Skip to main content

Are you a contractor? Sign up for free

Contractor removing and installing a kitchen in a Dutch home
9 min readPrices verifiedKitchens

Cost of removing and installing a kitchen: everything you need to know

Removing and installing a kitchen covers taking out the old kitchen and expertly installing the new one. The cost depends on the size of the kitchen, the number of connections (water, gas, electrical), and whether extra work is needed, such as rerouting lines.

In this article

  • ›What does kitchen removal and installation cost?
  • ›Prices by type of job
  • ›Labor costs and materials
  • ›Hire a contractor or do it yourself?
  • ›How does the kitchen installation process work?
  • ›Money-saving tips for kitchen removal and installation
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€1,400

kitchen removal + installation (labor costs)

average hourly rate

€55

contractor hourly rate (€40–70/hour)

turnaround time

1–3 days

depending on scope and connections

€ Average price by type

Type of kitchen workRangeAverage price
Removal onlyremove and haul away the old kitchen, without installing a new one€200 – €650€450avg.incl. labor
Installing a small kitchenup to a 3-meter layout, simple connection€450 – €1,000€700avg.incl. installation
Standard kitchen removal + installation (most popular)average kitchen of 3–5 meters, reusing existing connections€1,050 – €1,800€1,400avg.incl. installation
Large or corner layoutL- or U-shaped kitchen, more cabinets and multiple connections€1,500 – €2,700€2,100avg.incl. installation
Kitchen including rerouting linesmoving water, gas, or electrical lines to the new layout€2,200 – €4,500€3,200avg.incl. installation

Prices are labor costs including VAT; the kitchen itself and any tiling or plastering are not included. Based on Google price research.

Material and labor costs

Removal labor (4–8 hours)labor
€380€200 – €560
Installation labor (8–20 hours)labor
€900€450 – €1,400
Hauling and disposal fees for the old kitchenadditional
€150€75 – €250
Connection materials (water, gas, electrical)material
€150€50 – €300
Sealing materials and silicone caulkmaterial
€45€20 – €80
Installer's trip chargeadditional
€45€25 – €75

Carpenter/kitchen installer hourly rate averages €40–70/hour. Rerouting lines requires a certified plumber or electrician and is quoted separately.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Removing the old kitchenunscrew and haul away cabinets, countertop, and built-in appliancesDoableA fine job to do yourself: shut off water, gas, and power first and work methodically€200–€500up to €500
Leveling and securing kitchen cabinetsalign upper and base cabinets, screw into wall and floorWith experienceRequires precision: one crooked cabinet throws off the whole row€300–€800up to €800
Cutting and installing the countertop to sizeshorten the countertop, cut openings for the sink and cooktopWith experienceA cutting mistake can't be undone; composite or stone is real skilled work€150–€400up to €400
Connecting water lines (supply and drain)connect sink, dishwasher, and refrigerator to the plumbingWith experienceA small leak behind a cabinet causes weeks of hidden damage€80–€200up to €200
Connecting or rerouting a gas lineconnect a gas range or combination oven, move the line to the new layoutNot recommendedLegally prohibited for private individuals: only a licensed gas plumber (GAS certificate) may do thisNo legal savings possibleNo legal savings possible

For removing the old kitchen and hanging cabinets, a handy DIYer has room to get to work themselves. When it comes to connecting or rerouting a gas line, however, a licensed plumber with a GAS certificate (a Dutch certification for gas work) is legally required, and that's non-negotiable. Electrical work on a dedicated circuit for induction or a built-in oven requires an NEN 1010 (the Dutch standard for electrical installations) certified electrician. If you choose a composite or natural stone countertop, custom work by a contractor is strongly recommended: a cutting mistake in such material can wipe out the entire purchase price.

The full process step by step

1

Measuring and discussing preparation

The kitchen installer measures the space precisely: they check whether the floor is level, look at the existing water, gas, and electrical connections, and determine whether lines need to be rerouted. This meeting also settles who supplies the appliances and whether additional contractors (plumber, electrician) need to be scheduled.

30–60 min

2

Removing and hauling away the old kitchen

Water, gas, and power are shut off. Built-in appliances are disconnected and removed. Then the cabinets, countertop, and sink are unscrewed and carried outside. The wall and floor are inspected for damage that needs repair before the new kitchen is installed.

4–8 hours

3

Preparatory work (if needed)

If the layout changes, water, gas, or electrical lines are rerouted by the relevant certified contractor. If needed, the wall is filled or plastered so cabinets can be securely fastened everywhere. Installation only starts once the surface is ready.

Half a day to 2 days (when rerouting lines)

4

Leveling and securing base cabinets

The base cabinets are aligned one by one with a level and set to the right height using adjustable legs. They're then screwed to the wall and to each other. Correct alignment at this stage determines whether drawers, doors, and the countertop fit properly later.

2–5 hours

5

Hanging upper cabinets and installing the countertop

Upper cabinets are fastened with wall anchors at the agreed height. Then the countertop is cut to size and laid, including the openings for the sink and cooktop. Seams between the countertop and wall are sealed with clear or color-matched silicone caulk.

3–6 hours

6

Connections, appliances, and finishing

The sink, dishwasher, refrigerator, and cooktop are connected. The plumber checks the water connection, and the electrician tests the circuits. Traps, faucets, and drains are installed and tested with running water. Doors and drawers are adjusted so they line up and move smoothly.

2–4 hours

7

Final inspection and handover

The contractor goes over the entire kitchen with you: all appliances are tested, the drain is checked for leaks with running water, and all doors and drawers are checked for proper operation. Small issues are fixed right away before the contractor leaves.

30–60 min

What can go wrong?The most common problems with a kitchen installation: base cabinets that aren't level, causing drawers to stick or hang crooked; a countertop that doesn't fit tightly against a bulging or uneven wall (solution: plastering or a trim strip); and leaking water connections behind the base cabinet that only show up weeks later as mold or moisture damage. Check the drain and faucets yourself with running water before the installer leaves, and carefully inspect the silicone caulk along the entire edge, including the corners and the transition to the countertop.

6 smart money-saving tips

Remove the old kitchen yourselfRemoving cabinets, the countertop, and built-in appliances is a job two people can do in one morning. Shut off water, gas, and power first. That saves the installer 4–8 hours of work, and you can easily save €200–€500 on labor costs.
Keep the connection points in the same positionEvery meter a water, gas, or electrical line has to be rerouted costs €80–€150 extra and requires a certified contractor. Adapt your new kitchen layout to the existing connection points as much as possible: that's the biggest cost saving when installing a kitchen.
Schedule the plumber, electrician, and installer on one dayIf lines need to be rerouted, schedule all contractors on the same day. That way you pay the trip charge only once (€25–€75 per contractor) and they can coordinate their work right away, without the kitchen sitting half-finished for days.
Choose a laminate countertop in a standard sizeA custom composite or quartz countertop can cost €500–€2,000. A quality laminate or oak countertop in a standard length costs €100–€350, can be cut to size by the installer, and lasts for decades with proper care.
Request three quotes through VakmanBaasThe price of kitchen installation varies a lot by contractor: self-employed kitchen installers charge on average €10–€20 per hour less than large installation companies. By comparing three quotes, you save an average of 15–25% on the total.
Have the kitchen delivered on the ground floorSome installers charge extra time for carrying heavy cabinet packages to an upper floor or basement. Make sure all boxes and packages are already in place before the installer arrives: this saves 30–60 minutes of work time.

Frequently asked questions

What does it cost on average to remove and install a kitchen?

On average, you'll pay €1,400 to remove the old kitchen and install a new standard kitchen (labor costs). The range runs from €450 for removal only to €4,500 for a large kitchen with rerouted lines.

How long does it take to install a new kitchen?

A standard kitchen is installed in 1 to 2 days. With a larger layout (L- or U-shaped kitchen) or extra work such as tiling or rerouting lines, this goes up to 3 days or more.

What does a kitchen installer charge per hour?

A kitchen installer charges an average of €40 to €70 per hour including VAT. Self-employed contractors often charge around €55–€65 per hour, while larger installation companies sometimes have higher rates.

Do I need a permit to install a new kitchen?

In most cases, you don't need a permit to install a kitchen. Only major structural changes, such as moving walls or running new lines outside the home, may require a building permit.

Can I remove and install a kitchen myself?

Removing the old kitchen is very doable for a DIYer and saves €200–€500. Installing a new kitchen, however, requires knowledge of water lines, gas, and electrical work. Officially, work on gas and electrical lines in the Netherlands may only be done by certified contractors.

What extra costs should I take into account?

Think of rerouting water, gas, or electrical lines (€500–€1,500 extra), tiling behind the countertop (€30–€60/m²), a new countertop, a new range hood, and possibly plastering or painting after installation.

Related jobs

Ready to have your kitchen removed and installed?

Describe your job and receive quotes from verified kitchen installers near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →