Cost of pouring a cement screed floor: everything you need to know
A cement screed floor is a poured, self-leveling subfloor made of cement-based mortar that creates a flat, load-bearing base under tile, hardwood, or vinyl (PVC) flooring. The cost depends mainly on the area in m², the thickness of the screed, the finish you want, and how accessible the room is. In renovations, removing the existing floor and any radiant floor heating also play a big role in the final price.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€2,800
average for a 60 m² living room
average hourly rate
€45–€65
contractor hourly rate (€45–65/hour)
turnaround time
1–2 days
depending on area and drying time
€ Average price by type
| Screed type | Range | Average price |
|---|---|---|
| Traditional cement screedApplied by hand, 50–80 mm thick | €20 – €40 | €30avg.incl. installation |
| Self-leveling cement screedPoured, smooth finish, 30–60 mm thick | €28 – €50 | €38avg.incl. installation |
| Anhydrite screed (calcium sulfate)Liquid, suitable for radiant floor heating | €25 – €45 | €35avg.incl. installation |
| Screed including demolitionRemoving existing floor, pouring new | €40 – €70 | €55avg.incl. installation |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Small leveling job (< 5 m²)Ready-mixed leveling compound, thin layer | DoableWith good preparation and instructions | €50–150 | €100–200 |
| Pouring a screed (> 20 m²)Self-leveling mortar, finished correctly | With experienceLarge margin of error with height differences | €600–1,200 | €400–800 |
| Screed with radiant floor heatingEmbedding pipes, pressure test, correct thickness | Not recommendedPipe damage or frost damage is costly | €1,500–3,500 | - |
| Demolishing the existing floorBreaking out, dust, rubble removal | With experienceWatch load-bearing capacity and dust control | €300–700 | €150–300 |
Leveling small areas with ready-mixed compound is doable for DIYers if the subfloor is flat and dust-free and the layer stays limited to a few millimeters. Online tutorials and the instructions on the packaging give you enough guidance. For complete screeds over 20 m², when radiant floor heating is present, or when precise flatness is required for durable hardwood or large-format tile, a professional screed contractor is really the better choice. Mistakes in the work (cracks, height differences, poor bonding) only show up after the finished floor has been laid, and they're then very costly to fix.
The full process step by step
Preparing the subfloor
The existing floor is checked for flatness, bonding, and cracks. Loose parts are removed, and vacuum cleaners and partition walls are protected. A primer or bonding agent is applied to guarantee the screed bonds properly.
2–4 hours
Placing edge strips
A compressible edge strip is placed along all walls. It creates a floating screed that can expand freely with temperature changes and prevents cracking along the edges.
30–60 minutes
Mixing and pouring the mortar
The cement mortar or liquid anhydrite is mixed and spread across the floor. Self-leveling products largely spread on their own; traditional screeds are finished by hand with a screed board on leveling pins set to the right height.
4–8 hours (depending on area)
Finishing and leveling
The contractor smooths the screed with a leveling and finishing straightedge. Any high spots are then touched up. After pouring, no one may walk on the floor for 24 hours.
1–2 hours
Curing and moisture testing
The floor cures for 28 days (cement) or 7–14 days (anhydrite). Before the finished floor is laid, the moisture content is measured with a CM test to confirm the screed is dry enough.
7–28 days drying time
4 smart money-saving tips
Frequently asked questions
How much does a cement screed floor cost per m²?
On average, you pay €25 to €55 per m², including materials and labor. Traditional cement screeds are at the low end, while self-leveling or anhydrite versions cost a bit more. For small areas, the cost per m² is relatively higher because of the contractor's fixed work.
How long does it take to pour a screed floor?
The actual pouring and finishing usually takes one workday for an average living room (50–80 m²). The drying time is much longer: allow at least 28 days for a cement screed and 7–14 days for an anhydrite screed before you lay the finished floor on top.
Do I need a building permit for a new screed floor?
In most cases, you don't need a permit to replace or pour an interior floor. If it involves structural work, an addition, or demolition of load-bearing floors, it's wise to check with the municipality. If in doubt, ask your general contractor for advice.
Can radiant floor heating go under a cement screed?
Yes. Radiant floor heating is often embedded in a screed. Anhydrite screeds are especially suitable because the material conducts heat well. Make sure the radiant floor heating has been pressure-tested before pouring and is kept at minimal pressure while the screed cures to prevent cracks.
When should I choose an anhydrite screed instead of cement?
Anhydrite is a good choice for large areas, radiant floor heating, and when you want a thin, very flat layer. The downside is that anhydrite is sensitive to moisture: in bathrooms, kitchens, or rooms with moisture problems, a cement screed is more reliable. Always discuss this with your contractor.
Related jobs
Ready to have a cement screed floor poured?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes