Cost of installing an IKEA kitchen: everything you need to know

Installing an IKEA kitchen seems simple, but assembling the cabinets, countertop, sink, and built-in appliances takes skill and time. Total labor costs depend on the size of the kitchen, the number of cabinets, and whether electrical and plumbing work is also needed. With the right contractor, the installation goes smoothly and you can be sure everything is mounted level, tight, and safe.

In this article

  • ›Average cost
  • ›Prices by type
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›Step by step
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€1,400

average labor cost for installation

average hourly rate

€45–€65

contractor hourly rate (€45–€65/hour)

turnaround time

1–2 days

depending on kitchen size and extra work

€ Average price by type

Kitchen typeRangeAverage price
Small kitchen (straight, up to 10 cabinets)For example a studio or small home, single-wall layout€800 – €1,200€1,000avg.incl. installation
Medium kitchen (L-shaped, 10–18 cabinets)Common in row houses, incl. countertop and sink€1,200 – €1,800€1,450avg.incl. installation
Large kitchen (U-shaped or island, 18+ cabinets)Extensive installation, possibly extra built-in appliances€1,800 – €2,500€2,100avg.incl. installation
Kitchen + electrical & plumberComplete installation incl. hooking up appliances and water lines€2,200 – €3,500€2,800avg.incl. installation

Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.

Material and labor costs

Kitchen installer labor (assembling cabinets & countertop)labor
€1,300€800 – €2,000
Connecting sink & dishwasher (plumber)labor
€250€150 – €350
Connecting built-in appliances (electrician)labor
€175€100 – €250
Cutting and finishing countertop to sizematerial
€120€50 – €200
Silicone caulk, fasteners, and trim profilesmaterial
€45€20 – €80
Removal and transport of old kitchenadditional
€150€75 – €250

Hourly rates vary by region and contractor.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Mounting wall cabinets and base cabinetsHanging and leveling IKEA METOD / SEKTION cabinetsWith experienceRequires two people and knowing how to work level€0€300–€600
Cutting and installing the countertopIncl. sink cutout and sealing with caulkWith experienceA wrong cut means buying a new countertop€50–€150€100–€200
Connecting sink and dishwasherConnecting hot/cold water and drainNot recommendedLeak risk; plumber required if your insurance demands it€150–€350€0
Connecting built-in appliances (oven, cooktop)Breaker panel, grounding, and hardwired connectionNot recommendedLegally required by a licensed electrician€100–€250€0

Assembling the cabinets yourself is doable for a handy DIYer with time and patience: IKEA includes clear instructions. The real advantage of a contractor is speed (they do in one day what takes you a weekend) and leveling on uneven floors and walls, which determines the final result. For electrical and plumbing work in the Netherlands, a licensed plumber or electrician isn't optional but required. Your home insurance often doesn't cover water damage from connections you made yourself. Always have this done by a certified contractor and ask for a certificate of work.

The full process step by step

1

Measuring and preparation

The space is measured again, walls are checked for square and level, and the existing kitchen (if any) is demolished and removed. Water and electrical lines are marked.

0.5–1 day

2

Installing base cabinets and shelves

The base cabinets are leveled on legs or a plinth. Corner solutions and filler pieces are cut to size. Then the wall cabinets are mounted.

3–6 hours

3

Installing and finishing the countertop

The countertop is cut to size, the sink cutout is routed, and the whole thing is sealed along the wall with silicone caulk.

1–2 hours

4

Water and electrical connections

The plumber connects the sink and dishwasher to the hot and cold water lines and to the drain system. The electrician handles the hardwired connection of the oven, cooktop, and range hood.

2–4 hours

5

Finishing and handover

Doors, drawers, and handle strips are mounted and adjusted. Everything is cleaned and checked to make sure it works. The contractor walks through the handover with the customer.

1–2 hours

What can go wrong?The most common problems are missing IKEA parts that delay the schedule, walls that aren't square so extra filler pieces are needed, and hidden pipes, wires, or load-bearing structures behind the wall that limit where cabinets can go. Find this out in advance by using a wire detector and requesting the building plans from the owner or landlord.

4 smart money-saving tips

Request at least three quotesPrices for kitchen installation vary widely. On VakmanBaas, you can easily compare multiple verified contractors and choose the best value for money.
Assemble the cabinets yourself, leave the connections to othersDo the cabinet assembly yourself if you're handy, and only hire a plumber and electrician for the connections. This saves €400–€800 on labor costs.
Schedule outside peak seasonKitchen installers are busiest in spring and when new construction homes are handed over. Schedule in the quieter fall or winter months and negotiate a lower price.
Make sure everything is ready before the installation dateCheck all IKEA boxes for completeness before the contractor arrives. Every hour they spend waiting for missing hinges or fasteners counts toward the invoice.

Frequently asked questions

What does it cost to install an IKEA kitchen, everything included?

The labor costs for assembly alone range from €800 to €2,500. If you also hire a plumber (sink, dishwasher) and an electrician (oven, range hood), you can easily reach €2,200–€3,500 in total. The kitchen itself (IKEA materials) isn't included.

Do I need to hire a plumber and electrician separately?

Often, yes, unless the kitchen installer is also certified for gas and electrical work. Most kitchen installation companies only handle the carpentry. To connect the drain, dishwasher, and built-in appliances, you need specialists. Some all-in general contractors arrange everything in one quote.

How much extra does it cost if the old kitchen needs to be demolished?

Demolishing and removing an old kitchen usually costs €150–€400, depending on the size and whether asbestos is present. Asbestos inspection and removal require a licensed company and can cost an extra €500–€1,500.

Is an IKEA kitchen installer different from a regular kitchen installer?

IKEA offers installation through its own service partner, IKEA Home Service, but you can also hire an independent contractor who's familiar with the SEKTION and METOD systems. Independent contractors often have more flexible scheduling and are sometimes cheaper, especially if you compare multiple quotes.

What are the most common pitfalls when installing an IKEA kitchen?

The biggest pitfalls are walls that aren't square or level (extra filler pieces needed), missing parts in the IKEA boxes that delay the schedule, and unexpected pipes or wires behind the wall. Make a complete inventory of all IKEA parts before the installation date.

Related jobs

Ready to have your IKEA kitchen installed?

Describe your job and receive quotes from verified contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →