Cost of applying for a building permit: everything you need to know
Applying for a building permit is required for rear extensions, additions, dormers, and new construction. The municipality checks whether your building plan complies with the zoning plan and building regulations. The cost depends on the construction cost, the type of permit, and the municipal fees (leges), which can vary widely by municipality.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€1,200
municipal fees + drawings for an average project
average hourly rate
€85
contractor hourly rate (€65–120/hour)
turnaround time
6–8 weeks
depending on municipality and completeness of application
€ Average price by type
| Permit type | Range | Average price |
|---|---|---|
| Small renovation / additionFor example, rear extension, bay window, or small garage | €300 – €1,500 | €750avg.incl. labor |
| Dormer or added storyFront or rear dormer, adding a story | €400 – €2,000 | €950avg.incl. labor |
| Major renovation or new constructionComplete new home, large extension, or commercial building | €1,500 – €10,000 | €4,000avg.incl. labor |
| Permit (extended procedure)Zoning plan deviation, historic building, or complex situation | €2,000 – €15,000 | €6,000avg.incl. labor |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Submitting the application via omgevingsloketFilling in the online form and uploading documents | FeasibleFree to do yourself via omgevingsloket.nl | €0 | Save €150–€300 on application assistance |
| Having construction drawings madeFloor plans, elevations, and cross-sections for the permit | Not recommendedMunicipality requires professional scale drawings | €500–€2,500 | Unavoidable: mandatory documentation |
| Structural calculationsStructural calculations for foundation, floors, and roof | Not recommendedLegally required from a certified structural engineer | €350–€1,200 | Unavoidable: legal requirement |
| Informal preliminary consultation with municipalityChecking feasibility before you submit the formal application | FeasibleCall or email your municipality (often a free consultation) | €0 | Prevents costs from a denial later |
Applying for a building permit consists of an administrative part (you can do it yourself) and a technical part (contractors required). You can submit the application via omgevingsloket.nl yourself: you'll need DigiD or eHerkenning (Dutch digital login systems for individuals and businesses) for this. However, the accompanying construction drawings and structural calculations must be prepared by a certified drafting firm, architect, or structural engineer. This is a legal requirement that municipalities strictly enforce. Don't skimp on the quality of the drawings: an incomplete or incorrect application leads to delay or denial, while the municipal fees have already been paid. Preferably request multiple quotes from drafting firms, and always consult informally with the municipality in advance about the feasibility of your building plan. Based on Google price research.
The full process step by step
Determine whether you need a permit
Check via omgevingsloket.nl whether your building plan requires a permit. Also review the applicable zoning plan for your lot. Not sure? Contact the municipality for a free introductory consultation.
1–3 days
Have construction drawings and calculations made
Hire a certified drafting firm, architect, or building draftsperson to prepare the required construction drawings (floor plans, elevations, cross-sections) and structural calculations. Give them a good site sketch and your wishes.
2–4 weeks
Submit the application via omgevingsloket.nl
Log in with DigiD or eHerkenning and fill in the online application form. Upload all required documents: site plan, construction drawings, structural calculations, and any additional attachments. Pay the fees after submitting.
1–2 days
Wait for the municipality's review
Under a regular procedure, the municipality has 8 weeks. During that period, the municipality may request additional information. Respond quickly to avoid delays. You'll receive the decision by mail or digitally.
6–8 weeks
Start construction after approval
Only start building once the permit is final. The permit becomes final 6 weeks after approval if no objection has been filed. Always keep the permit and approved drawings at the construction site.
After 6-week objection period
4 smart money-saving tips
Frequently asked questions
What does applying for a building permit cost in the Netherlands?
The cost consists of two parts: municipal fees (1–4% of the construction cost) and the cost of drawings and calculations (€500–€2,500). For an average renovation project of €25,000, expect €750–€2,000 in total. Fee rates vary widely by municipality: check your municipality's fee schedule.
Can I apply for a building permit myself?
Yes, you can apply for a permit yourself via omgevingsloket.nl (the Dutch government's online permit portal). You do need professional construction drawings and structural calculations made by a certified drafting firm or architect. You can handle the application process yourself, but you'll need to have the technical documents prepared.
How far in advance should I apply for a building permit?
Under a regular procedure, the municipality has a maximum of 8 weeks after receiving a complete application. Add 4–6 weeks for having the drawings and calculations made. So plan your application at least 3–4 months before the desired start date of the work.
What's the difference between permit-free building and a permit?
Permit-free building is allowed for small structures that meet specific requirements of the Besluit omgevingsrecht (Bor, a Dutch decree on environmental law), such as an outbuilding of up to 50 m² at the rear of a home. If your building plan is larger, at the front, or deviates from the zoning plan, you'll always need a permit. Check this via omgevingsloket.nl or with your municipality.
Do I get the municipal fees back if the permit is denied?
No, in most cases municipal fees aren't (fully) refunded if the permit is denied. Municipalities charge fees for processing the application, regardless of the outcome. That's why you should always have your plan informally reviewed in advance to see if it has a chance of success. Some municipalities charge a lower amount for a denial than for an approval.
Related jobs
Ready to have your building permit application handled?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes