
Cost of blinds in glass: everything you need to know
Blinds in glass, also called built-in blinds or integrated sun shading, sit recessed between two panes of glass, which keeps out dust and wear. The cost depends on the type of glass, the size of the window, and whether the existing frames are suitable or need to be replaced.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€450
per window, including installation
average hourly rate
€55
contractor hourly rate (€45–€75/hour)
turnaround time
2–4 hours
depending on number of windows and frame type
€ Average price by type
| Type of blinds in glass | Range | Average price |
|---|---|---|
| Standard blinds in glassManually operated, white or gray aluminum slats | €250 – €450 | €340avg.incl. installation |
| Electrically operatedBuilt-in motor, operated by switch or remote control | €450 – €750 | €580avg.incl. installation |
| Smart glass with integrated sun shadingHome automation link, app or voice control possible | €650 – €1,200 | €900avg.incl. installation |
| Custom large window (> 120×120 cm)Extra cost due to larger glass area and reinforced frame | €700 – €1,500 | €1,000avg.incl. installation |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Measuring and requesting quotesPrecisely measuring frame and glass opening | DoableUse a steel tape measure; measure at least three points | €0 | €50–€80 |
| Removing old glassTaking out and disposing of existing glazing | With experienceRequires glass handling gloves and knowledge of sealants and profiles | €30–€60 | €40–€80 |
| Installing the new blind unitHeavy glass, precision alignment, and sealing | Not recommendedMistakes lead to condensation or a broken mechanism | €60–€150 | €0 |
| Connecting electrical wiringConnecting the motor to mains power or home automation | Not recommendedLegally required to be done by a licensed electrician | €50–€150 | €0 |
Installing blinds in glass requires specialized knowledge of glazing: the unit is heavy, the measurements must be accurate to the millimeter, and the sealing must be airtight and watertight. An installation mistake leads to condensation between the panes or a faulty mechanism, and the repair then costs more than what you saved by skipping the contractor. What you can do yourself: measure accurately, compare multiple glaziers through VakmanBaas, and prepare the electrical work in time for electric models. This saves you time and sometimes money on the total quote.
The full process step by step
Measuring and quote
The contractor precisely measures the height, width, and depth of the frame's glazing rebate. Based on this, the blind unit is custom ordered from the manufacturer. Expect a delivery time of 2 to 4 weeks.
30–60 min
Removing old glass
The existing glazing is carefully cut free of its sealant and taken out. Damaged gaskets or profiles are replaced right away so the new unit fits properly.
30–60 min per window
Installing the new blind unit
The custom-made glass unit with integrated blinds is placed in the frame, leveled, and clamped in place. The rebate is then sealed all around with high-quality sealant.
1–2 hours per window
Electrical connection (if applicable)
For electrically operated models, a licensed electrician connects the motor to the breaker panel or the home automation system. The contractor then tests the open and closed positions.
30–90 min
Handover and instructions
The contractor demonstrates how to operate it, hands over the warranty documents, and clears away the old glass and debris. You'll get maintenance advice for a long service life of the mechanism.
15–30 min
4 smart money-saving tips
Frequently asked questions
What's the difference between blinds in glass and regular blinds?
With blinds in glass, the slats sit recessed between two panes of insulated glazing. They never need dusting, don't get damaged, and give a sleek look. Regular blinds hang in front of or behind the glass and are exposed to dust, moisture, and wear.
Do windows with blinds in glass insulate well?
Yes. The blind unit is installed in a double or triple glazing construction with argon filling. The insulation value (Ug) is comparable to standard HR++ glass (high-efficiency double glazing) and meets the current Bouwbesluit (the Dutch building code) requirements.
Can existing double glazing be converted to blinds in glass?
That's rarely possible. The blind unit replaces the entire glazing; the existing glass is removed and replaced with a special unit with integrated slats. In most cases, though, the frame can be reused.
How many windows can a contractor install in one day?
An experienced glazier installs 3 to 6 windows per day on average, depending on size and accessibility. For one window, count on 2 to 4 hours including preparation and finishing.
What warranty do I get on blinds in glass?
Most manufacturers offer a 5 to 10 year warranty on the mechanism and the glazing. Always get the warranty terms in writing and make sure the contractor provides proof of installation.
Related jobs
Ready to have blinds in glass installed?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes