Cost of roof sheathing: everything you need to know

Roof sheathing is the wooden base layer of your roof and provides the foundation for roofing, insulation, and structural strength. The cost depends on the area to be covered, the type of wood you choose, the condition of the existing structure, and how accessible the roof is. When replacing it, demolition costs and any extra repairs to the roof structure also play a role.

In this article

  • ›Average cost
  • ›Prices by type
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›Step by step
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€3,200

average for a standard row house (approx. 50 m²)

average hourly rate

€55

contractor hourly rate (€45–70/hour)

turnaround time

1–2 days

depending on roof area and condition of the structure

€ Average price by type

Type of roof sheathingRangeAverage price
Spruce sheathing (standard)Most commonly used wood, suitable for most pitched roofs€1,200 – €3,500€2,200avg.incl. installation
OSB panels (oriented strand board)Strong and dimensionally stable, popular in new construction and renovation€1,500 – €4,000€2,600avg.incl. installation
Douglas fir or larchMore durable wood, better resistant to moisture€2,000 – €5,500€3,500avg.incl. installation
Full replacement incl. demolitionRemove and haul away old sheathing, then install all-new€2,500 – €6,500€4,200avg.incl. installation

Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.

Material and labor costs

Roof sheathing wood or OSB (material)material
€14€8 – €22
Fasteners (nails, screws)material
€2€1 – €3
Installation labor per m²labor
€24€15 – €35
Scaffolding or aerial liftadditional
€350€150 – €600
Demolition and removal of old sheathingadditional
€450€200 – €800
Wood preservative or impregnating agentmaterial
€200€100 – €350

Hourly rates vary by region and contractor.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Replacing a single board (small rotten section)Up to 1–2 m², reachable through an attic windowFeasibleBasic carpentry experience required€30–80€100–200
Partial replacement (5–15 m²)Multiple boards or OSB panels, scaffolding recommendedWith experienceKnow how to use scaffolding and roof safety€200–600€300–700
Full replacement (entire roof surface)Remove roofing, replace sheathing, and resealNot recommendedRisk of leaks and falls if done without experience- (contractor required)-
Inspection and adviceAssess extent of rot, find the causeWith experienceBorescope or roof hatch needed for an accurate assessment€0 (yourself) vs. €75–150€75–150

Replacing roof sheathing seems simple, but it always involves working at height, temporarily removing the roofing, and properly connecting all the layers. A mistake in the connections or fastening can lead to leaks, moisture damage, or in the worst case an unstable roof. Small, accessible repairs are feasible for a handy DIYer. For anything bigger than a few boards, hiring a licensed roofer or carpenter is strongly recommended. The extra cost outweighs the risk of water damage or a dangerous fall.

The full process step by step

1

Inspection and quote

A roofer or carpenter inspects the roof sheathing from the outside and, if possible, from the inside through the attic. They determine the extent of the damage, the type of wood needed, and whether extra structural repair is required. Based on this, you receive an itemized quote.

0.5–1 hours

2

Setting up scaffolding or an aerial lift

Scaffolding or a mobile aerial lift is set up so work at height can be done safely. In most cases this is included in the quote, but always check. The scaffolding stays up for 1–3 days on average.

Half a day

3

Removing the roofing

The existing roof tiles, roll roofing, or slates are carefully removed and stacked separately or hauled away. The condition of the roof battens and purlins is checked right away for additional damage.

2–4 hours

4

Removing old sheathing and installing new

The damaged roof sheathing is detached and hauled away. New boards or OSB panels are cut to size and fastened to the purlins or rafters with nails or screws. Connections at roof edges, ridges, and valleys get extra attention.

4–8 hours

5

Reinstalling the roofing and finishing

After an underlayment or vapor barrier is installed, the roof tiles or other roofing material are put back and checked for proper overlap and watertightness. The scaffolding is taken down and the area around the home is cleaned up.

2–4 hours

What can go wrong?If the roof sheathing is poorly connected or the underlayment is forgotten, water can get in, leading to moisture damage to insulation, ceilings, and structural wood. Improperly fastened sheathing can also come loose in a storm. Always make sure your contractor gives a workmanship warranty, and check after the first heavy rain that the roof is watertight.

4 smart money-saving tips

Combine with other roofing workHave the roof sheathing replaced at the same time if your roofing or roof insulation also needs renewing. The roof will be open anyway, so you save on scaffolding costs and labor time by having everything done at once.
Request at least three quotesPrices for roofing work vary widely by region and contractor. By comparing three quotes with the same scope (including material, demolition, and removal), you get a realistic view of the market and room to negotiate.
Choose OSB as a cost-efficient materialOSB panels are cheaper than solid wood, hardly less durable, and move less with temperature changes. For most Dutch homes, OSB is an excellent choice that saves you €5–10 per m² compared to high-quality solid boards.
Treat the wood preventivelyHave new roof sheathing treated with an impregnating agent or wood preservative. The extra cost (approx. €100–350) significantly extends its lifespan and prevents costly rot repairs within 10 years.

Frequently asked questions

What does it cost on average to have roof sheathing installed?

For a standard row house with about 50 m² of roof, you can expect to pay an average of €2,000–€4,500 including material, labor, and VAT. The exact price depends on the type of wood, the roof area, and whether demolition is needed. Based on Google price research.

Which type of wood is best for roof sheathing?

Spruce is the most widely used and affordable choice for roof sheathing. For better moisture resistance, choose Douglas fir or larch. OSB panels are becoming more popular because they're dimensionally stable, move little, and insulate well. Your roofer or carpenter can advise which type suits your situation.

Do I need a permit for new roof sheathing?

Replacing existing roof sheathing without changing the roof shape usually doesn't require a building permit. If you change the structure or the roof area, or if your home is in a protected historic district, it's a good idea to check with the municipality.

How can I recognize rotten roof sheathing?

Signs of rotten roof sheathing include dark stains or mold on the sheathing from the inside, sagging roofing, water damage on the attic ceiling after rain, and swarms of gnats in the attic. If in doubt, you can have a roofer or carpenter do a visual inspection.

Can I combine roof sheathing with roof insulation?

Yes, and it's highly recommended. Replacing the roof sheathing is the ideal moment to add roof insulation as well: either from above (cold roof or warm roof construction) or from the inside in the attic. This saves on labor costs because the roof is already open.

Related jobs

Ready to have your roof sheathing done?

Describe your job and get quotes from verified contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →