Cost of building a patio: everything you need to know
Building a patio involves excavating the ground, laying a stable base of sand or gravel, and then installing pavers, wood, or composite. The total cost depends on the surface area, your choice of material, and the groundwork that's needed.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€3,200
average for a 20 m² patio
average hourly rate
€45–€65
contractor hourly rate (€45–65/hour)
turnaround time
1–3 days
depending on surface area and material
€ Average price by type
| Patio type | Range | Average price |
|---|---|---|
| Concrete pavers or clay bricksSimple, durable, and widely available | €800 – €2,500 | €1,600avg.incl. installation |
| Natural stone (e.g., bluestone, granite)Luxurious look, very hard-wearing | €2,000 – €6,000 | €3,800avg.incl. installation |
| Composite or hardwood deckWarm, low-maintenance, popular | €1,800 – €5,500 | €3,200avg.incl. installation |
| Porcelain tiles (outdoor)Modern, sleek, frost-resistant | €2,200 – €7,000 | €4,200avg.incl. installation |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Laying concrete pavers or bricksRectangular patio, flat ground | DoableVery doable yourself with good preparation and a level | €400–900 | €500–1,000 |
| Composite deck on joistsFlat ground, no height difference | With experienceFraming and alignment require precision | €800–2,000 | €600–1,200 |
| Outdoor porcelain tiles or bluestoneHeavy material, critical joint width | Not recommendedRisk of breakage and sinking with mistakes in the base | €1,200–3,500 | - |
| Excavating and levelingMore than 10 cm height difference | Not recommendedGroundwork requires proper drainage and compaction | €200–600 | - |
If you're handy, you can build a simple concrete paver or brick patio yourself. You save on labor costs, but expect a weekend of work and the right tools, such as a plate compactor and a level. For outdoor porcelain tiles, bluestone, or a raised deck, we recommend hiring a contractor. Mistakes in the base or drainage lead to sinking and high repair costs. The upside is that a well-built patio lasts for decades.
The full process step by step
Measure and determine the design
Measure the patio area, decide on the desired height, and choose the material. Keep drainage in mind: the patio should slope at least 1–2 cm per meter away from the house.
1–2 hours
Excavate and prepare the ground
The top layer of soil is removed (usually 20–30 cm). Then the ground is compacted and a layer of crushed gravel or a sand bed is added as a stable base.
Half a day
Install the edging
Concrete elements or edging stones are set as a border. This keeps the paving from shifting sideways and gives a neat finish.
1–2 hours
Lay the pavers or deck
Tiles, bricks, or deck boards are placed one by one on the sand bed and set to height. After laying, the joints are filled and everything is pressed down with a plate compactor.
4–8 hours
Jointing, cleaning, and handover
The joints are filled with joint sand or joint mortar. The patio is hosed clean and checked to make sure it's level. Once dry, the patio is ready to use right away.
1–2 hours
4 smart money-saving tips
Frequently asked questions
How much does building a patio cost per m²?
Costs range from €40 per m² for simple concrete pavers to €200 per m² for bluestone or composite. On average, you'll pay €80–120 per m² including labor, sand bed, and edging. For a 20 m² patio, that comes to €1,600–2,400 for a basic version.
What's the best material for a patio?
That depends on your budget and wishes. Concrete pavers and bricks are the cheapest choice and sturdy. Bluestone and outdoor porcelain tiles give a luxurious look and are low-maintenance. Composite and hardwood decks feel warm and are popular for a lounge atmosphere. Composite needs less maintenance than hardwood.
Can I build a patio myself?
A simple patio with concrete pavers is very doable yourself if you have some experience with groundwork and working with a level. For outdoor porcelain tiles, bluestone, or a deck on posts, expert knowledge is recommended, because mistakes in the base later cause sinking or water problems.
Do I need a permit for a patio?
A ground-level patio usually doesn't require a permit. Exceptions are heritage-protected properties or specific zoning plan rules. A raised patio (more than 30 cm) or a patio cover may require a permit. Check with your municipality before you start.
How long does a patio last?
A well-built concrete paver patio lasts 20–30 years. Bluestone and porcelain tiles can last more than 40 years. Composite has a lifespan of 20–25 years. Hardwood decks last 15–25 years if well maintained. The base is decisive: a poorly laid sand bed leads to early sinking.
Related jobs
Ready to have your patio built?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes