
Cost of installing a PVC or vinyl floor: everything you need to know
A PVC or vinyl floor is durable, water-resistant, and suitable for almost any room, from living room to bathroom. The cost depends mainly on the type of floor (click, glue-down, or sheet vinyl), the laying pattern, and the condition of the subfloor. With a skilled flooring installer, the cost is typically between €45 and €85 per m², including material and labor. With these floors, a flat, dry subfloor is half the work: leveling is often needed as well.
In this article
- ›What does installing a PVC or vinyl floor cost?
- ›Prices by type of floor
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›How does the process work?
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€2,400
complete average project (approx. 40 m²)
average hourly rate
€45
flooring installer hourly rate (€40–50/hour)
turnaround time
1–2 days
excluding leveling drying time
€ Average price by type
| Floor type | Range | Average price |
|---|---|---|
| Sheet vinyl (wall-to-wall)Seamless vinyl floor from the roll, affordable and quick to install | €30 – €55 | €42avg.incl. installation |
| Click PVC (most popular)Loose planks with a click system, floated over an underlayment | €45 – €70 | €57avg.incl. installation |
| Glue-down PVC (dryback)Fully glued planks or tiles, thin and very stable | €55 – €85 | €70avg.incl. installation |
| PVC over radiant floor heatingClick or glue-down PVC with a suitable underlayment and low thermal resistance | €55 – €90 | €72avg.incl. installation |
| PVC herringbone or other patternPattern floor with more cutting, waste, and installation time | €70 – €110 | €90avg.incl. installation |
Prices include material and labor, per m² of installed floor, excluding leveling, removal of the old floor, and baseboard work. Based on Google price research.
Material and labor costs
Flooring installer hourly rate averages €40–€50/hour. Prices may vary by region; always request multiple quotes.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Installing click PVC in a rectangular roomInstalling a floating click floor on a flat, leveled subfloor | DoableVery doable yourself with a miter saw or utility knife, spacers, and patience; start straight and keep an expansion gap all around | €480–€900 | up to €600 |
| Gluing down glue-down PVC (dryback)Fully gluing planks or tiles onto a leveled screed | With experienceThe adhesive has a limited open time and glued pieces are permanent right away; a crooked start can't be corrected | €700–€1,300 | up to €500 |
| Leveling the floor before installationApplying self-leveling compound over the existing screed | With experienceThe right mixing ratio, primer, and working pace are critical; a failed layer has to be sanded out | €400–€800 | up to €350 |
| Installing PVC herringbone or a pattern floorAligning herringbone, chevron, or a tile pattern from the center of the room | Not recommendedThe pattern must be aligned to the millimeter, and waste adds up quickly with mistakes; fixing it often means starting over | €1,100–€2,200 | No recommended savings |
| Removing and disposing of the old floorRemoving laminate, carpet, or old adhesive residue and taking it to the recycling center | DoableMostly demolition and hauling; only with glued-down floors from before 1985, have them checked for asbestos-containing adhesive first | €150–€400 | up to €300 |
Installing click PVC is one of the most rewarding do-it-yourself jobs: with a utility knife or miter saw, spacers, and a straight first row, you can get a long way in a rectangular room. Experience shows, though, that success depends on the subfloor, and leveling and assessing residual moisture in the screed is exactly the work a flooring installer does every day. Glue-down PVC, pattern floors like herringbone, and rooms with many corners, pipe penetrations, or a radiant floor heating system are better left to a professional installer. A contractor also offers a warranty on both the installation and the connection to baseboards and thresholds, and uses professional moisture measurement so the floor doesn't lift later.
The full process step by step
Site visit, moisture measurement, and quote
The flooring installer visits, measures the area, and assesses the subfloor for flatness and residual moisture. Especially with new screeds or radiant floor heating, a moisture measurement is important: a subfloor that's too wet makes adhesive fail and can cause click floors to cup. Based on the visit, you'll receive an itemized quote with the floor type, leveling work, and finishing.
1 hour
Removing the old floor and cleaning the subfloor
The existing floor covering, laminate, or old adhesive residue is removed and hauled away. The subfloor is swept clean and made dust-free, loose parts are repaired, and cracks in the screed are fixed. If the baseboards are going back, they're carefully removed.
2–4 hours
Leveling and drying
A primer is applied to the clean subfloor, and then a self-leveling compound is poured and spread. This layer makes the floor flat enough for the thin PVC or vinyl. The compound needs 12 to 24 hours to dry, depending on the layer thickness and the temperature in the home.
half a day + 12–24 hours drying time
Acclimating the flooring
The packs of PVC or the roll of vinyl sit for 24 to 48 hours at room temperature in the room where they'll be installed. This lets the material adjust to the temperature and humidity, so the floor moves less after installation. With radiant floor heating, the system is set to a low setting a few days in advance.
24–48 hours (no labor)
Installing the PVC or vinyl
With click PVC, the underlayment is rolled out first and the planks are clicked together row by row in a staggered pattern, with an expansion gap along the walls. With glue-down PVC, the adhesive is applied in sections and the planks or tiles are laid and rolled within the adhesive's open time. Sheet vinyl is cut to size, laid out, and finished or glued along the edges.
1–2 days depending on m² and pattern
Finishing baseboards and transitions
New baseboards are installed along the walls, or the existing ones are put back, so the expansion gap is neatly hidden. Transition or expansion profiles go at doors and adjoining floors, and pipe collars are fitted around pipes. In damp rooms, the edges are caulked.
2–4 hours
Handover and maintenance advice
The flooring installer walks through the floor with you to check seams, baseboard connections, and damage, and hauls away cutting waste and packaging. You'll get maintenance advice: a neutral PVC cleaner instead of harsh cleaning products, felt pads under furniture, and, with radiant floor heating, gradually warming up the floor.
1 hour
6 smart money-saving tips
Frequently asked questions
What does installing a PVC or vinyl floor cost on average?
On average €45–€85 per m² for PVC and €30–€55 per m² for sheet vinyl, including material and labor. For a 40 m² living room with click PVC, expect €1,800–€2,800 in total, depending on the quality of the floor and whether leveling is needed.
What's the difference between PVC and vinyl?
PVC consists of loose planks or tiles that are clicked together or glued down, and it's thicker and sturdier. Vinyl comes wall-to-wall from the roll, is more affordable and seamless, but if it's damaged, the whole strip often has to be replaced. With PVC, you simply replace the damaged plank.
Does my floor need to be leveled before PVC is installed?
In most cases, yes. PVC and vinyl are thin floors that show every unevenness: a tile edge or screw head will quickly show through the floor later. Leveling costs €10–€20 per m² and needs 12 to 24 hours of drying time. A good flooring installer measures the flatness during the site visit and includes this in the quote.
Can a PVC floor go over radiant floor heating?
Yes, PVC is actually one of the best floors for radiant floor heating thanks to its low thermal resistance. Do choose an underlayment that's suitable for radiant floor heating, and keep the temperature at the floor surface below about 28 °C. Glue-down PVC conducts heat slightly better than click PVC.
Can I install a PVC floor myself?
Click PVC is very doable for a handy DIYer in a rectangular room, as long as the subfloor is flat. Glue-down PVC is skilled work: the adhesive has a limited open time, and glued planks are permanent right away. Leveling and patterns like herringbone are also better left to a flooring installer.
How long does installing a PVC or vinyl floor take?
Installing 40 m² of click PVC itself usually takes 1 workday; glue-down PVC or a pattern floor more like 2 days. Add leveling (half a day plus 12–24 hours of drying time) and 24–48 hours for the flooring to acclimate. All in all, expect a lead time of 2 to 4 days.
Related jobs
Ready to have your PVC or vinyl floor installed?
Describe your job and receive quotes from verified flooring installers near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes