Skip to main content

Are you a contractor? Sign up for free

Contractor plastering a ceiling in a Dutch home
8 min readPrices verifiedPlastering & Finishing

Cost of plastering a ceiling: everything you need to know

Plastering a ceiling means applying a smooth coat of plaster to a rough or damaged ceiling. The cost depends on the surface area, the condition of the ceiling, the type of plaster you choose, and how accessible the ceiling is. A contractor usually charges per m² or by the hour.

In this article

  • ›Average cost
  • ›Prices by type
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›Step by step
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€750

average room (±25 m²)

average hourly rate

€45–€65

contractor hourly rate (€45–65/hour)

turnaround time

1 day

depending on surface area and prep work

€ Average price by type

Plasterwork typeRangeAverage price
Skim coat (smooth finish plaster)Fine skimming of an existing ceiling€10 – €20€15avg.incl. labor
New plasterworkComplete new plaster system on a rough ceiling€20 – €35€27avg.incl. labor
Plaster repairRepairing cracks, peeling, or loose plaster€25 – €50€35avg.incl. labor
Decorative / textured plasterDecorative finish with texture or color€25 – €45€33avg.incl. labor

Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.

Material and labor costs

Finish plaster / finishing gypsummaterial
€2€1 – €3
Base coat plaster / stuccomaterial
€3€2 – €5
Contractor laborlabor
€17€10 – €25
Scaffold or work platform rentaladditional
€50€30 – €80
Pretreatment (primer)material
€2€1 – €3
Masking and protecting floors/wallsadditional
€35€20 – €60

Hourly rates vary by region and contractor.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Skim coat on a small ceiling (< 10 m²)Thin layer of finish plaster over existing plasterWith experienceTakes practice; visible mistakes for beginners€15–30 materials€100–200
Completely new plaster ceilingBase and finish coats on a rough or bare ceilingNot recommendedRequires expertise and the right tools€50–120 materials€300–700
Small crack repairFilling a joint or crack with filler/plasterDoableEasy to do yourself with the right kit€10–25 materials€50–150
Repair after a leak or damageRemoving damaged plaster and reapplying itNot recommendedHave the cause of the leak fixed first; discoloration possible€30–80 materials€150–400

Plastering a ceiling is harder than plastering a wall: you're working overhead, the coat has to be applied in one smooth motion, and mistakes are immediately visible from every corner of the room. Small repairs and skim coating a small ceiling area are doable for a handy DIYer with the right tools and some practice. For larger areas, new plasterwork on rough concrete or drywall, or repairs after water damage, a contractor is strongly recommended. A failed coat of plaster is hard to correct, and the repair costs quickly exceed the original savings. Based on Google price research.

The full process step by step

1

Preparation and inspection

The contractor inspects the ceiling for loose plaster, moisture, cracks, and adhesion. Damaged sections are removed and the surface is cleaned. Floors, walls, and edges are covered.

30–60 min

2

Applying primer

A primer is applied to improve the adhesion of the plaster coat, especially on drywall, concrete, or painted surfaces. The primer must be completely dry before the next step.

30 min + drying time

3

Base coat or joint filling

For new plasterwork, a base coat is applied and leveled. Cracks and holes are filled and smoothed. For a skim coat, this step is skipped.

1–3 hours

4

Applying and troweling the finish coat

The finish plaster is applied and troweled smooth with a stainless steel trowel. This takes speed and technique: the coat can't be too wet or too dry. After troweling, the ceiling is left to set slightly and may be gone over once more.

1–4 hours

5

Drying time and completion

The plaster takes 2–4 weeks to dry completely. The contractor checks for small cracks (hairline cracks from shrinkage are normal) and advises you on when to paint. After that, the room can be tidied up.

2–4 weeks drying time

What can go wrong?The most common problem is poor adhesion of the new plaster coat due to an improperly prepared surface or too thin a primer coat. This leads to peeling or detachment within a few months. Moisture problems that aren't fixed before plastering will always come back as stains or swelling. Make sure leaks are fixed before the plasterwork is applied.

4 smart money-saving tips

Request at least three quotesPrices for plasterwork vary widely by contractor and region. Compare quotes from at least three plasterers and check exactly what's included in the price (materials, prep work, cleanup).
Combine it with other workHave the plasterwork combined with painting or installing an interior wall. Contractors charge less for travel and setup time when they do several jobs at once. This can save 10–20%.
Do the prep work yourselfClear out the room yourself, mask the floor and walls, and remove loose plaster. This saves hours of contractor time (€45–65 per hour) and noticeably lowers the total cost.
Plan outside peak seasonPlasterers are busiest in spring (April–June) and early fall. Schedule your job in January–February or August–September for better availability and possibly a lower price.

Frequently asked questions

How much does plastering a ceiling cost per m²?

On average, you pay €15 to €35 per m², including labor and materials. A skim coat is cheaper (€10–20/m²); completely new plasterwork or repair work costs more. Always request multiple quotes to get the best price in your region.

Do I need to have the ceiling sanded or scraped first?

If the existing plaster adheres well, sanding usually isn't necessary. With loose plaster, peeling, or paint that doesn't adhere, the contractor will scrape it off first. This takes extra time and affects the final price.

How long does plaster need to dry before you can paint?

Fresh plaster usually takes 2 to 4 weeks to dry completely, depending on the thickness and the humidity. You should only paint once the plaster is completely dry and a matte white. Painting too early causes moisture problems and peeling.

What's the difference between a skim coat and plastering?

A skim coat means smoothing an existing, stable ceiling with a thin layer of finish plaster (0.5–2 mm). Plastering involves applying one or more layers of base coat plaster followed by a finish coat. A skim coat is cheaper and faster; full plastering is needed for rough concrete or a damaged ceiling.

Can I get a subsidy or tax benefit for plasterwork?

In the Netherlands, there's no direct subsidy for plasterwork alone. If the plasterwork is part of a broader renovation or insulation project, there may be subsidy options through ISDE (a Dutch government subsidy for sustainable energy) or the energiebespaarlening (a Dutch energy-saving loan). Check the RVO (Netherlands Enterprise Agency) website for current programs.

Related jobs

Ready to have your ceiling plastered?

Describe your job and get quotes from verified contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →