Over the years, facades and walls get affected by algae, moss, soot, and pollution. Professional facade cleaning or sandblasting restores their appearance and protects the masonry. The cost depends on the cleaning method, the surface area, how dirty the facade is, and how accessible it is.
In this article
- ›What does facade cleaning or sandblasting cost?
- ›Prices by cleaning method
- ›Material and labor costs
- ›Hiring a contractor vs. doing it yourself
- ›How does the cleaning process work?
- ›Money-saving tips for facade cleaning
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€950
facade cleaning for a row house (approx. 60 m²)
average hourly rate
€45
contractor hourly rate (€40–55/hour)
turnaround time
1–2 days
depending on surface area and method
€ Average price by type
| Cleaning method | Range | Average price |
|---|---|---|
| Pressure washingsuitable for light dirt, algae, and moss | €8 – €14 | €11avg.incl. labor |
| Chemical facade cleaning (most popular)effective against soot, limescale, and stubborn dirt | €12 – €20 | €16avg.incl. labor |
| Blasting (dry blasting / soda blasting)for deep cleaning of heavily soiled facades | €18 – €30 | €24avg.incl. labor |
| Facade cleaning + water repellent sealercleaning combined with a protective coating | €20 – €35 | €27avg.incl. labor |
Prices per m² including labor; scaffolding or aerial lift rental is charged separately for hard-to-reach facades. Based on Google price research.
Material and labor costs
Cleaning company / facade contractor hourly rate averages €40–55/hour. Blasting requires specialized equipment and is more expensive than pressure washing.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Removing light algae or moss (ground floor)Small area, easy to reach, no pressure washer used | DoableEasy to do with a garden hose, stiff brush, and anti-algae product from the hardware store; no special equipment needed | €20–€60 (materials) | up to €250 saved |
| Pressure washing at height (second floor or higher)Facade above the ground floor, scaffolding or ladder required | Not recommendedSerious fall risk when working at height; too much water pressure erodes mortar joints and can force water behind the facade | €500–€900 (contractor) | No recommended savings |
| Chemical facade cleaning for stubborn stainsSoot, limescale, or biological growth that won't rinse off | With experienceCorrect concentrate, dwell time, and protective clothing are essential; the wrong product eats into mortar joints or leaves white residue | €800–€1,400 (contractor) | up to €500 saved |
| Dry blasting or soda blastingHeavily soiled facades, graffiti, or deep soot damage | Not recommendedRequires a specialized blasting machine and blasting media; incorrect settings erode brick and mortar joints; true sandblasting is banned in the Netherlands | €1,200–€2,500 (contractor) | No recommended savings |
| Sealing after facade cleaningApplying a protective water repellent coating to a dry, cleaned facade | With experienceThe facade must be completely dry (at least 48 hours after cleaning); uneven application leaves spots where water still gets in | €300–€600 (contractor) | up to €200 saved |
Facade cleaning has a clear line: anything you can reach from the ground floor that's no more than light algae or moss, you can tackle yourself as a DIYer with a garden hose and anti-algae product. As soon as you have to work higher up, need chemicals, or require a blasting technique, a certified facade contractor is essential. Pressure washers are set to maximum pressure for professional use: incorrect use permanently damages mortar joints and brick and is also dangerous on upper floors. Blasting (dry blasting, soda blasting) also requires specialized equipment and knowledge of blasting media: true sandblasting is banned in the Netherlands because of the fine dust risk. A contractor has the right products and personal protective equipment, and knows how to properly shield the surroundings (neighbors, plants, window frames). After cleaning, you can apply a water repellent sealer on the ground floor yourself once the facade is completely dry, but here too: mistakes are hard to fix.
The full process step by step
Inspection: determine the type of dirt and method
The facade contractor inspects the type of brick, the mortar joints, and the nature of the dirt: is it algae, moss, soot, limescale, biological growth, or graffiti? Based on this, the cleaning method is chosen. At the same time, they assess accessibility: is a ladder enough, or is scaffolding or an aerial lift needed?
30–60 min
Shielding the surroundings
Windows, window frames, doors, and adjacent plants are covered with plastic sheeting or protective cloth. With chemical treatment or blasting, covering neighboring property and public space is mandatory to prevent damage and contamination. A good contractor takes their time with this.
30–60 min
Pre-cleaning or pretreatment
With chemical cleaning, the product is applied and left to work for 15–60 minutes. With blasting, a test patch is done on an inconspicuous area to determine the right pressure and media dosage without damaging the facade.
15–60 min (depending on method)
Cleaning the entire facade
The contractor cleans the facade systematically from top to bottom: with pressure washing using the right nozzle and pressure (never straight at the mortar joints), with chemical cleaning by brushing and rinsing, and with blasting using controlled blasting movements. Stubborn remaining stains are treated locally.
4–12 hours
Thorough rinsing and checking the result
After cleaning, the entire facade is rinsed with clean water to remove chemical residue and wash away loosened dirt. The contractor then checks the result for remaining stains, damaged mortar joints, and any white residue (efflorescence) that needs touching up.
30–60 min
Drying time and optional sealing
The facade must dry completely for at least 24–48 hours before a water repellent sealer can be applied. The sealer is applied with a wide brush or airless sprayer and penetrates deep into the brick surface to keep moisture out for the long term.
24–48 hours drying time + 2–4 hours sealing
Completion, cleanup, and maintenance advice
The contractor removes all protective material, rinses the surroundings clean, and tidies up the work area. They then advise you on the best maintenance interval, signs of early regrowth to watch for, and the best time for the next treatment.
30–45 min
6 smart money-saving tips
Frequently asked questions
What does facade cleaning cost on average?
On average €10–€25 per m². For a row house (approx. 60 m²), you'll pay €600–€1,500. With a water repellent sealer added, expect €20–€35 per m².
How long does facade cleaning take?
An average row house is cleaned in 1 day. Larger or heavily soiled facades take 2 days. Drying time after chemical treatment is 24–48 hours.
Do I need a permit?
Usually not. If the scaffolding or aerial lift is on the public road, you may need a municipal exemption. Check this with the contractor.
Can I do it myself?
You can tackle light dirt yourself with a garden hose and a brush. For pressure washing, chemical, or blasting techniques at height, it's better to hire a contractor: incorrect use damages mortar joints and brick.
Which is better: pressure washing or chemical cleaning?
Pressure washing is enough for algae and moss. Stubborn dirt (soot, limescale, graffiti) is removed more effectively with a chemical treatment. A contractor assesses which method best suits your facade.
Is sealing a facade worth it?
Yes. A water repellent sealer applied after cleaning keeps moisture out, slows algae regrowth, and extends the life of the facade. The extra cost (approx. €8–€15 per m²) pays for itself because you need to clean less often.
Related jobs
Ready to have your facade professionally cleaned or blasted?
Describe your job and receive quotes from verified facade cleaners near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes