Skip to main content

Are you a contractor? Sign up for free

Contractor installing kitchen or island electrical wiring in a Dutch home
9 min readPrices verifiedKitchens

Cost of kitchen or island electrical wiring: everything you need to know

Installing electrical wiring in a kitchen or kitchen island requires a licensed electrician. It involves new circuits, wiring, outlets, and often a heavier connection for induction or three-phase power. The price depends heavily on the scope of the job, the distance to the meter cabinet (where the electricity meter and the breaker panel are), and whether three-phase power is needed.

In this article

  • ›What does kitchen electrical wiring cost?
  • ›Prices by type of job
  • ›Material and labor costs
  • ›Hiring a contractor vs. doing it yourself
  • ›How does the process work?
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€850

standard kitchen electrical (circuits + outlets)

average hourly rate

€57

electrician hourly rate (€45–70/hour)

turnaround time

1–2 days

depending on scope and three-phase power

€ Average price by type

Type of kitchen electrical jobRangeAverage price
Extra kitchen outletsAdd 2–4 outlets, using an existing circuit€200 – €500€350avg.incl. installation
New circuit + outlets1 extra circuit from the breaker panel, 2–3 outlets€400 – €800€600avg.incl. installation
Complete standard kitchen electrical (most popular)2–3 new circuits, 4–6 outlets, induction circuit, recessed lights€650 – €1,200€850avg.incl. installation
Kitchen island electrical installationFloor or ceiling raceway, separate circuits, multiple outlets€900 – €1,800€1,350avg.incl. installation
Kitchen electrical including three-phase power3-phase connection for a wide induction cooktop or professional range€1,200 – €2,500€1,750avg.incl. installation

Prices are estimates including standard materials and labor; three-phase power or long cable runs increase the price. Based on Google price research.

Material and labor costs

Wiring (NYM cable per meter)material
€165€80 – €250
Expanding the breaker panel / new breakermaterial
€140€80 – €200
Outlets and electrical boxes (set)material
€120€60 – €180
Recessed lights + transformer (set of 4)material
€150€80 – €220
Electrician labor (4–8 hours)labor
€380€200 – €560
Additional costs (concealing, finishing, travel costs)additional
€100€50 – €150

Electrician hourly rate averages €45–€70/hour. Three-phase and meter cabinet work often costs more due to extra inspection requirements (NEN 1010).

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Adding extra outletsAdding two to four outlets on an existing circuit with spare capacityWith experienceLegally allowed for a qualified private individual; always switch off the power first€200–€350up to €150
Installing a new circuit from the breaker panelRunning NYM cable, installing an RCD and breaker in the breaker panelNot recommendedMeter cabinet work is legally reserved for a certified electrician (NEN 1010)€400–€800No legal savings possible
Installing an induction circuit (16 A / 25 A)Heavy, dedicated circuit for a high-power cooktopNot recommendedRequires a maximum load calculation and completion in accordance with NEN 1010€250–€600No legal savings possible
Wiring a kitchen islandCable route via floor or ceiling raceway, multiple circuits and outletsNot recommendedComplex routing and connections; mistakes cause fire hazards and void insurance€900–€1,800No legal savings possible
Connecting recessed lights to an existing lighting circuitMounting lights and connecting them to an existing lighting circuitDoableSwitch off the power at the breaker panel, connect wires using the correct color coding€80–€220up to €120

For kitchen electrical work, there's a clear dividing line: as soon as new wiring has to be run from the meter cabinet, extra circuits are installed, or three-phase power is needed, you're legally required to hire a certified electrician. This follows from the Bouwbesluit (the Dutch building code) and the NEN 1010 standard. A licensed electrician provides an inspection report afterward: a document insurers require in case of fire damage and that future buyers of your home can request. Smaller tasks, such as connecting recessed lights to an existing circuit or moving an outlet on a circuit with spare capacity, are legally allowed for a qualified private individual, provided the power is fully switched off first. Unsure about the circuit load, or is your breaker panel outdated (screw-in fuses)? Then have an electrician assess this as well before you start.

The full process step by step

1

Inspection of the meter cabinet and kitchen

The electrician checks the existing breaker panel for available capacity, the type of fuses, and whether RCDs (residual current devices, the European counterpart of a GFCI) are present. At the same time, they map out the kitchen layout: where will the outlets, the induction circuit, any island connection, and lighting go?

30–60 min

2

Preparing the quote and schedule

Based on the inspection, you receive an itemized quote: labor hours, materials list (cable type and length, electrical boxes, breakers), and any notification costs from the grid operator for an upgrade. Once approved, a work date is set.

1–3 days

3

Planning cable routes and cutting channels

The electrician marks the cable routes from the meter cabinet to the kitchen. In solid walls, channels are cut; for a kitchen island, the floor is opened or a ceiling raceway solution is worked out. Sealing off adjacent rooms against dust prevents nuisance.

1–3 hours

4

Running NYM cables

The new wiring (NYM 3x2.5 mm² for outlets, NYM 3x4 mm² or heavier for induction) is run from the meter cabinet to all connection points in the kitchen. For a kitchen island, the cable runs through the floor raceway or via the ceiling.

2–5 hours

5

Adjusting the meter cabinet and connecting circuits

New RCDs and circuit breakers are mounted in the breaker panel. For three-phase power (3-phase), the meter cabinet is expanded or converted. The cables are labeled correctly for future maintenance.

1–2 hours

6

Mounting outlets, induction point, and lights

Electrical boxes are recessed into the wall or surface-mounted, and outlets and the induction connection point are installed and secured. Recessed lights are fitted into the paneling and connected. Then the cable channels are filled and the rooms finished.

1–3 hours

7

Inspection, testing, and handover

All circuits, RCDs, outlets, and lighting points are measured and tested in accordance with NEN 1010. Any deviations are corrected immediately. You receive an inspection report for your records and insurance.

30–60 min

What can go wrong?The most common mistake is underestimating the required circuit capacity: a wide induction cooktop (7.4 kW or more) draws more current than a standard 16A circuit can handle, causing the RCD to trip constantly. With kitchen islands, the cable route is often underestimated: the detour via floor or ceiling is frequently longer than expected and requires extra demolition. Another common problem is failing to notify the grid operator when upgrading the connection, which later causes problems during a home inspection or insurance claim. Always request an itemized quote including a meter cabinet assessment before the job starts.

6 smart money-saving tips

Combine with the kitchen installationSchedule the electrician at the same time as the kitchen installer: when the cabinets haven't been put back yet, walls and floor are accessible without extra demolition. This easily saves half a day of labor (€100–€200).
Request at least three quotesPrice differences of €200–€500 for exactly the same kitchen electrical job are common. With VakmanBaas, you can easily compare verified electricians in your region without having to chase them by phone yourself.
Fill the cable channels yourselfFilling cut channels isn't electrical work. If you're handy, you can do this yourself with plaster or mortar after the cables have been run. This saves 1–2 hours of labor (€50–€140).
Choose LED panels over many separate recessed lightsFive or six separate recessed lights cost more to buy and install than one larger LED panel with comparable light output. In a large kitchen, this saves you €60–€120 on materials and connection work.
Have the breaker panel assessed in advanceAn outdated meter cabinet with screw-in fuses often has to be fully replaced before new kitchen circuits can be connected. If you know this in advance, you can include it in your budget and won't face a surprise while the electrician is already at work.
Avoid separate service visits for each partHave all kitchen electrical work handled in one visit: induction circuit, outlets, lighting, and island wiring at once. Every extra visit comes with a trip charge (€30–€75), while the electrician is already on site anyway.

Frequently asked questions

What does kitchen electrical wiring cost on average?

On average, you pay €850 for a standard kitchen electrical job with new circuits and outlets. The range runs from €200 (extra outlets only) to €2,500 (three-phase power + kitchen island).

How long does kitchen electrical work take?

A simple job (extra outlets, 1 new circuit) takes 4–8 hours. A complete kitchen island with three-phase power and lighting takes 1–2 workdays.

Do I need a permit for kitchen electrical work?

No, standard electrical work in an existing home doesn't require a building permit. However, a licensed electrician must carry out the work and complete it in accordance with NEN 1010 (the Dutch standard for low-voltage electrical installations). If the main connection is upgraded, notifying the regional grid operator is mandatory.

Can I install electrical wiring in my kitchen myself?

Small changes (moving an outlet on an existing circuit) are legally allowed for qualified people, but new circuits, meter cabinet work, and three-phase power must be done by a certified electrician. DIY electrical work harms your insurance coverage in case of fire.

What does an extra circuit for induction cost?

A separate circuit for an induction cooktop costs €250–€450 on average. If you have a wide model (80 cm+) or a professional range that requires 3-phase power, you'll quickly reach €600–€1,000 including the three-phase connection.

What does electrical wiring in a kitchen island cost?

Electrical for a kitchen island costs €1,350 on average (range €900–€1,800). The wiring runs through the floor or ceiling to the island, which takes extra work compared to a regular kitchen wall.

Related jobs

Ready to have your kitchen or island electrical installed?

Describe your job and receive quotes from verified electricians near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →