Cost of building and structural drawings: everything you need to know
Building or structural drawings are required for renovations, additions, and new construction. The cost depends on the complexity of the project, the number of drawings, and whether a structural calculation is also needed. On average, you'll pay between €500 and €3,500 in the Netherlands.
In this article
- ›What do building and structural drawings cost?
- ›Cost by type of drawing
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›How does the process work?
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€1,500
including structural calculation
average hourly rate
€75
drafter/structural engineer hourly rate (€60–95/hour)
turnaround time
3–10 days
depending on complexity
€ Average price by type
| Drawing type | Range | Average price |
|---|---|---|
| Simple building drawingsmall renovation, dormer, or shed | €500 – €1,200 | €800avg.incl. labor |
| Building drawing + structural calculation (most popular)addition, extension, or wall opening with a steel beam | €900 – €2,200 | €1,500avg.incl. labor |
| Complete drawings for a newly built homearchitectural drawings, specification drawings, and structure | €2,500 – €5,000 | €3,500avg.incl. labor |
| Apartment renovation drawinglayout, floor plan, and cross-section | €700 – €1,800 | €1,200avg.incl. labor |
Prices are estimates; complex projects with multiple revision rounds may cost more. Based on Google price research.
Material and labor costs
Drafting firm/structural engineer hourly rate averages €60–95/hour. Structural engineers usually charge a higher rate than drafters.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Sketch floor plan for your own useSketching the spatial layout for orientation or a first meeting with a general contractor | FeasibleEasy to do with free or low-cost tools such as Floorplanner or SketchUp Free | €0–50 | up to €800 |
| Permit-ready building drawingScaled floor plans, elevations, and cross-sections with dimensions and legend that meet permit requirements | Not recommendedThe municipality has strict requirements for scale, coding, and completeness; mistakes lead to rejection and weeks of delay | €600–1,500 | No recommended savings |
| Structural calculation for a steel beam or foundationStatic calculation of load-bearing capacity and loads per Eurocode/NEN standards | Not recommendedLegally required from a certified structural engineer; the municipality doesn't accept self-made calculations | €300–1,200 | No legal savings possible |
| Small changes to an existing CAD fileRevised drawings after building inspection or a minor dimension change to an existing floor plan | With experienceOnly feasible if you have the original DWG file and experience with AutoCAD or similar CAD software | €100–400 | up to €400 |
| Site plan on a map baseTopographic site sketch with cadastral boundaries for the permit application | With experienceKadaster.nl offers free base maps; filling in the site sketch yourself is possible but requires knowledge of scale requirements | €100–300 | up to €250 |
A building permit legally requires professional drawings and a certified structural calculation. A certified drafting firm or architect knows the exact municipal requirements for scale, coding, and content of the drawings: mistakes cost weeks of delay. What's more, the structural calculation may only be prepared by a structural engineer; this isn't a choice but a legal obligation under the Besluit bouwwerken leefomgeving (Bbl) (the Dutch building regulations). You can do exploratory sketches and small CAD changes to an existing file yourself, but for anything the municipality sees, a contractor is essential.
The full process step by step
Intake and on-site measurement
The drafter or structural engineer visits the site to accurately measure the existing situation: facades, floor heights, stories, and load-bearing structure. Have any existing drawings, cadastral maps, and building permits ready: every drawing you provide saves measuring hours.
1–2 hours
Preliminary sketch design
Based on the survey and your wishes, the drafting firm creates a first sketch design of the new situation. You discuss the layout, dimensions, and any alternatives and give feedback. This is the time to make changes: adjustments later in the process cost more.
2–4 business days
Final building drawings
Once the sketch design is approved, the final building drawings are made: floor plans per story, all elevations, cross-sections, and detail drawings. The drawings meet the scale and coding requirements of the municipality and the Omgevingsloket (the Dutch online permit portal).
3–7 business days
Structural calculation (if required)
For structural work (a steel beam, removing a load-bearing wall, an addition, a dormer, or a new foundation), a certified structural engineer prepares the static calculations according to Eurocode standards. The structural engineer works closely with the drafting firm so the drawings and calculations match.
2–5 business days
Revision and final check
Both parties check the drawings and calculations for completeness and consistency. Small corrections are made. For larger projects, a revision round with the customer may be needed before the package is ready to submit.
1–2 business days
Submitting the building permit
With the complete package (building drawings, structural calculation, site plan, and any attachments), the building permit application is submitted via the Omgevingsloket. The drafting firm can handle this in your name. After submission, the municipality decides within 8 weeks (regular procedure) or up to 26 weeks (extended procedure).
1 business day (municipal processing time: 8–26 weeks)
6 smart money-saving tips
Frequently asked questions
What do building and structural drawings cost on average?
On average €1,500, including a simple structural calculation. The range runs from €500 for a small dormer drawing to €5,000 for a complete newly built home.
How long does it take to make a building drawing?
A simple drawing is ready within 3–5 business days. For more complex projects with a structural calculation and multiple revision rounds, expect 7–14 business days.
Do I need a permit for my renovation?
That depends on the work. An addition, dormer, roof extension, or installing a steel beam almost always requires a building permit. Small interior renovations sometimes don't need a permit.
Can I make a building drawing myself?
Technically yes, but a permit application has strict requirements for scale, dimensioning, and content. A professional drafting firm prevents rejections and delays.
What's the difference between a building drawing and a structural drawing?
A building drawing shows the layout, facade, and cross-section of the building. A structural drawing focuses on the load-bearing structure: beams, columns, foundation, and connections. A permit often requires both.
Who is allowed to make a structural calculation?
Only a certified structural engineer can prepare a structural calculation that the municipality accepts. Drafting firms work with a structural engineer for this.
Related jobs
Ready to have your building or structural drawings made?
Describe your job and receive quotes from verified drafting firms and structural engineers near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes