Skip to main content

Are you a contractor? Sign up for free

Contractor installing EPDM roofing on a Dutch home
8 min readPrices verifiedRoofing

Cost of EPDM roofing: everything you need to know

EPDM is a durable rubber roofing membrane that's widely used on flat roofs and dormers. The cost depends on the roof area, the thickness of the EPDM membrane, the condition of the roof deck, and the roofer's labor costs. A properly installed EPDM layer lasts 30 to 50 years on average.

In this article

  • ›Average cost
  • ›Prices by type
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›Step by step
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€3,200

average for a 40 m² flat roof

average hourly rate

€45–€65

contractor hourly rate (€45–65/hour)

turnaround time

1–2 days

depending on roof area and preparation

€ Average price by type

Roof type / jobRangeAverage price
Dormer or bay windowSmall area, 5–15 m²€400 – €1,200€750avg.incl. installation
Standard flat roofHome or addition, 20–50 m²€1,200 – €4,000€2,500avg.incl. installation
Large flat roofGarage or commercial building, 50–100 m²€3,500 – €8,000€5,500avg.incl. installation
Complete roof replacement packageIncluding insulation and new roof build-up€5,000 – €14,000€9,000avg.incl. installation

Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.

Material and labor costs

EPDM membrane (1.2 mm)material
€11€8 – €14
EPDM membrane (1.5 mm, premium)material
€17€14 – €22
Adhesive, primer, and seam tapematerial
€5€3 – €7
Roofer labor costslabor
€37€25 – €50
Removal of old roofing materialadditional
€200€100 – €350
Roof deck repair (if needed)additional
€400€150 – €800

Hourly rates vary by region and contractor.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Installing EPDM on a small roof (< 10 m²)Dormer, bay window, or garden shedWith experienceTechnically feasible, but seam finishing is critical€150–300 materials€300–600
Installing EPDM on a large roof (> 20 m²)Home, addition, or garageNot recommendedRisk of leaks from improper seams and fastening€600–1,500 materials€900–2,500
Small repair or sealing a seamCrack, blister, or loose edgeFeasibleDoable yourself with EPDM tape and cleaner€20–60 materials€100–250
Assessing and repairing the roof deckRotten wood, sagging roof panelsNot recommendedStructural assessment requires expertiseN/A-

Installing EPDM on a small area is something you can do yourself with the right materials and instructions. Success, however, depends entirely on the seam finishing: poorly bonded seams or badly finished connections at roof penetrations are the most common cause of leaks. For roofs larger than 15–20 m², or if you're unsure about the condition of the roof deck, a certified roofer is the safest choice. A professionally installed EPDM layer also often comes with a 10- to 20-year workmanship warranty, which doing it yourself rarely offers.

The full process step by step

1

Inspection and quote

The roofer inspects the condition of the roof structure, the roof decking, and the existing roofing. Based on this, they draw up a quote with the required materials and labor hours.

1–2 hours

2

Removing the old roofing

If the old roof is stripped, the existing bitumen, gravel, or other roofing is removed and hauled away. Damaged roof boards are replaced at the same time.

2–4 hours

3

Applying the base layer and primer

The roof decking is cleaned and, if needed, treated with a primer so the EPDM adhesive bonds well. For a new roof build-up, the insulation board is laid first.

1–2 hours

4

Laying and bonding the EPDM membrane

The EPDM membrane is rolled out, cut to size, and secured to the roof surface with contact adhesive. Edges, corners, and roof penetrations are carefully finished with seam tape and pipe boots.

3–6 hours

5

Final inspection and handover

After installation, the roofer checks all seams, connections, and drain points for watertightness. You receive a completion document with the warranty terms.

30–60 minutes

What can go wrong?The most common problems are: poorly bonded seams that let water run underneath, incorrectly finished roof edge trims that come loose in the wind, and forgotten or poorly sealed roof penetrations (chimney, vent pipe, skylight). After the first heavy rain, check that no water has gotten in, and if you're in doubt, contact your roofer right away.

4 smart money-saving tips

Request at least three quotesPrices for EPDM installation can vary widely between contractors. By comparing three quotes, you save an average of 15–25% compared to the first quote you receive.
Combine with insulationIf you're working on the roof anyway, it's the ideal time to add roof insulation. The labor costs for the build-up are shared, and you benefit right away from lower heating costs and possibly a better energy label.
Choose the right seasonRoofers are less busy in winter. Request quotes in November or December for a job carried out in the spring; some contractors then offer a 5–10% discount.
Check for subsidy optionsIf the EPDM roofing is combined with roof insulation, you may qualify for the ISDE subsidy (a Dutch government subsidy for sustainable energy) or a municipal sustainability loan. Check with your municipality before you hire anyone.

Frequently asked questions

How much does EPDM roofing cost per m²?

Including labor, you can expect an average of €50 to €90 per m². The lower end applies to larger, rectangular roofs without obstacles; around roof penetrations, edges, and dormers, the price goes up because of the extra finishing work.

What's the difference between EPDM and bitumen roofing?

EPDM is a rubber membrane that can be installed in one piece, so there are fewer seams. Bitumen consists of multiple layers of asphalt sheeting that are glued or torched on. EPDM lasts longer (30–50 years); bitumen is cheaper to buy but usually has a shorter lifespan (15–25 years).

Does EPDM need maintenance?

EPDM is low-maintenance. An annual inspection (where you check for damage, lifting edges, or clogged drains) is enough. You can seal small cracks with EPDM tape; larger repairs are better left to a roofer.

Does the old roofing always have to be removed?

Not always. If the roof structure and the existing roof decking are in good condition, EPDM can sometimes be installed over the old layer. A contractor assesses this on site. With multiple layers or rotten wood, removal is required to prevent problems.

Does insurance cover a new EPDM roof?

Standard homeowners insurance usually covers damage from sudden events (storms, hail), but not wear or leaks caused by deferred maintenance. Check your policy terms and ask your insurer for clarity before you have the job done.

Related jobs

Ready to have EPDM roofing installed?

Describe your job and receive quotes from verified contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →