
Cost of installing crown molding or ornaments in plaster: everything you need to know
A decorative molding along the ceiling or a medallion around the light fixture gives a room character in one go: it's the kind of detail your eye keeps drifting back to. Before you start calculating, there's one thing you need to know, and it's also the biggest source of mistakes: molding is billed per linear meter, not per square meter. Ornaments, medallions, and pilasters are priced per piece, restoration work per hour. So measure the perimeter of your room in meters and add 10 to 15 percent for cutting waste. A ready-made polyurethane molding costs an average of €30 per linear meter installed, a solid plaster molding €35 to €95 per meter, and a ceiling medallion €75 to €400 each.
In this article
- ›What does installing molding or an ornament cost?
- ›Prices by type of molding or ornament (linear m and each)
- ›Material and labor cost breakdown
- ›Hire a contractor or do it yourself?
- ›How does the job go step by step?
- ›Smart ways to save on decorative molding
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€30
PU molding per linear meter, incl. installation
average hourly rate
€52
plasterer per hour (€40–65)
turnaround time
1 day
room with PU molding + medallion; plaster 1.5–3 days
€ Average price by type
| Type of molding or ornament (per linear m or each) | Range | Average price |
|---|---|---|
| Polyurethane (PU) molding, per linear meterStandard crown or cove molding from a catalog (6–12 cm), lightweight and pre-primed, seams sealed with acrylic caulk. All-in installed. | €20 – €45 | €30avg.incl. installation |
| Plaster or ornamental molding, per linear meterSolid plaster molding from a plain 6×6 cm to a heavily profiled 14×26 cm; seams invisibly finished in plaster. All-in installed. | €35 – €95 | €58avg.incl. installation |
| Small ceiling medallion (Ø 30–50 cm), eachMaterial €15–65, labor €40–60 each | €75 – €175 | €115avg.incl. installation |
| Large ceiling medallion (Ø 60–90 cm), eachMaterial €70–165, labor €60–120; aligning around the light fixture, often with two people | €175 – €400 | €265avg.incl. installation |
| Restoring an existing ornament, per hourSpecialized repair: securing, crack repair, recreating missing parts with a mold. Always billed by the hour, never per meter. | €55 – €95 | €72avg.incl. labor |
| Pilaster or fireplace surround, eachShaft, base, and capital, installed and finished. A complete fireplace surround is closer to €700–2,500. Highly custom. | €300 – €800 | €500avg.incl. installation |
Pay close attention to the unit: molding is priced per linear meter, meaning the perimeter of the room in meters, not per square meter of floor or ceiling. Medallions, pilasters, and fireplace surrounds are billed per piece, restoration per hour. When measuring, add 10 to 15% cutting waste on top of the perimeter. All amounts are all-in installed (material and labor) and exclude VAT; painting, leveling a wavy surface, and scaffolding are quoted separately. The amounts for pilasters, fireplace surrounds, and restoration are estimates: there's no public price comparison for these, it's always custom work on quote. Based on Google price research.
Material and labor costs
All amounts 'per linear meter' apply per meter of molding, not per m² of wall or ceiling. Plasterer hourly rate €40–€65/hour; expect 4 to 8 linear meters of PU molding per hour and 2 to 4 linear meters for heavy plaster profiles. VAT tip for a home older than 2 years: 9% VAT applies to labor and to material the plasterer supplies and installs themselves. If you buy the moldings yourself, you pay 21% on them, so running everything through the contractor is often cheaper on balance.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Installing ready-made PU molding in a square roomStandard profile on construction adhesive, square corners: billed per linear meter | DoableYou can get a miter box, construction adhesive, and acrylic caulk at the home improvement store; PU weighs little, so you can easily hold the profile in place yourself | €20–€45 per linear m | up to €25 per linear m |
| Miter cutting a corner that isn't 90 degreesOlder homes rarely have square corners; measure and halve each corner | With experienceMeasure the actual angle and cut both pieces at half of it; ready-made corner pieces (€8–€47 each) avoid this and save hours of fitting and filling | €15–€40 per corner | up to €30 per corner |
| Installing solid plaster molding with a seamless finishHeavily profiled plaster on plaster adhesive, seams filled in the same material | Not recommendedA 14×26 cm profile is too heavy to hold in place alone while the adhesive sets; finishing the seams in plaster leaves no room for mistakes and is exactly what you pay the contractor for | €35–€95 per linear m | Savings don't outweigh the risk |
| Installing a ceiling medallion around the light fixturePer piece; aligned from the center of the room and the existing fixture position | With experienceSwitch off the circuit, feed the cable neatly through the medallion, and align it all precisely; a medallion of 60 cm or larger takes two pairs of hands and a stable setup | €75–€400 each | up to €120 each |
| Repairing a historic ornament or recreating it with a moldRestoration work in a historic building or prewar home: always by the hour | Not recommendedMaking a mold, casting, and fitting it in is a separate trade; in a historic building, irreversible damage can also cost you subsidy eligibility | On quote (estimate €55–€95/hour) | No recommended savings |
Always start with the unit, because that's where comparing quotes most often goes wrong: molding is priced per linear meter (the perimeter of your room in meters), ornaments and medallions per piece, and restoration per hour. If you compare a price per meter with a price per square meter, you're comparing two completely different things. Include the perimeter plus 10 to 15 percent cutting waste in every request, and you'll get quotes that line up with each other. The second pitfall lies under the molding, not in it. The surface must be flat, dry, clean, and sound, and wallpaper has to come off. On a wall that bulges or dips, a gap forms behind the molding and the profile breaks when pressed on. Leveling costs €5 to €15 per linear meter and is often not included in the quote. That's the classic cause of extra charges on this job. Ask about it explicitly. Finally, think about VAT: for a home older than 2 years, 9% VAT applies to labor and to material the plasterer supplies and installs themselves, while you pay 21% on moldings you buy yourself. Buying them yourself to save money backfires more often than people think.
The full process step by step
Measuring and choosing a profile
The plasterer measures the room's perimeter in linear meters and decides on the profile height with you. A rule of thumb from practice: the higher the ceiling, the bolder the profile can be. A heavy 14×26 cm molding in a room of 2.40 meters makes the space feel squashed. They add 10 to 15 percent cutting waste to the perimeter and take the supply lengths into account: plaster 100, 120, or 150 cm, PU usually 200 cm.
30–45 min
Checking and preparing the surface
Wallpaper comes off and the wall is checked for flatness, moisture, and soundness. A straightedge shows whether the wall bulges or dips; if so, the strip along the molding is leveled first (€5–€15 per linear meter). If you skip this, a gap forms behind the molding and the profile can break when pressed on.
1–3 hours
Marking the line and setting the medallion position
A continuous line is marked all around with a laser or level. For a medallion, both the center of the room and the actual position of the light fixture are measured. The two rarely line up exactly, and which one you go by determines how the end result looks.
30–60 min
Cutting: miters or ready-made corner pieces
With square corners, the molding is miter cut at 45 degrees. If the corners aren't square (almost standard in older homes), the actual angle is measured and halved, or ready-made corner pieces (€8–€47 each) are used. They cost more in material but save hours of fitting and filling.
1–2 hours
Gluing, pressing, and aligning
PU profiles are installed with construction adhesive and temporarily supported until the adhesive sets. Plaster moldings go on with plaster adhesive and are often additionally secured with screws or nails until the adhesive has cured. A heavy plaster molding is installed by two people: the profile has to stay right on the line while the adhesive grabs.
2–5 hours
Finishing seams and joints
This is where the difference between the materials shows. Plaster on plaster closes seamlessly in the same material, so the molding becomes one with the ceiling. PU and polystyrene are finished with acrylic caulk; that seam stays sensitive to temperature movement and can develop hairline cracks after a few years. The joints with the wall and ceiling are also finished cleanly.
1–3 hours
Curing, painting, and final walkthrough
The work needs to cure for 24 to 48 hours before painting. Painting too early traps moisture and causes blisters or small cracks. PU is usually pre-primed and can go straight into the finish coat; plaster gets a primer first. At handover, you walk the line together under raking light: that's the moment to spot any unevenness, not later.
1–2 hours (after 24–48 hours of drying)
6 smart money-saving tips
Frequently asked questions
Does a plasterer charge per square meter or per linear meter?
Per linear meter, and that's exactly where comparing prices goes wrong. You calculate with the perimeter of the room, meaning the combined length of all walls the molding runs along, not with the floor or ceiling area in m². A room of 4 by 5 meters has a perimeter of 18 meters, not 20 m². Ornaments, medallions, pilasters, and fireplace surrounds are billed per piece, and restoration work per hour. If you come across a price per m² for molding, the unit is wrong.
How many meters of molding do I need?
Measure the length of each wall where the molding will go, add them up, and add 10 to 15 percent for cutting waste. That waste isn't a guess: plaster moldings come in fixed lengths of 100, 120, or 150 cm and PU moldings usually in 200 cm, and the leftovers after miter cutting are often too short to use anywhere. An online calculator almost always leaves that waste out. Better to order one length too many than too few: reordering from a different production batch can cause a slightly visible color difference.
Is plaster more expensive than polyurethane?
Only in the heavier range. Bare material costs €8 to €25 per meter for PU and €12 to €61 per meter for plaster, so a narrow plaster molding is actually cheaper than a wide PU one. The difference comes from labor: plaster is heavy, goes slower, and the seams are filled with plaster instead of caulked. All-in, plaster therefore comes out roughly 40 to 80 percent higher. Plaster gives a sharper, deeper profile, can be custom-made with molds, is fire-resistant, and blends seamlessly with a plaster ceiling, but it's too heavy for a suspended ceiling and can't bend. PU is light, moisture-resistant, bendable for curved walls, and usually pre-primed, but the caulked seam remains a weak spot. Quick advice: a visible living room or a connection to existing historic work calls for plaster, while a bedroom, bathroom, tight budget, or curved wall calls for PU.
What's the cheapest material?
Polystyrene, at €3 to €10 per linear meter. There's a trade-off, though: it's fragile, a fingertip leaves a dent, and the seams are hard to hide and stay visible under paint. Many plasterers advise against it and sometimes won't give a warranty on it. For a rental property or a temporary solution it may do; if you want to enjoy it for ten years, PU is the cheapest sensible choice.
Is it true I can save on VAT by buying the moldings through the plasterer?
Yes, and it really saves money. For a home older than 2 years, the reduced VAT rate of 9 percent applies to labor and to material the plasterer supplies and installs themselves. If you buy the moldings yourself at a home improvement store or online shop, you simply pay 21 percent on that material. On €600 of molding, that easily saves about €70. Running everything through the contractor is therefore often cheaper on balance than buying it yourself, and you have one point of contact if something's off with the profile.
Why does my molding crack after a few years?
Usually because of three things. The seam: with PU and polystyrene the seam is sealed with acrylic caulk, which moves with temperature changes. After a few years, hairline cracks can appear there. The surface: if the wall bulges or dips and hasn't been leveled, there's a gap behind the molding and the profile is under tension. And the curing time: a layer of plaster or filler that's too thick dries on the outside while the core is still damp, and then shrinkage cracks are almost guaranteed. Plaster on plaster has this problem much less, because the seam is truly closed in the same material.
Can I modify ornaments in a historic building?
Changing historic interior elements such as plaster ceilings and ornaments requires an omgevingsvergunning (the Dutch permit for building work), in this case a permit for work on a historic building. Regular maintenance where the material, color, shape, and profile don't change doesn't need a permit, but that line is narrower than it seems, so always check with the municipality beforehand. The work belongs with a restoration plasterer; expect roughly 30 to 100 percent extra cost for making molds, a higher hourly rate, slower work, and documentation. Those extra costs are estimates: there's no public price transparency on this, so always request a custom quote. For landmark buildings with a residential function there's the woonhuissubsidie (a Dutch subsidy for maintaining residential landmark buildings): up to 38 percent of the eligible maintenance costs, to be applied for between March 1 and April 30 for invoices from the previous year; above €70,000 an inspection report is required. Preservation comes before replacement: renewing everything can make you lose eligibility for the subsidy.
Related jobs
Ready for decorative molding or an ornament in your home?
Describe your job, share the room's perimeter in meters, and receive quotes from verified plasterers near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes