Skip to main content

Are you a contractor? Sign up for free

Contractor getting baseboards ready for paint in a Dutch home
9 min readPrices verifiedPainting & Wallpapering

Cost of getting baseboards ready for paint: everything you need to know

Getting baseboards ready for paint includes sanding, filling, priming, and leveling untreated or damaged baseboards so they're ready for the final coat of paint. The cost depends on the type of baseboard material, the length in linear meters, and the condition of the surface. A skilled painter charges on average €8 to €18 per linear meter, depending on the level of finish.

In this article

  • ›What does it cost to get baseboards ready for paint?
  • ›Prices by type of baseboard
  • ›Material and labor costs
  • ›Hiring a contractor vs. doing it yourself
  • ›How does the process work?
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€650

average price living room (approx. 50 linear m)

average hourly rate

€38

contractor hourly rate (€35–45/hour)

turnaround time

1–2 days

depending on scope and level of finish

€ Average price by type

Type of baseboard finishRangeAverage price
Light prep for MDF baseboardsSanding and priming, new MDF without major defects€6 – €10€8avg.incl. labor
Standard finish (most popular)Sanding, filling, sealing seams, and priming, suitable for new construction and renovation€10 – €15€12avg.incl. labor
Intensive prep for old baseboardsSanding old paint layers, multiple filler coats, crack repair€14 – €22€18avg.incl. labor
Decorative profiled wood baseboardsExtra handwork due to profiles and molding, time-intensive€18 – €28€23avg.incl. labor

Prices include materials and labor; expect a higher price with extensive damage or profiled molding. Based on Google price research.

Material and labor costs

Filler and wood puttymaterial
€40€20 – €60
Primermaterial
€28€15 – €40
Sandpaper (various grits)material
€18€10 – €25
Painter labor (approx. 6–16 hours)labor
€400€210 – €600
Masking materials and tapeadditional
€20€10 – €30
Any travel costs / minimum chargeadditional
€30€0 – €75

Painter hourly rate on average €35–45/hour. Hourly rate excludes VAT; travel costs and minimum charges may be added.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Sanding new MDF baseboardsSanding rough or untreated MDF baseboards smooth in new construction as prep for primerDoableTechnically simple with a sanding block and the right grits (80 → 120); takes patience but no expertise€15–35 materialsup to €350
Sealing seams and gaps with acrylic caulkSmoothing the seam between baseboard and wall or floor so no gap shows after paintingDoableA caulk gun and smoothing tool are enough; note: use flexible acrylic caulk, not hard filler€15–30 materialsup to €200
Filling damaged baseboardsFilling screw holes, dents, and cracks with wood filler and sanding smooth after dryingWith experienceCareless filler work or too little sanding shows up as bumps right after painting; a test piece is recommended€25–55 materialsup to €300
Removing and retreating old paint layersRemoving aged, peeling, or overly thick paint buildup for a flat surfaceWith experienceRequires chemical strippers or a heat gun; risk of damaging the baseboard profile and an uneven surface€40–80 materialsup to €500
Getting decorative profiled baseboards ready for paintFully smoothing classic profiled molding or ornaments, including all hollows and ridgesNot recommendedRequires precision sanding in narrow profiles with folded sandpaper or sanding sticks; mistakes can't be hidden after high-gloss painting€50–100 materialsNo recommended savings

For new, untreated MDF baseboards in a newly built home, doing it yourself is quite doable: with sandpaper in 80 and 120 grit, a tube of flexible acrylic caulk, and a can of MDF primer, you'll get a long way. A contractor painter is essential once the surface needs a satin or high-gloss finish, because every imperfection in the filler work then becomes more visible. Hiring a contractor is also the safest choice for decorative baseboards with deep profiles, for removing multiple layers of old paint, or when the baseboards meet new wallpaper directly (where a clean seam is essential). No legal certifications apply to this type of job, but the quality of the end result depends entirely on the skill of whoever preps the surface.

The full process step by step

1

Inspecting the baseboards and material type

The painter walks through the room and assesses the type of baseboard material (MDF, solid wood, vinyl, or composite profile), existing paint layers, cracks, loose pieces, and how the baseboards meet the wall and floor. Based on this, they decide how many filler coats and sanding rounds are needed and which products to use.

20–40 min

2

Masking and protecting the room

The floor and bottom of the wall are covered with paper masking tape and fleece protective sheeting. This keeps sanding dust and filler residue off the flooring or freshly painted walls. Where the baseboards meet new wallpaper, the seam is taped off extra carefully.

15–30 min

3

Rough sanding the surface

The baseboard surface is dry-sanded with coarse sandpaper (60–80 grit) to remove hardened paint layers, burrs, rough factory MDF surfaces, and loose pieces. On profiled molding, folded sandpaper or a sanding stick is used to reach the hollows without damaging the profile edge.

1–3 hours

4

Filling damage and seams

Screw holes, dents, cracks, and factory seams are filled with wood filler or polyester filler. The seam between baseboard and wall and the seam between baseboard and floor are sealed with flexible acrylic caulk: not hard filler, because that cracks when the wood expands. The filler is applied thinly and left slightly proud so there's enough material to sand flat after drying.

1–2 hours + 2–4 hours drying time

5

Sanding to a flat surface

Once fully dry, the filler is sanded smooth with fine sandpaper (150–180 grit) until the surface feels completely flat and even. A final sanding with 220 grit follows for the finest surface. Sanding dust is removed completely with a dry vacuum and a lint-free cloth.

1–2 hours

6

Applying primer

A thin coat of MDF primer or wood primer is applied with a brush: on profiled molding with a fine round brush so the primer also gets into the hollows. The primer seals the filler and wood surface, ensures even absorption of the final coat, and keeps paint from soaking into porous spots. After drying, it's lightly sanded with 240 grit.

1–2 hours + 2–3 hours drying time

7

Final inspection and handover

The painter inspects the surface under raking light (light from the side) to spot any imperfections, filler edges, or missed spots. Small corrections are made right away. After approval, the masking materials are removed and the baseboards are ready for the final coat of paint or lacquer.

20–40 min

What can go wrong?The most common mistake when getting baseboards ready for paint is too little drying time between filler and primer: filler that's still damp under the primer leads to blistering and poor adhesion of the final coat. Another common pitfall is skipping sanding steps: after painting, grooves and sanding scratches show up right away, especially with a satin or high-gloss finish. On decorative profiled baseboards, sandpaper that's too coarse damages the sharp profile edge; always use folded sandpaper in the hollows. Never use hard filler for the seam along the wall: wood and wall expand differently by season, so a hard seam will crack within a year. Flexible acrylic caulk is the only right choice here.

6 smart money-saving tips

Combine with interior painting in the same roomHave the painter get the baseboards ready for paint while they're also painting the walls or doors. The trip charge and masking work are then spread over the whole job, which can easily save €75–€150 on a living room compared to a separate job.
Do the rough sanding yourselfThe initial sanding of undamaged MDF baseboards is technically simple but time-consuming. Sand with 80 and 120 grit yourself before the painter arrives: they can then start right away with filling and primer. This saves 2–4 hours of contractor labor, or €70–€160.
Ask the painter for a materials listFiller, primer, and sandpaper are 15–25% cheaper at a home improvement store than when the painter buys them with a markup. Ask in advance which products and quantities they use and buy them yourself. Make sure you buy the right products: MDF baseboards need MDF primer, not an all-purpose wood primer.
Replace badly damaged baseboards instead of intensive prepMDF baseboards are inexpensive (€1.50–€4 per linear meter) and factory-primed. If the existing baseboards have several old paint layers or major damage, installing new baseboards can be cheaper than intensive prep of the old material.
Schedule the job in fall or winterPainters are busiest in spring and summer. By scheduling your job in fall or winter, you'll have more choice of available contractors and can sometimes negotiate a 5–10% discount on the hourly rate.
Bundle multiple rooms into one jobA painter who gets baseboards ready for paint in three rooms at once works more efficiently than on three separate jobs. With a scope of 100+ linear meters, you can often negotiate a sharper total rate, because the contractor has to drive back and forth less often and material use is more efficient.

Frequently asked questions

What does it cost on average to get baseboards ready for paint?

On average €8 to €18 per linear meter. For a complete living room (approx. 50 m), you'll pay between €400 and €900 including materials and labor. The exact price depends on the condition of the baseboards and the level of finish you want.

What's the difference between getting baseboards ready for paint and painting them?

Getting them ready for paint is the prep work: sanding, filling, sealing seams, and priming. Only after that are the baseboards painted (the final coat). Many contractors offer both steps combined, but you can also hire out the prep separately.

How long does it take to get baseboards ready for paint?

For an average home, it takes 1 to 2 workdays. A drying time of several hours is needed between filler coats. Scope and damage determine the exact timeline.

Can I get baseboards ready for paint myself?

Yes, technically you can do it yourself. You'll need sandpaper (80 and 120 grit), wood filler, a putty knife, and primer. It does take patience and a steady hand, though: sloppy filler work is clearly visible after painting. For a good result, hiring a painter is recommended.

Do I need a permit to finish baseboards?

No, you don't need a permit to get baseboards ready for paint. It's purely a cosmetic finishing job indoors.

What determines the price of getting baseboards ready for paint?

The main factors are: the type of baseboard material (MDF, wood, vinyl), the condition of the surface (new or already painted), the length in linear meters, the level of finish you want, and the contractor's hourly rate in your region.

Related jobs

Ready to have your baseboards professionally made ready for paint?

Describe your job and receive quotes from verified painters near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →