experience with AutoCAD or similar CAD software€100–400up to €400
Site plan on a map baseTopographic site sketch with cadastral boundaries for the permit applicationWith experienceKadaster.nl offers free base maps; filling in the site sketch yourself is possible but requires knowledge of scale requirements€100–300up to €250

A building permit legally requires professional drawings and a certified structural calculation. A certified drafting firm or architect knows the exact municipal requirements for scale, coding, and content of the drawings: mistakes cost weeks of delay. What's more, the structural calculation may only be prepared by a structural engineer; this isn't a choice but a legal obligation under the Besluit bouwwerken leefomgeving (Bbl) (the Dutch building regulations). You can do exploratory sketches and small CAD changes to an existing file yourself, but for anything the municipality sees, a contractor is essential.

The full process step by step

1

Intake and on-site measurement

The drafter or structural engineer visits the site to accurately measure the existing situation: facades, floor heights, stories, and load-bearing structure. Have any existing drawings, cadastral maps, and building permits ready: every drawing you provide saves measuring hours.

1–2 hours

2

Preliminary sketch design

Based on the survey and your wishes, the drafting firm creates a first sketch design of the new situation. You discuss the layout, dimensions, and any alternatives and give feedback. This is the time to make changes: adjustments later in the process cost more.

2–4 business days

3

Final building drawings

Once the sketch design is approved, the final building drawings are made: floor plans per story, all elevations, cross-sections, and detail drawings. The drawings meet the scale and coding requirements of the municipality and the Omgevingsloket (the Dutch online permit portal).

3–7 business days

4

Structural calculation (if required)

For structural work (a steel beam, removing a load-bearing wall, an addition, a dormer, or a new foundation), a certified structural engineer prepares the static calculations according to Eurocode standards. The structural engineer works closely with the drafting firm so the drawings and calculations match.

2–5 business days

5

Revision and final check

Both parties check the drawings and calculations for completeness and consistency. Small corrections are made. For larger projects, a revision round with the customer may be needed before the package is ready to submit.

1–2 business days

6

Submitting the building permit

With the complete package (building drawings, structural calculation, site plan, and any attachments), the building permit application is submitted via the Omgevingsloket. The drafting firm can handle this in your name. After submission, the municipality decides within 8 weeks (regular procedure) or up to 26 weeks (extended procedure).

1 business day (municipal processing time: 8–26 weeks)

What can go wrong?The most common cause of delay is an incomplete or non-compliant permit application: drawings at the wrong scale, missing elevation drawings, a structural calculation that doesn't match the building drawings, or a site plan that isn't up to date with the cadastral situation. Municipalities send such applications back for correction, which adds weeks to months of lead time. Also check whether the project requires a permit before the drafting starts: some customers start the process and only discover afterward that a welstandscommissie (a municipal design review board) or a protected historic district imposes extra requirements that completely change the drawings.

6 smart money-saving tips

Request at least three quotes from drafting firmsPrice differences between drafting firms for comparable work can reach 40–50%. Request quotes from at least three firms and compare not just the total, but also what's included: the number of revision rounds, whether digital CAD files (DWG) are delivered, and whether the structural engineer is already included in the price.
Provide complete source material yourselfThe less the drafting firm has to look up or measure itself, the lower the invoice. When you place the order, provide: existing building permits, any original drawings of the home, recent photos of the space(s) to be renovated, and the cadastral map from Kadaster.nl (free to download). Every hour less of survey time saves €60–95.
Combine all required drawings in one orderEach separate drawing job has a fixed startup fee for intake and file management. If you have the floor plan, elevations, cross-sections, and site plan made at the same time, you pay those startup costs only once. Separate requests per part cost more per drawing.
Choose a drafting firm over a full-service architecture firmFor a building permit for an addition, dormer, or interior renovation, a specialized drafting firm with an affiliated structural engineer is usually €500–1,500 cheaper than an architecture firm, with a comparable end result for the permit. An architect adds value for style and design questions, not for purely technical drafting.
Ask for a combined rate for the drafting firm and structural engineerMany drafting firms work regularly with a fixed structural engineer and offer a combined all-in rate. Hiring a separate structural engineer yourself alongside the drafting work is generally more expensive than this combined package.
Make sure DWG source files are included at deliveryInclude in the order that you'll receive the original CAD source files (DWG or DXF) at delivery. For a future renovation or permit application, you can then build on the existing drawings instead of having everything measured and drawn again. This easily saves €400–800 on a next order.

Frequently asked questions

What do building and structural drawings cost on average?

On average €1,500, including a simple structural calculation. The range runs from €500 for a small dormer drawing to €5,000 for a complete newly built home.

How long does it take to make a building drawing?

A simple drawing is ready within 3–5 business days. For more complex projects with a structural calculation and multiple revision rounds, expect 7–14 business days.

Do I need a permit for my renovation?

That depends on the work. An addition, dormer, roof extension, or installing a steel beam almost always requires a building permit. Small interior renovations sometimes don't need a permit.

Can I make a building drawing myself?

Technically yes, but a permit application has strict requirements for scale, dimensioning, and content. A professional drafting firm prevents rejections and delays.

What's the difference between a building drawing and a structural drawing?

A building drawing shows the layout, facade, and cross-section of the building. A structural drawing focuses on the load-bearing structure: beams, columns, foundation, and connections. A permit often requires both.

Who is allowed to make a structural calculation?

Only a certified structural engineer can prepare a structural calculation that the municipality accepts. Drafting firms work with a structural engineer for this.

Related jobs

Ready to have your building or structural drawings made?

Describe your job and receive quotes from verified drafting firms and structural engineers near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →