Cost of raising a roof ridge: everything you need to know
A ridge raise lifts the ridge of your existing roof to create more living space in the attic or to make room for a dormer. The cost depends on how high the ridge is raised, the type of roof structure, the size of the home, and any additional work such as insulation and finishing.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€12,500
including materials, labor, and permit
average hourly rate
€55
contractor hourly rate (€45–70/hour)
turnaround time
3–7 workdays
depending on scope and type of structure
€ Average price by type
| Type of ridge raise | Range | Average price |
|---|---|---|
| Small ridge raise (30–50 cm)Raising existing purlins, same roof pitch | €6,000 – €10,000 | €8,000avg.incl. installation |
| Standard ridge raise (50–80 cm)New purlin structure, adjusted roof sheathing | €9,000 – €16,000 | €12,500avg.incl. installation |
| Large ridge raise (>80 cm)Raising the entire roofline, new gable walls | €15,000 – €25,000 | €19,500avg.incl. installation |
| Ridge raise with dormerCombined job including dormer installation | €18,000 – €35,000 | €26,000avg.incl. installation |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Applying for the permitSubmitting a building permit application to the municipality | DoableForm can be completed online through Omgevingsloket | €300–€600 | €0–€200 |
| Structural calculationStructural analysis of the new roof structure | Not recommendedRequires a certified structural engineer; mistakes = danger | €400–€900 | €0 |
| Removing the existing roof structureRemoving purlins, rafters, and roof sheathing | Not recommendedLoad-bearing structure: major safety risk | €800–€2,000 | €0 |
| Painting and finishingFinishing the attic interior after the structural work | With experienceDoing it yourself saves labor costs, quality varies | €500–€1,500 | €300–€900 |
A ridge raise is a structural job that affects the load-bearing structure of your home. The roof structure keeps the roof stable and, indirectly, keeps everyone living there safe. Structural mistakes can lead to cracking, water infiltration, or even collapse. That's why you should always have this work done by a licensed general contractor with proven experience in roof renovations. Where you can save money is on the side work: submitting the permit application yourself, painting the attic after completion, or comparing roof insulation through multiple quotes. Combine the ridge raise with roof insulation to share labor costs and possibly qualify for the ISDE subsidy.
The full process step by step
Research and quotes
Decide how high you want the ridge raised and have at least three general contractors or roofing contractors visit for a no-obligation quote. Also discuss whether roof insulation can be done at the same time.
1–2 weeks
Structural calculation and permit
A certified structural engineer makes a structural analysis of the new roof structure. Based on that, you (or the general contractor) apply for the building permit with your municipality.
6–12 weeks
Preparation and scaffolding
The general contractor sets up scaffolding or a crane and provides temporary weatherproofing. Materials are delivered and the work area is shielded.
1 day
Raising the ridge
The existing roof structure is partly or fully taken apart. The new purlins and rafters are installed at the calculated height, after which the roof sheathing and roofing are applied.
3–5 workdays
Finishing and handover
The scaffolding is removed, the debris is hauled away, and the attic interior is finished. The general contractor hands over the work with a checklist; discuss any repairs right away.
1–2 days
4 smart money-saving tips
Frequently asked questions
How much does a ridge raise cost on average in the Netherlands?
The average cost of a ridge raise is between €8,000 and €20,000 including VAT. A small raise of 30–50 cm costs about €6,000–€10,000; a larger job of more than 80 cm can run to €25,000 or more. Always request multiple quotes for a fair comparison.
Do I need a building permit for a ridge raise?
Yes, a building permit is required in almost all cases. A ridge raise changes the appearance of the home and therefore goes beyond the limits of permit-free construction. Submit the application to your municipality; processing usually takes 6–12 weeks. Cost: about €300–€600.
How long does a ridge raise take?
The work itself takes 3–7 workdays, depending on scope and complexity. Add the permit procedure (6–12 weeks) and any lead time for the general contractor and suppliers. Ideally, plan it outside the rainy season, although good general contractors always provide temporary weatherproofing.
Can I raise a roof ridge myself?
That's strongly discouraged. A ridge raise affects the load-bearing structure of your home. Mistakes can lead to instability, moisture problems, or even collapse. On top of that, the municipality usually requires a structural calculation from a certified structural engineer for the permit. Always leave this work to a licensed general contractor or roofer.
Can I get a subsidy for a ridge raise?
There's no subsidy specifically for a ridge raise, but if you have roof insulation installed at the same time, you may qualify for the ISDE subsidy (Investeringssubsidie Duurzame Energie en Energiebesparing, a Dutch government subsidy for sustainable energy and energy saving). Apply through RVO.nl (the Netherlands Enterprise Agency) before the work starts. Combining jobs also saves on labor costs.
Related jobs
Ready to have your roof ridge raised?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes