Cost of a home renovation: everything you need to know
A home renovation covers everything from a light refresh to a complete remodel of the home. The total cost depends on the type of renovation, the size of the home, the condition of the property, and the finish you want. In this overview, you'll find current Dutch prices by renovation type, a breakdown of material and labor costs, and answers to frequently asked questions.
In this article
- ›What does a home renovation cost?
- ›Prices by type of renovation
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›How does a renovation work step by step?
- ›Money-saving tips for your renovation
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€75,000
full renovation of an average home
average hourly rate
€52
contractor hourly rate (€35–70/hour)
turnaround time
4–24 weeks
depending on scope and type
€ Average price by type
| Renovation type | Range | Average price |
|---|---|---|
| Light renovationPainting, new floors, small changes (home stays occupied) | €15,000 – €35,000 | €22,000avg.incl. installation |
| Mid-range renovation (most popular)Kitchen, bathroom, wiring, and insulation renewed (approx. 100 m²) | €50,000 – €100,000 | €75,000avg.incl. installation |
| Major renovationSystems, load-bearing walls, facade, and roof tackled | €90,000 – €150,000 | €115,000avg.incl. installation |
| Complete renovationFull remodel including sustainability upgrades, luxury finish | €130,000 – €220,000 | €165,000avg.incl. installation |
| Renovation to energy label AInsulation, HR++ glass, heat pump, and solar panels | €25,000 – €60,000 | €40,000avg.incl. installation |
Prices are estimates for an average 100 m² home in the Netherlands; luxury finishes and structural changes can raise costs considerably. Based on Google price research.
Material and labor costs
General contractor/builder hourly rate averages €45–70/hour. Specialists such as plumbers and electricians charge €50–80/hour; for a complete renovation, you usually work with several trades.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Painting and wallpaperPainting, wallpapering, or whitewashing interior walls, ceilings, or facades | DoableLittle specialized tooling needed; with good prep (sanding, filling), a solid result is achievable | €2,000–€6,000 | up to €3,500 |
| Laying floorsInstalling laminate, vinyl plank, or floating parquet in living areas | DoableFloating floors are DIY-friendly; leveling a screed or tiling requires much more expertise | €1,500–€5,000 | up to €2,500 |
| Demolition and removalRemoving the kitchen, chipping off tiles, removing floor covering | With experiencePhysically demanding and dusty; watch for asbestos in homes built before 1994: if in doubt, have it tested first | €800–€2,500 | up to €1,500 |
| PlasteringSmoothing walls after demolition or as a final finish | With experienceEven plastering takes a lot of practice; visible unevenness can't be hidden after painting | €3,000–€9,000 | up to €4,000 |
| RewiringReplacing the breaker panel, running new wiring, or adding circuits | Not recommendedRequired by law to be done by a licensed electrician (NEN 1010); mistakes cause fire hazards and rejection when selling the home | €4,000–€12,000 | No legal savings possible |
| Removing load-bearing wallsStructural changes including installing a steel beam | Not recommendedRequires structural calculations by a certified structural engineer and work by a licensed general contractor; risk of collapse without proper support | €2,500–€8,000 | No recommended savings |
In a home renovation, the line between safe DIY and contractor work is crucial. Electrical and gas installations are legally reserved for licensed contractors: an electrician must be NEN 1010 certified (NEN 1010 is the Dutch standard for electrical installations), and a plumber doing gas work must be KIWA certified (KIWA is a Dutch certification body). Structural work such as removing load-bearing walls or installing a steel beam also requires structural calculations and, in many cases, a building permit. Incorrect electrical or structural work can lead to rejection by the insurer or a denied claim when you sell the home or file a damage claim. What does make sense to do yourself: demolition (as long as asbestos has been ruled out), removing old floor covering, painting, and laying floating floors. This saves you €2,000–€6,000 in labor costs without safety risks. Always make sure any work you do yourself is coordinated with the main general contractor, so the schedule and warranty terms stay intact.
The full process step by step
Assessment and budgeting
Map out the condition of the home: what's necessary (leaks, outdated wiring), what's desired (kitchen, bathroom, insulation), and what's optional (luxury finishes). Set a realistic total budget with a contingency of at least 10–15% for unexpected setbacks.
1–2 weeks
Get structural advice and drawings
For renovations that remove load-bearing walls, add an addition, or change the facade, architectural drawings and structural calculations are required. An architect or drafting firm also prepares the documents for the permit application.
2–4 weeks
Apply for a building permit (if applicable)
Apply for the permit with your municipality in good time: expect a legal decision period of 8 weeks. Structural work may not start without a valid permit. Interior jobs such as a new kitchen or bathroom don't require a permit.
6–10 weeks
Request quotes and select a general contractor
Request at least three detailed quotes from licensed general contractors. Besides price, compare the planned start date, materials used, warranty terms, and references from similar renovations. Check their KVK (Netherlands Chamber of Commerce) registration and any memberships in trade associations.
2–4 weeks
Preparation and demolition phase
The general contractor starts by demolishing what needs to go: old floors, tiles, bathroom fixtures, or non-load-bearing walls. For homes built before 1994, have an asbestos survey done first. This phase reveals the true condition of the home and may lead to adjustments to the specifications.
1–3 weeks
Structural work and building systems
The general contractor coordinates the different trades: bricklayer, plumber, electrician, and possibly an insulation contractor work in the right order. Building systems (pipes, wiring) go in before the finishing. Schedule weekly progress meetings and always put change orders in writing.
4–20 weeks
Finishing and handover
After plastering, painting, floors, and bathroom fixtures comes the formal handover. Check all work item by item against the specifications. Note defects on a punch list and agree on a repair period. Pay the remaining amount (usually 5–10%) only after all items are completed.
2–5 weeks
6 smart money-saving tips
Frequently asked questions
What does a home renovation cost on average in the Netherlands?
On average €750 to €1,500 per m². For a 100 m² home, that's €75,000 to €150,000. A light refresh starts around €15,000; a complete renovation can run to more than €200,000.
How long does a full home renovation take?
A light renovation takes 2 to 6 weeks. A major renovation takes 3 to 6 months. The timeline depends on the scope, delivery times, and the availability of general contractors.
Do I need a permit for renovation work?
Interior changes such as painting, new floors, a kitchen, or a bathroom don't require a permit. Structural changes (removing load-bearing walls, building an addition, changing the facade) require a building permit. Always check with your municipality in advance.
Can I get a subsidy for renovating my home?
Yes. The ISDE (a Dutch government subsidy for sustainable energy) applies to insulation and heat pumps. Municipalities sometimes have additional programs. Check RVO (the Netherlands Enterprise Agency, rvo.nl) for an up-to-date overview of available subsidies.
What are the most expensive parts of a home renovation?
Labor costs make up 40–60% of the total budget. Building systems (electrical, heating, water), insulation, and structural changes are the biggest material items. Luxury finishes raise the price considerably.
Can I do part of the renovation myself as the owner?
Painting, wallpapering, and laying floors are things you can do yourself as a DIYer, which saves on labor costs. Gas, electrical, and structural work must always be done by licensed contractors: this is required by law and essential for safety and insurance.
Related jobs
Ready to renovate your home?
Describe your job and receive quotes from verified general contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes