Raising a sunken yard prevents flooding, uneven paving, and a yard that sits lower than its surroundings. The cost depends on the surface area, the fill depth, the type of soil, and how accessible the yard is. With an experienced excavation contractor, costs typically range from €20 to €35 per m² for raising it about 30 centimeters, including soil, delivery, and machine work.

In this article

  • ›What does raising a yard or ground level cost?
  • ›Prices by situation
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›How does the process work?
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€1,750

average yard (approx. 60 m², raised 30 cm)

average hourly rate

€50

excavation contractor hourly rate (€45–60/hour)

turnaround time

1–3 days

depending on surface area and accessibility

€ Average price by type

Type of raising jobRangeAverage price
Raising with fill sandStable and affordable base, suitable under paving and lawn€15 – €25€20avg.incl. installation
Raising with sand and topsoil (most popular)Fill sand as a base layer with a fertile top layer for planting€20 – €35€27avg.incl. installation
Raising the ground around the houseFilling in sunken ground along the exterior wall after new construction or settling€25 – €45€35avg.incl. installation
Raising and relaying sunken pavingPaving removed, sand bed raised, and the same pavers laid back€35 – €60€47avg.incl. installation
Large-scale machine earthwork (entire lot)Raising an entire lot or large yard with a loader or excavator, economies of scale€12 – €22€17avg.incl. installation

Prices are per m² at a fill depth of about 30 centimeters, including soil, delivery, and machine work, excluding relaying paving or reseeding. Based on Google price research.

Material and labor costs

Fill sand (per m³, delivered)material
€32€25 – €40
Topsoil or garden soil (per m³, delivered)material
€40€30 – €50
Landscape fabric or weed barrier (per m²)material
€2€1 – €3
Excavation contractor labor (per hour)labor
€52€45 – €60
Mini excavator or loader incl. operator (per day)additional
€475€350 – €600
Removal of excess or contaminated soil (per m³)additional
€25€15 – €35

Excavation contractor hourly rate averages €45–€60/hour. Prices may vary by region and depend on how accessible the yard is; always request multiple quotes.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Raising a small flower bed or vegetable garden boxAdding a few cubic meters of garden soil to a bed or raised boxDoableWith a wheelbarrow, shovel, and a bulk bag of garden soil, this is easy to do yourself€100–€300up to €150
Raising an entire backyard (approx. 30 cm)Clearing the yard, delivering soil, spreading it, and compacting it in layersWith experienceMoving dozens of tons of soil takes machinery and knowledge of compaction; poorly compacted soil sinks again within a few years€1,200–€2,500up to €600
Raising the ground against the exterior wall or around the houseFilling in sunken ground along the exterior wall to the right levelNot recommendedRaising too high against the wall causes rising damp and blocks crawl space ventilation; getting the level right is critical€800–€1,800No recommended savings
Raising and relaying sunken pavingPatio or path removed, sand bed raised, and the same pavers laid backWith experienceLaying paving with a slope so rainwater drains away from the house is harder than it looks€600–€1,500up to €500
Raising around trees and established plantsAdding soil in a yard with mature trees or large shrubsNot recommendedSoil against the base of the trunk suffocates the roots; a landscaper or excavation contractor keeps the area around the trunk clear or applies a loose layer€300–€800No recommended savings

Raising a small flower bed or a few sunken tiles is easy to do yourself with a wheelbarrow, shovel, and plate compactor from the hardware store. Once it's an entire yard, the job changes character: raising a 60 m² yard by 30 centimeters takes about 18 m³ of soil, well over 25 tons of material that needs to be delivered, spread, and compacted in layers. An excavation contractor has a mini excavator or loader, knows the right level relative to the house and the sewer, and knows how to compact soil so the yard doesn't sink again within a few years. Around the exterior wall and near trees, structural and horticultural knowledge comes into play too: raising too high causes moisture problems in the wall and can kill mature trees. A contractor also provides a workmanship warranty.

The full process step by step

1

Site visit, level measurement, and quote

The excavation contractor visits the yard and measures the surface area and the current level relative to the house, the sewer, and the surrounding yards. They assess the soil type, accessibility for machinery, and whether there are cables, pipes, or drains in the ground. Based on this, you receive an itemized quote with the fill depth, soil types, and the number of cubic meters.

1–2 hours

2

Clearing and protecting the yard

Paving, plants, and patio furniture are removed or temporarily set aside. Plants that will go back in are heeled in or kept in pots. Drains, outlets, and outdoor faucets are marked and raised in advance where needed, so they end up at the right level after raising.

0.5–1 day

3

Delivering the soil

The fill sand and topsoil are delivered by truck or crane truck. With an easily accessible yard, the soil is dumped right where it's needed; with a narrow passage, the work is done with a mini excavator, conveyor belt, or wheelbarrows, which takes more time and labor costs.

2–4 hours

4

Spreading the soil and compacting it in layers

The soil is spread by machine and applied in layers of 20 to 30 centimeters. Each layer is compacted with a plate compactor or roller before the next layer goes on. This prevents the yard from settling significantly in the first few years. Around trees, the base of the trunk is kept clear or a loose layer is applied.

0.5–1 day

5

Applying and leveling the topsoil layer

A top layer of 20 to 30 centimeters of topsoil, where grass and plants can take root, goes on top of the compacted sand. The excavation contractor finishes the yard at the right level, with a slight slope away from the house so rainwater drains properly.

2–4 hours

6

Relaying paving, seeding, or replanting

Finally, the paving is relaid, the lawn is seeded or sod is laid, and the stored plants are put back. This can be done by the same excavation contractor or by a landscaper or paver, depending on what's agreed in the quote.

0.5–1 day

7

Final walkthrough and settling advice

The excavation contractor walks through the yard with you and checks the level, slope, and connection to drains and outlets. You'll get advice on settling: even well-compacted soil still settles a few centimeters in the first year, so ideally wait a few months before placing permanent features such as a fence on new soil.

1 hour

What can go wrong when raising a yard?The most common mistake is not compacting the soil in layers, or not enough: the yard then visibly settles within one to two years and much of the work has to be redone. Other pitfalls: raising too high against the exterior wall, so moisture is drawn into the wall and the crawl space ventilation is blocked; getting the slope wrong, so rainwater flows toward the house or the neighbors; forgetting to raise drains and outlets, so they end up inaccessible under the soil after raising; and dumping soil against the base of tree trunks, which suffocates the roots. Finally, always check that delivered soil comes with a clean soil certificate: removing contaminated soil costs many times what you save on the purchase.

6 smart money-saving tips

Use fill sand as the base and topsoil only as the top layerFill sand costs €25–€40 per m³, topsoil €30–€50. By using topsoil only for the top 20 to 30 centimeters, you save significantly on soil costs, while grass and plants won't notice a thing.
Clear the yard yourself before the excavation contractor arrivesRemoving paving, digging up plants, and clearing away patio furniture is unskilled work you save at the hourly rate of €45–€60. An empty, easily accessible yard can easily save half a day to a full day of labor.
Combine the soil delivery with your neighborsIn neighborhoods prone to settling, neighbors often have the same job. One truckload of soil and one machine for several yards at once saves on transport costs and trip charges: the difference can add up to hundreds of euros per yard.
Ask a soil bank about cheap or free soilSoil banks and large construction projects nearby regularly have clean soil available that's offered cheaply or even for free. Always ask for a clean soil certificate or test report, so you don't end up with contaminated soil in your yard.
Schedule the job in the off-seasonExcavation contractors and landscapers are busiest in spring. In late fall or winter, there's often more room in their schedules and sharper prices are possible, and dry, frosty days are well suited to earthwork.
Request three quotes and compare exactly what's includedPrice differences for the same raising job regularly reach 20–30%. Compare not just the final price but also the number of cubic meters of soil, the soil type, compaction per layer, and whether relaying paving or reseeding is included: always request multiple quotes.

Frequently asked questions

What does raising a yard cost on average?

On average €20–€35 per m² for raising it about 30 centimeters, including soil, delivery, and machine work. For an average backyard of 60 m², expect €1,200–€2,100 in total, depending on the fill depth and accessibility.

How often do I need to raise my yard?

On peat and clay soil, a yard sinks an average of 1 to 2 centimeters per year; raising it is needed every 10 to 20 years there. On sandy soil, the ground hardly settles. If you live in a newly built neighborhood on hydraulically filled land, the yard often sinks extra fast in the first few years.

What soil do you use to raise a yard?

Usually a combination: fill sand as a firm, easily compacted base layer, topped with 20 to 30 centimeters of topsoil where grass and plants can take root. Sand alone is cheaper but too poor for planting; topsoil alone settles too much.

Do I need a permit to raise my yard?

Raising an ordinary backyard usually doesn't require a permit. If large height differences are involved, you're raising near a ditch or dike, or the drainage toward the neighbors changes, check with your municipality or the waterschap (the regional water authority). An excavation contractor can look into this for you in advance.

Can I raise my yard myself?

Raising a small flower bed or vegetable garden box is easy to do yourself. For an entire yard, you're quickly talking about 15 to 25 m³ of soil: dozens of tons of material that need to be delivered by machine, spread, and compacted in layers. Without proper compaction, the yard will sink again within a few years.

What happens to my paving and plants when the yard is raised?

Paving is removed and relaid after raising; relaying with the same pavers costs about €15–€25 per m² extra. Plants are temporarily dug up and replanted where possible. Be careful with trees: the base of the trunk shouldn't simply disappear under the soil, or the roots will die.

Related jobs

Ready to have your yard or ground level raised?

Describe your job and receive quotes from verified excavation contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →