Cost of installing or renovating a kitchen: everything you need to know

Renovating a kitchen or installing a new one is one of the most popular remodeling jobs in the Netherlands. Costs vary widely: from a budget kitchen with simple installation to a fully custom kitchen with new plumbing and electrical work. In this overview, you'll find prices by type of renovation, a breakdown of material and labor costs, and practical tips to save money.

In this article

  • ›What does it cost to install or renovate a kitchen?
  • ›Prices by type of kitchen job
  • ›Material and labor cost breakdown
  • ›Hire a contractor or do it yourself?
  • ›How does kitchen installation work?
  • ›Money-saving tips for your kitchen renovation
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€10,000

complete, including materials and installation

average hourly rate

€55

contractor hourly rate (€45–75/hour)

turnaround time

3–7 days

depending on scope

€ Average price by type

Kitchen job typeRangeAverage price
Kitchen renovation (cabinet doors/countertop)keep the existing kitchen layout, new doors and countertop€2,000 – €6,000€3,500avg.incl. installation
Budget kitchen including installationready-made kitchen from a home improvement store or chain, standard layout€4,500 – €8,000€5,500avg.incl. installation
Mid-range kitchen (most popular)quality kitchen with appliances, professional installation included€8,000 – €18,000€12,000avg.incl. installation
Luxury kitchenhigh-end materials, built-in appliances, custom elements€15,000 – €30,000€20,000avg.incl. installation
Fully custom kitchenfully made to measure, premium finish, new plumbing and electrical€20,000 – €50,000€30,000avg.incl. installation

Prices include standard installation and VAT; plumbing, electrical work, and tiling usually come on top of this. Based on Google price research.

Material and labor costs

Kitchen units and cabinetsmaterial
€6,000€2,000 – €15,000
Countertop (laminate, composite, or natural stone)material
€1,200€400 – €3,000
Built-in appliances (oven, cooktop, dishwasher)material
€2,000€800 – €5,000
Kitchen installation (labor)labor
€1,500€1,000 – €2,500
Plumber / electrician (labor)labor
€700€400 – €1,200
Demolition and removal of old kitchenadditional
€400€200 – €700
Tiling for backsplash and flooradditional
€1,000€500 – €2,000

Kitchen installer hourly rate averages €45–75/hour. Plumbers and electricians usually charge €55–85/hour for connection work in the kitchen.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Demolition and removal of old kitchentake apart cabinets, remove countertop and appliances, haul away wasteDoableNo special permit or certification required: handiness and a hand truck are enough€200–€500up to €500
Installing and leveling kitchen cabinetshang base and wall cabinets, level and align themWith experienceRequires a level, cordless drill, and precision; mistakes are hard to fix later€600–€1,400up to €1,400
Measuring, cutting, and installing the countertopcut countertop to size, rout the sink cutout, caulk the seamsWith experienceWith composite or natural stone, one wrong cut means a loss of €500–€1,500€250–€600up to €600
Water and gas connections (faucet, sink, range)connect water supply, hook up drain, connect gas range or inductionNot recommendedGas work requires a licensed plumber (NL-BRL 6000); water damage is often not covered by home insurance when you do it yourself€400–€1,200No recommended savings
Electrical work and connecting built-in appliancesconnect oven, range hood, and dishwasher to the right circuitNot recommendedA licensed electrician is required for panel upgrades or new RCD protection; fire risk with incorrect wiring€200–€700No recommended savings

When installing or renovating a kitchen, there are clear lines between what you can do yourself and what needs a contractor. Demolition, cleaning the room, and rough assembly of cabinets are easy to do yourself with the right tools: think of a level, a cordless drill, and a tape measure. Cutting the countertop yourself is risky: one wrong measurement with composite or natural stone means an immediate loss of hundreds to thousands of euros. Gas, water, and electrical work are subject to legal requirements: in the Netherlands, gas connections may only be made by a licensed plumber with NL-BRL 6000 certification (a Dutch certification for gas installation work). Electrical work that requires a new circuit or new RCD protection (residual current device (RCD), the European counterpart of a GFCI) also belongs with a licensed electrician, not only for fire safety, but also because your home insurance may exclude damage caused by unauthorized electrical changes. So never cut the contractor's work from your plan, but save smartly on the prep work.

The full process step by step

1

Measuring and deciding on the layout

The kitchen installer or supplier measures the room precisely: width, depth, and height, but also the position of windows, doors, and existing connection points for gas, water, and electricity. Based on those measurements, the kitchen layout is finalized.

1–2 hours

2

Agreeing on the quote and delivery time

Once you approve the quote, the supplier schedules production and delivery. Standard kitchens in stock are sometimes available within a week; custom kitchens or kitchens with special finishes take 6 to 12 weeks. Have the installation appointment scheduled right away.

4–12 weeks wait

3

Demolition and clearing the room

The old kitchen is completely removed. Hidden defects such as mold behind the baseboards, old copper plumbing, or an outdated outlet now come to light. This is also the ideal moment to lay the floor or skim-coat the walls if that's planned.

half a day–1 day

4

Rough-in plumbing and electrical work

The plumber installs new water supply and drain lines in the desired positions. If needed, the electrician runs new circuits, installs outlets at the right height, and prepares the connections for the oven, dishwasher, and range hood. This work must be fully finished before the kitchen is installed.

half a day–2 days

5

Installing the kitchen

The installer starts with the base cabinets: leveling them, securing them, and setting the height with adjustable feet. Then the wall cabinets are hung. Next, the countertop is cut to size, the sink cutout is routed, and the countertop is glued and secured. Cabinet doors, drawers, and hinges are adjusted.

1–3 days

6

Finishing appliances and connections

The plumber connects the faucet, sink, and dishwasher to the water supply and drain. The electrician makes the final connections of the oven, range hood, and induction cooktop to the right circuits. Gas appliances are connected and tested for leaks.

2–4 hours

7

Finishing, testing, and handover

Baseboards are installed, gaps are sealed with clear or colored silicone caulk, and the backsplash or tile edge is applied. All appliances are tested for function and leaks. The installer walks you through the kitchen and discusses the warranty terms.

2–4 hours

What can go wrong?The most common pitfalls when installing a kitchen are: measuring errors that cause cabinets not to fit or leave too little room for the sink, delivery times that slip due to production problems so the scheduled installer is no longer available, and hidden damage behind the old kitchen (think of mold in the wall, old asbestos on the floor, or rusty plumbing that turns up during demolition). This kind of extra work can quickly add €500 to €2,000 to the bill. So always plan a buffer of at least 10–15% above the quote, and make sure the gas connection is inspected in advance by a licensed plumber.

6 smart money-saving tips

Do the demolition yourselfYou don't need to outsource taking apart the old kitchen and hauling away the debris. Rent a dumpster or drive to the recycling center yourself: that saves €200 to €500 in labor costs a kitchen installer would otherwise charge.
Choose a kitchen renovation instead of a full replacementAre the kitchen cabinets still sturdy and is the layout functional? Then you can refresh the whole look with new cabinet doors, a different countertop, and a modern faucet for €2,000–€5,000. That's half or less of what a completely new kitchen costs.
Buy built-in appliances separatelyAppliances bought through a kitchen supplier usually cost 20–35% more than the same brand and model at an electronics wholesaler. Buy the oven, cooktop, and dishwasher yourself and have the installer only connect them: average savings of €300–€800.
Request at least three quotesIn practice, price differences for identical installation work can reach 30%. Request quotes from several certified kitchen installers and compare not only the price, but also exactly what's included (removal, silicone work, connecting appliances).
Plan the remodel outside the busy seasonKitchen installers are fully booked in spring (March–May) and around summer vacation. In fall or winter, you'll have more room to negotiate a sharper price and can count on a shorter wait for both delivery and installation.
Choose laminate or Dekton composite for the countertopA quality laminate countertop starts at €150–€300, while natural stone or ceramic quickly costs €1,500–€3,000 for an average kitchen. Modern wood-look laminates are durable and nearly indistinguishable from wood: for most kitchens, they offer the best value for money.

Frequently asked questions

How much does it cost to install or renovate a kitchen on average?

On average, you'll pay about €10,000 for a new mid-range kitchen including installation. A budget kitchen starts at €4,500, while a luxury custom kitchen can run up to €50,000. A simple kitchen renovation (new cabinet doors and countertop) costs €2,000 to €6,000.

How long does it take to install a kitchen?

Installing a standard kitchen takes 1 to 3 workdays. With extra work (new plumbing, electrical, or tiling), plan on 5 to 7 workdays. Ordering and delivery of the kitchen itself usually takes 4 to 12 weeks.

Do I need a permit for a new kitchen?

No, you don't need a building permit to install or renovate a kitchen in the same room. Gas connections and changes to plumbing must, however, be done by licensed contractors.

Can I install the kitchen (partly) myself?

If you're handy, you can assemble the kitchen cabinets yourself. Gas, water, and electrical connections must be done by a licensed contractor. By doing the demolition and prep work yourself, you'll save €300 to €700 on labor costs.

What does kitchen installation alone cost?

Installation costs alone for a kitchen range from €1,000 to €2,500, depending on the complexity, the number of cabinets, and whether appliances also need to be connected. Plumbing and electrical work often come on top of that.

When is a kitchen renovation cheaper than a new kitchen?

If the kitchen layout and the cabinet boxes are still in good condition, replacing the cabinet doors, adding a new countertop, and possibly a new faucet can make a big difference for €2,000 to €4,000. That's considerably cheaper than a full replacement.

Related jobs

Ready to have your kitchen installed or renovated?

Describe your job and receive quotes from verified kitchen installers near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →