Skip to main content

Are you a contractor? Sign up for free

Contractor working on a prefab roof on a Dutch home
8 min readPrices verifiedRoofing

Cost of a prefab roof: everything you need to know

A prefab roof is a roof structure that's pre-built in a factory and installed on site. The cost depends on the roof type (gable roof, flat roof, or shed roof), the size in m², the insulation value, and the roofing material you choose. Labor costs, crane lifting, and any demolition costs for the old structure also count.

In this article

  • ›Average cost
  • ›Prices by type
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›Step by step
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€14,500

average for a complete installation including insulation

average hourly rate

€55

contractor hourly rate (€45–€75/hour)

turnaround time

1–3 days

depending on roof area and complexity

€ Average price by type

Roof typeRangeAverage price
Flat prefab roofLightweight structure, suitable for additions and extensions€5,000 – €14,000€9,000avg.incl. installation
Prefab gable roofClassic two-pitch roof, most requested for home additions€9,000 – €22,000€14,500avg.incl. installation
Shed roof (prefab)Single-pitch roof, popular for modern additions€7,000 – €18,000€11,500avg.incl. installation
Prefab hip roofFour sloping sides, more material and labor€14,000 – €28,000€20,000avg.incl. installation

Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.

Material and labor costs

Prefab roof panels / trussesmaterial
€6,500€3,500 – €10,000
Roofing (tiles, EPDM, or bitumen)material
€2,800€1,500 – €5,000
Roof insulation (Rc ≥ 4.5)material
€1,500€800 – €2,500
Installation labor costslabor
€3,200€1,800 – €5,500
Lifting costs (mobile crane)additional
€700€400 – €1,200
Removal of demolition wasteadditional
€450€200 – €800

Hourly rates vary by region and contractor.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Lifting and installing roof trussesRequires a mobile crane and several peopleNot recommendedRisk of injury and structural errors€1,800–€4,000No real savings
Applying roofing (EPDM or bitumen)Flat roof, relatively simple techniqueWith experienceSmall chance of errors with bonding layers€800–€2,500€500–€1,200
Installing roof insulationLaying insulation boards on the structureDoableMake sure gaps are properly sealed€400–€1,200€300–€800
Demolishing and removing the old roof structureIncluding arranging a dumpster or trailerWith experienceHave it tested for asbestos first€300–€900€200–€600

Installing a prefab roof structure isn't a do-it-yourself job. The structural elements must be placed exactly according to the factory specifications and building regulations. An installation error can damage the rest of the home and voids the manufacturer's warranty. What you can do yourself is install the roof insulation after a contractor has installed the structure. Small preparatory tasks, such as hauling away demolition waste with a rented trailer, can also reduce the total cost. Based on Google price research.

The full process step by step

1

Measurement and design

A structural engineer or roofing contractor measures the roof area, determines the structural requirements, and draws up a technical design. Based on this, the prefab elements are ordered to size from the manufacturer.

1–2 weeks (including production)

2

Applying for a permit

For new construction or an addition, the building permit is applied for. This can be done online through the Omgevingsloket. Expect a processing time of 8 weeks for the regular procedure.

4–8 weeks

3

Delivery and lifting

The prefab roof trusses and panels are delivered on the agreed day and lifted onto the structure with a mobile crane. The installation crew attaches the elements to the wall plate and the facade structure.

Half a day to 1 day

4

Roofing and insulation

After the structure is installed, the roofing (tiles, EPDM, or bitumen) is applied and the insulation is installed. Connections to gutters and valley rafters are finished watertight.

1–2 days

5

Inspection and handover

The contractor checks the job for watertightness, insulation value, and finish. Once approved, you sign the handover form and receive the warranty documents for the prefab system.

2–4 hours

What can go wrong?A common problem is a poor connection between the prefab structure and the existing wall plate or facade, which causes leaks. Also always check whether the base (walls, foundation beams) can carry the extra load before the order is placed. If in doubt, bring in a structural engineer.

4 smart money-saving tips

Compare at least three quotesPrice differences between roofers for the same work can be as much as 30%. Always request multiple quotes and check what is and isn't included (lifting costs, removal, insulation).
Combine with other roofing workIf you're having a roofer come out anyway, have them replace gutters, install roof windows, or add insulation at the same time. This saves on the trip charge and mobile crane use.
Choose the right roof type for your situationA flat prefab roof is significantly cheaper than a gable or hip roof. Discuss with the contractor whether the roof shape you want is required by the bestemmingsplan (the municipal zoning plan) or whether a cheaper option is also possible.
Schedule outside peak seasonRoofers are busiest in spring and summer. Jobs in fall or winter (as long as it's frost-free) are sometimes offered at a lower price because demand is lower then.

Frequently asked questions

What does a prefab roof cost per m²?

The price per m² is on average between €150 and €400, depending on the roof type, the insulation value, and the roofing material you choose. A flat prefab roof is cheaper per m² than a gable roof or hip roof because of its simpler structure.

What's the difference between a prefab roof and a traditionally built roof?

With a prefab roof, the roof trusses and panels are prefabricated in the factory and cut to size. On site, they only need to be assembled and installed. This saves labor time, improves dimensional accuracy, and significantly shortens construction time compared to a roof built entirely on site.

Do I need a permit for a prefab roof?

For new construction or an addition, a building permit is usually required. Replacing an existing roof without changing the roof shape sometimes doesn't need a permit. Always check the rules with your municipality or through the Omgevingsloket (the Dutch government's online permit portal).

Can I install a prefab roof myself?

Installing a prefab roof structure requires specialized knowledge, tools, and in most cases lifting equipment. For structural safety and the manufacturer's warranty, it's strongly discouraged to do this yourself without professional supervision.

How long does a prefab roof last?

A properly installed and maintained prefab timber-frame roof lasts 40 to 60 years on average. The roofing itself has a shorter lifespan: bitumen or EPDM about 20–30 years, roof tiles 50+ years as long as the substructure is in good condition.

Related jobs

Ready to have your prefab roof installed?

Describe your job and receive quotes from verified contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →