Cost of going gas-free: everything you need to know
Going gas-free means replacing your gas connection with an electric heating system, usually a heat pump combined with improved insulation. The total cost depends on the type of heat pump you choose, the condition of your current insulation, and whether you have the gas connection removed. On average, you'll pay between €8,000 and €30,000 all-in.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€12,500
all-electric heat pump incl. installation and insulation
average hourly rate
€65
contractor hourly rate (€55–80/hour)
turnaround time
2–5 days
depending on heat pump type and insulation package
€ Average price by type
| Approach | Range | Average price |
|---|---|---|
| Hybrid heat pump (step 1, most popular)heat pump plus existing central heating boiler as backup, no full insulation required | €6,200 – €9,500 | €7,800avg.incl. installation |
| All-electric air-to-water heat pumpfully electric, no gas needed, home must be well insulated | €10,000 – €20,000 | €14,500avg.incl. installation |
| All-electric ground source heat pumphighest efficiency, ground drilling needed, ideal for well-insulated homes | €18,000 – €32,000 | €24,000avg.incl. installation |
| All-electric + insulation package + solar panelscomplete approach: heat pump, roof insulation, cavity wall insulation, and 10–14 panels | €22,000 – €45,000 | €30,000avg.incl. installation |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Connecting the heat pump to the heating system and electricalconnect outdoor unit, indoor unit, buffer tank, and heavy-duty circuit | Not recommendedLegally reserved for a licensed heat pump installer; required for ISDE subsidy | €1,500–3,500 | No legal savings possible |
| Carrying out insulation measuresblow in cavity wall insulation, install roof insulation, lay floor insulation | With experienceBlowing in cavity wall insulation requires specialized equipment; interior roof insulation is doable for a skilled DIYer | €1,500–8,000 | up to €1,500 |
| Having the gas connection removedcancel with the grid operator and remove indoor gas lines | Not recommendedGas network work is legally reserved for the grid operator or a certified gas company | €0–500 | No legal savings possible |
| Applying for the ISDE subsidy through RVOfill out and submit the subsidy form after completion | DoableThe RVO portal is open to private individuals; you have 24 months after installation | Free | €1,700–3,700 subsidy |
The core of the switch to gas-free living (connecting the heat pump to the heating system and the electrical installation) is legally reserved for licensed heat pump installers. The same applies to all work on the gas line and having the gas connection removed by the grid operator. Doing it yourself isn't an option here, and you'd also lose your right to the ISDE subsidy, which is only paid out when installation is done by a certified company. Where you as a resident do have influence: the preparatory insulation work on the inside of the roof or in the crawl space is doable with some experience and can save a lot. You can submit the ISDE subsidy application to RVO (the Netherlands Enterprise Agency) yourself after completion: make sure you have the installation certificate and the invoice at hand. Plan the different parts of the job smartly: insulate first, then install the heat pump, so the installer can size the right capacity.
The full process step by step
Home assessment and consultation
A heat pump installer or independent energy advisor assesses your home's insulation level (facade, roof, floor, and windows), the current heating system, and the condition of the breaker panel. Based on this, you get advice on the most suitable type of heat pump, the required capacity, and which insulation measures pay off before installation. This is the most decisive step: an undersized heat pump in a poorly insulated home is a costly mistake.
1–2 hours
Carrying out insulation measures
If the home isn't well insulated yet, cavity wall insulation, roof insulation, or floor insulation is installed before the heat pump goes in. The order is deliberate: better insulation lowers heat demand, which allows a smaller (and cheaper) heat pump unit and permanently increases efficiency.
1–5 workdays
Installing the heat pump
The outdoor unit is placed on a stable base. The indoor unit or hydraulic module is mounted in the utility room. The installer connects the heat pump to the existing piping, installs a buffer tank or hot water tank, and runs a heavy-duty electrical circuit from the meter cabinet (where the electricity meter and the breaker panel are). For a ground source heat pump, the ground drilling is done in this phase by a specialized drilling crew.
1–3 workdays
Shutting off and removing the gas connection
If you're going fully gas-free, you report this to your regional grid operator (such as Stedin, Liander, or Enexis). They schedule a shutoff appointment when the gas supply is permanently cut off and the meter is removed. The indoor line is capped or removed by a certified gas company. In most regions, there's little or no cost involved.
1 day (by appointment with the grid operator, waiting time varies)
Adjustment, completion, and subsidy application
The installer programs the heating curve based on the outdoor temperature, sets the room temperature and hot water temperature, and checks the hydraulic balance. After completion, you receive the installation certificate and the invoice: the documents you need for the ISDE subsidy application through the RVO portal.
2–4 hours
4 smart money-saving tips
Frequently asked questions
What does going gas-free cost on average?
The average cost ranges from €7,800 for a hybrid heat pump to more than €30,000 for a fully all-electric approach including insulation and solar panels. The most popular route, a hybrid heat pump in a reasonably insulated home, costs about €7,800 on average including installation.
How long does it take to go gas-free?
Installing a hybrid heat pump takes 1 to 2 workdays. If insulation measures are also needed, add 2 to 5 extra workdays depending on the insulation package. Ground drilling for a ground source heat pump takes a separate 1 to 2 days.
Do I need to insulate my home before going gas-free?
Not necessarily. With a hybrid heat pump, you can start without fully insulating; the central heating boiler kicks in when heat demand is high. For an all-electric system, good insulation is essential: in a poorly insulated home, the heat pump runs at too high a flow temperature, which lowers efficiency and drives up your energy bill.
How much subsidy do I get when going gas-free?
Through the ISDE subsidy, you receive €1,700 to €3,700 toward the heat pump. Through the SEEH subsidy (Subsidie Energiebesparing Eigen Huis), insulation measures are also eligible. Some municipalities offer additional local subsidies. Check the current amounts on RVO.nl.
Does the grid operator pay for removing the gas connection?
In most cases, the regional grid operator removes the gas connection free of charge or for a small administrative fee (usually €0 to €150). In some regions, temporary campaigns also cover free removal of the indoor gas lines. Contact your grid operator for the current arrangement.
Related jobs
Ready to have your home made gas-free?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes