Skip to main content

Are you a contractor? Sign up for free

Contractor installing an EV charger at a Dutch home
9 min readPrices verifiedEV Charging Stations

Cost of installing an EV charger: everything you need to know

Having an EV charger installed at home is the most convenient way to charge your electric car. The total price depends on the type of charger, the cable length, and whether your meter cabinet (where the electricity meter and the breaker panel are) is already suitable. On average, costs range from €800 to €3,000, all-inclusive.

In this article

  • ›Average cost of installing an EV charger
  • ›Prices by type of EV charger
  • ›Material and labor costs
  • ›Hire an electrician or do it yourself?
  • ›How does the installation work?
  • ›Tips to save on your EV charger
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€1,400

EV charger + standard installation

average hourly rate

€65

electrician hourly rate (€55–80/hour)

turnaround time

0.5–1 day

depending on meter cabinet and cable route

€ Average price by type

EV charger typeRangeAverage price
Single-phase EV charger 1-phaseMax. 7.4 kW, suitable for most homes with a single-phase connection€800 – €1,400€1,100avg.incl. installation
Three-phase EV charger 3-phase (most popular)Max. 11–22 kW, charges faster (requires a 3-phase connection)€1,100 – €2,000€1,500avg.incl. installation
Smart EV charger with charging card & appEnergy insights, dynamic charging on solar power, charging card integration€1,400 – €2,400€1,900avg.incl. installation
EV charger with meter cabinet upgradeExtra circuit or switch to 3-phase needed in the meter cabinet€1,800 – €3,000€2,400avg.incl. installation

Prices include standard cabling and mounting; a meter cabinet upgrade or excavation is charged separately. Based on Google price research.

Material and labor costs

EV charger (hardware)material
€900€600 – €1,300
Cabling and installation partsmaterial
€180€80 – €300
Electrician labor (2–4 hours)labor
€220€130 – €320
Meter cabinet modification (if needed)additional
€300€150 – €500
Excavation for outdoor route (if needed)additional
€200€100 – €400

Electrician hourly rate averages €55–80/hour. Rates may be higher for urgent jobs or with specialized EV charger installers.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Physically mounting the EV charger on the wallAttaching the bracket and housing to masonry, concrete, or a wooden wall in the garageDoableEasy to do with a standard tool set and the manufacturer's mounting instructions: no electrical work involved€0–30 materialsup to €50
Running cable through the houseRouting a fixed cable from the meter cabinet to the charging location in the garage or carport via a cable tray or the wallWith experienceThe right wire size (min. 6 mm² for 11 kW), fire-safe penetrations, and neat routing are crucial: mistakes lead to fire or outage risk€80–200up to €150
Electrical connection to the breaker panelConnecting to the breaker panel including grounding, breaker, and type B RCBONot recommendedLegally required to be done by a NEN 1010-certified electrician; doing it yourself means losing the installation warranty and risking a denied claim after fire damage€130–320No legal savings possible
Meter cabinet upgrade or adding a circuitExpanding the breaker panel or switching to a 3-phase connection via the grid operatorNot recommendedWork on the main connection is reserved for licensed electricians and requires coordination with the grid operator: dangerous and subject to permits€150–500No legal savings possible
Configuring the EV charger and linking the appSetting up Wi-Fi, activating the charging card, and configuring dynamic charging on solar powerDoableWith most modern EV chargers, easy to do yourself using the included app; the electrician doesn't need to charge extra time for this€0up to €30

By law, the electrical connection of an EV charger to the power grid may only be made by a NEN 1010-certified electrician. If you do it yourself, your fire insurance is often void and you risk a denied claim during any damage inspection. In addition, an EV charger requires a type B residual current device (RCD), the European counterpart of a GFCI, a component that most people without training usually don't have on their radar. What you can safely do yourself as a DIYer: mount the EV charger on the wall before the electrician arrives, and link the app or charging card yourself afterward. That way you spend the electrician's most expensive hours on the work that truly requires expertise. You can also consider running the cable yourself if you have experience with fixed electrical wiring, but always discuss this with the electrician beforehand so the right wire size and route are agreed on.

The full process step by step

1

Assessing the situation and the meter cabinet

The EV charger installer inspects the meter cabinet, checks whether a free circuit is available, and determines whether a type B RCD is already present. The available connection capacity is also checked: is there room for the extra load of charging, or is a meter cabinet upgrade necessary?

30–60 min

2

Planning and installing the cable route

The installation cable (at least 6 mm² for 11 kW charging) is routed along the shortest safe path from the meter cabinet to the charging location: through the wall, via a cable tray, or, for an outdoor route, buried in the ground. Wall penetrations are sealed with fire-resistant material.

45–120 min

3

Mounting and electrically connecting the EV charger

The EV charger is mounted on the wall or a freestanding post and electrically connected. The electrician checks the grounding, installs the required type B RCD, and sets the maximum current to match the capacity of the EV charger and the connection.

30–60 min

4

Modifying the meter cabinet (if needed)

If the existing meter cabinet doesn't have enough capacity, an extra circuit or a new RCBO is installed. When switching to 3-phase charging, the main connection is upgraded in coordination with the regional grid operator: this may require an additional appointment.

30–90 min

5

Testing with the vehicle

The electrician starts a charging session with your actual electric car to check that communication between the EV charger and the vehicle works correctly, the power is right, and no error messages appear. With smart EV chargers, the Wi-Fi connection is tested too.

15–30 min

6

Handover and NEN 1010 statement

The electrician hands over a written NEN 1010 installation report or inspection statement. You'll need this document for any insurance claim and, depending on your municipality, also to apply for a local subsidy or rebate. Always ask for it explicitly.

10–20 min

What can go wrong?The most common pitfalls with EV charger installations: a connection cable that's too thin (fire and outage risk at full charging power), a missing required type B RCD, and a meter cabinet that can't handle the continuous load of charging. Another common mistake: the electrician doesn't provide a NEN 1010 statement. Without this document, you may run into problems with your home insurance after a fire. So always request this document as a standard part of the job. Finally: if you want a 3-phase connection but don't have one yet, expect a waiting time at the grid operator that can run to several weeks.

6 smart money-saving tips

Request at least three quotesPrice differences between EV charger installers can reach hundreds of euros for identical work. Through VakmanBaas, you receive multiple quotes for free and can compare them right away on price and customer reviews.
Check your connection type before choosing an EV chargerA 3-phase EV charger on a 1-phase connection doesn't charge faster but does cost more. Ask your grid operator whether your connection is single-phase or three-phase: that way you avoid buying unnecessarily expensive hardware or having to switch later.
Combine the installation with other electrical workSchedule the EV charger installation together with other electrical jobs, such as upgrading the meter cabinet or installing outdoor lighting. The trip charge is billed only once, and you pay less per hour spent.
Choose the shortest cable route to the meter cabinetThe longer the cable route, the more materials and labor. Choose a charging location as close to the meter cabinet as possible, or discuss with the electrician which route is cheapest. This can save €50–200 on the final bill.
Buy the EV charger yourselfSome electricians add a markup on the EV charger itself. By buying a certified model yourself (from a brand like Easee, Alfen, or Zaptec) and paying the electrician only for labor, you usually save €100–300. Ask in advance whether the electrician works with hardware supplied by the customer.
Prepare the space before the electrician arrivesMake sure the area around the meter cabinet and the future charging location is clear and easy to reach. The less time the electrician spends clearing things or maneuvering, the fewer hours are billed. If you like, mount the EV charger bracket in advance too: that saves half an hour of labor.

Frequently asked questions

How much does it cost to install an EV charger on average?

On average €1,200 to €1,600, all-inclusive. The range is €800 to €3,000 depending on the type of charger, the cable length, and whether the meter cabinet needs to be modified.

How long does the installation take?

A standard installation takes 2 to 4 hours. With long cable routes, excavation, or a meter cabinet upgrade, this can increase to a full workday.

Do I need a permit for an EV charger?

In most cases, no. If you want to install an EV charger along a public road or in a VvE building (an apartment owners' association), you'll need to coordinate with the municipality or the VvE.

Can I install an EV charger myself?

By law, the connection to the power grid may only be made by a licensed electrician (NEN 1010 certified, the Dutch standard for electrical installations). You can sometimes mount the charger yourself, but never the electrical connection.

What's the difference between 1-phase and 3-phase charging?

A 1-phase EV charger delivers up to 7.4 kW and is suitable for most homes. A 3-phase EV charger delivers 11 or 22 kW and therefore charges faster, but it requires a 3-phase electrical connection: check this first with your regional grid operator.

Is there a subsidy for a home EV charger?

The national ISDE subsidy (a Dutch government subsidy for sustainable energy) for home EV chargers has ended. Some municipalities or provinces still offer local programs. Check subsidie.nl or your municipality's website for current options.

Related jobs

Ready to have your EV charger installed?

Describe your job and receive quotes from verified EV charger installers near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →