Pointing and grouting give your facade or tiling a watertight, attractive finish. The cost of pointing a facade or grouting tiles depends on the surface area, the type of joint, and the condition of the existing joints. On average, you'll pay €30 to €60 per m², including labor and materials.

In this article

  • ›Average cost of pointing a facade or grouting tiles
  • ›Prices by type of pointing
  • ›Material and labor costs
  • ›Hire a contractor or do the pointing yourself?
  • ›Step by step: how does the pointing work go?
  • ›Money-saving tips for pointing
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€2,100

average home (50–60 m²)

average hourly rate

€45

contractor hourly rate (€40–55/hour)

turnaround time

1–3 days

depending on facade area

€ Average price by type

Type of pointingRangeAverage price
New pointing (new construction or smooth brickwork)Flush or concave joint, no raking out needed€20 – €35€27avg.incl. labor
Repointing (most popular)Raking out old joints + new pointing, average home€30 – €60€45avg.incl. labor
Decorative facade jointRecessed or raised ribbon joint, more craftsmanship required€50 – €90€70avg.incl. labor
Grouting tiles (bathroom or kitchen)Epoxy or cement grout, per m² of tiled area€15 – €35€25avg.incl. labor
Full facade job, row houseRaking out + pointing entire facade, approx. 50–60 m²€1,500 – €3,600€2,100avg.incl. labor

Prices per m² including labor and materials; raking out old joints is charged separately (€8–€18/m²). Based on Google price research.

Material and labor costs

Pointing mortar (25 kg bag)material
€25€15 – €35
Mortar pigment and additivesmaterial
€40€20 – €60
Labor for raking out old joints (per m²)labor
€13€8 – €18
Labor for applying new joints (per m²)labor
€30€20 – €40
Scaffolding or aerial lift costs (if needed)additional
€300€150 – €500
Cleaning and sealing afterwardadditional
€100€50 – €200

Pointing contractor hourly rate averages €40–€55/hour. Scaffolding costs (€150–€500) are not included in the price per m².

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Grouting tiles in a bathroom or kitchen (small area)Up to approx. 5 m², flat surface, cement grout without raking outDoableCement grout mix is easy to apply with a grout float and damp sponge; no special tools needed€20–€50 materialsup to €150
Facade repointing (limited area)Approx. 5–15 m², easy to reach without scaffolding (ground floor)With experienceThe right mix ratio, a joint depth of 2 cm, and pre-treatment are crucial; mistakes lead to leak streaks on the wall€50–€130 materialsup to €500
Facade pointing at height or full repointingAbove 3 m, scaffolding required, raking out and repointing entire facadeNot recommendedScaffolding, pneumatic raking tools, and years of trade experience are required; faulty pointing lets in moisture that damages the bricks€1,500–€3,600 totalNo recommended savings
Applying decorative or recessed facade jointsDecorative ribbon or recessed joint in a face brick facadeNot recommendedRequires a clean joint cut, even depth, and exact joint profile choice; uneven work stays permanently visible and can't be corrected without full repointing€50–€90 per m²No recommended savings
Epoxy grouting in a bathroom (renovation)Removing old grout and applying epoxy grout, wet areaWith experienceEpoxy grout is harder to work with than cement grout: short working time, strict temperature requirements, and thorough cleaning of the tile surface right after application are essential€40–€90 materialsup to €200

For small tiled areas (a bathroom or kitchen alcove of a few square meters), grouting with cement grout yourself is very doable if you're handy. Buy the right grout width to match the tile gap, work in dry conditions, and clean the tile surface right after applying. Facade pointing follows different rules. As soon as work takes place above 3 meters, scaffolding or an aerial lift is mandatory: a safety requirement, not a choice. Raking out requires a pneumatic chisel or angle grinder that most DIYers don't own, and using it wrong damages the brick. For historic buildings or in a protected historic district, only approved mortar matching the original mortar composition may be used; the wrong material leads to an enforcement notice from the municipality. For all this work, hire a professional pointing company that can give a warranty on watertightness and durability.

The full process step by step

1

Inspection and custom quote

The pointing contractor inspects the facade or tiling on site: they assess the condition of the existing joints (loose, cracked, washed out), measure the area, and determine what percentage needs raking out. Based on this, you receive an itemized quote with separate items for raking out, pointing, scaffolding, and any sealing.

1–2 hours

2

Setting up scaffolding or an aerial lift

If the facade is higher than 3 meters, a rolling scaffold, fixed facade scaffold, or aerial lift is set up. The pointing contractor then works systematically from top to bottom, so dirt and mortar don't fall onto work that's already been cleaned. Scaffolding costs are itemized separately in the quote.

Half a day (setting up scaffolding)

3

Raking out damaged joints

Loose, cracked, or washed-out joints are raked out with a pneumatic chisel or angle grinder to a depth of at least 2 cm. Raking out too shallow is the most common cause of new joints coming loose. The pointing contractor then removes dust and loose particles with a brush or compressed air.

1–3 hours per 10 m²

4

Mixing and applying the mortar

The mortar is mixed in the color and composition that matches the existing brickwork (or the tile). For historic buildings, a lime mortar is used that breathes like the original joint. The mortar is pressed in with a pointing gun or jointing tool and then smoothed into the desired joint profile: flush, concave, or recessed.

2–5 hours per 10 m²

5

Cleaning the facade or tiling

After stiffening, but before fully curing, mortar stains and residue are removed from the brickwork or tile surfaces. For stubborn stains, a mild acid solution (for brick) or special tile cleaner (for tiles) is used. Cleaning the wrong way can affect the brick color.

1–2 hours

6

Optional: sealing the facade

Once the joints have fully cured (usually 7 to 28 days depending on the mortar), the facade can be sealed. Sealing reduces water absorption by 80–90% and significantly extends the life of the pointing. This is recommended for highly exposed west-facing facades or porous brick.

1–3 hours (scheduled separately)

7

Handover and final inspection

The contractor walks through the entire facade or tiling with you, checking for gaps, uneven joint depth, and color differences. You receive a handover report and maintenance instructions: when the mortar is fully cured, how to spot joint damage early, and when a next inspection makes sense.

30–45 minutes

What can go wrong?The most common mistake is insufficient raking out: joints raked out less than 2 cm deep bond poorly and come loose again after just one frost period. A second common problem is pointing at too low temperatures (below 5 °C) or in direct sunlight, which makes the mortar dry too fast and crack. Choosing the wrong mortar (too hard for soft, historic brick) causes vapor pressure damage: the brick deteriorates instead of the joint. On historic buildings or in a protected historic district, using the wrong mortar composition can lead to a penalty payment or mandatory repairs at your own expense.

6 smart money-saving tips

Request at least three quotes, including raking-out costsPrice differences of 20–35% for the same pointing work are normal. When comparing, check specifically whether raking out, scaffolding, and any sealing are included. A low price without raking out is misleading if raking out is actually needed.
Combine pointing with other facade jobsIf the scaffolding is already up for pointing, have exterior painting, facade cleaning, or a small brickwork repair done at the same time. That way, scaffolding costs are shared across several jobs: this saves €150–€400 per job.
Schedule the work in spring or fallPointing is ideally done between April and October. During the summer lull (July–August), pointing contractors are sometimes available sooner and more flexible on price. Spring is ideal: dry, mild, and before the vacation season.
Only have the bad areas raked outDuring the inspection, ask the pointing contractor to indicate what percentage of the joints actually needs repair. Partial repointing (only the truly damaged areas) can halve the total price compared to full repointing.
Grout small tiled areas yourselfFor grouting tiles in a bathroom or kitchen up to approx. 5 m², all a DIYer needs is the right cement grout mix, a rubber grout float, and a damp sponge. This saves you €100–€200 in labor costs and keeps the contractor free for the facade work.
Choose mortar to match porosity, not priceCheaper cement mortar isn't always suitable for your brick. Ask the pointing contractor which mortar matches the porosity and brickwork of your home. The wrong choice leads to new damage and double costs after a few years.

Frequently asked questions

What does facade pointing cost on average?

On average €2,100 for a standard row house (50–60 m²). The range is between €1,500 and €3,600. Per m², you can expect €30–€60, depending on the type of joint and whether raking out is needed.

How long does it take to point a facade?

For an average row house, it takes 1 to 3 days. With extensive raking out or larger facades, this can increase to a week.

Do I need a permit for facade pointing?

In most cases, no. If you live in a protected historic district or a historic building, always check with your municipality or the Omgevingsloket (the Dutch online permit portal) whether a permit is required.

Can I point a facade myself?

Small areas and tile grouting are doable for a handy DIYer. Facade pointing at height or large-scale repointing requires craftsmanship and equipment; a contractor who specializes in pointing delivers better quality and a warranty.

What's the difference between pointing and raking out?

Raking out means removing the old, damaged joints to a depth of approx. 2 cm. New joints are then applied. Raking out is extra labor-intensive and raises the price by €8–€18 per m².

How long does new pointing last?

Professionally applied pointing with quality mortar lasts 20 to 40 years, depending on weather exposure and the quality of the bricks.

Related jobs

Ready to have your facade or tiles professionally pointed or grouted?

Describe your job and get quotes from verified pointing companies near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →