Skip to main content

Are you a contractor? Sign up for free

Contractor working on a kitchen or living room addition in a Dutch home
9 min readPrices verifiedRemodeling & Renovation

Cost of a kitchen or living room addition: everything you need to know

A kitchen or living room addition gives you more living space right away and increases your home's value. The cost depends heavily on the size you want, the type of roof, the level of finish, and whether you need a permit. In this overview, you'll find current prices based on Google price research.

In this article

  • ›What does an addition cost on average?
  • ›Prices by type of addition
  • ›Material and labor costs
  • ›Hiring a contractor vs. doing it yourself
  • ›How does the construction process work?
  • ›Money-saving tips for your addition
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€22,000

average 10 m² addition, shell + standard finish

average hourly rate

€55

general contractor hourly rate (€45–70/hour)

turnaround time

4–10 weeks

depending on scope and permit

€ Average price by type

Addition typeRangeAverage price
Small shell addition (approx. 6 m²)2.5 x 2.5 m, flat roof, brick walls, no finishing€7,000 – €12,000€9,500avg.incl. installation
Standard 10 m² addition (most popular)Shell + plastering, floor, electrical, and insulation included€18,000 – €26,000€22,000avg.incl. installation
Fully finished 15 m² additionIncluding skylight, French doors, and radiant floor heating€28,000 – €40,000€34,000avg.incl. installation
Luxury addition with sunroom or glass roofLarge glass areas, premium finish, climate control system€40,000 – €65,000€52,000avg.incl. installation

Prices are estimates based on Google price research and apply to an average Dutch row house; demolition, foundation reinforcement, and custom work can increase costs. Based on Google price research.

Material and labor costs

Foundation and floor slabmaterial
€2,500€1,500 – €4,000
Walls (brick or timber frame)material
€3,200€2,000 – €5,000
Roof (flat or gable)material
€2,800€1,500 – €4,500
Insulation (floor, roof, walls)material
€1,500€800 – €2,500
General contractor labor (80–150 hours)labor
€6,500€3,600 – €10,500
Permit and feesadditional
€750€500 – €1,200
Electrical, plumbing, and finishingadditional
€2,500€1,500 – €4,000

General contractor hourly rate averages €45–70/hour. Specialized subcontractors (electrician, plumber) are usually hired separately and aren't always included in the general contractor's price.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Digging the foundation and pouring the floor slabExcavation, setting formwork, and pouring concrete for the addition's floor slabNot recommendedAn improper foundation causes settling and cracking in the structure; repairs cost more than the original job€1,500 – €4,000No recommended savings
Walls and roof structureBuilding masonry or timber frame walls plus roof construction with insulation and roofingNot recommendedRequires structural calculations and, for additions that need a permit, approval by a licensed structural engineer; mistakes lead to rejection by the municipality€3,500 – €9,500No recommended savings
Rerouting electrical and plumbingAdding circuits, installing outlets and lighting, and connecting radiant floor heating if neededNot recommendedElectrical work in an addition falls under NEN 1010; only a licensed electrical company can issue the inspection report your insurer requires€800 – €2,500No legal savings possible
Plastering and finishing wallsPlastering the new walls and ceiling of the additionWith experienceLabor-intensive and hard to correct; we recommend beginners hire a plasterer for visible surfaces€800 – €2,000up to €1,500
Flooring and paintingInstalling finished flooring (laminate, vinyl, or tile) and painting walls, ceiling, and framesDoableLaminate and vinyl are relatively easy to install yourself; painting is easy to prepare for with the right primer and paint roller€700 – €2,500up to €1,800

The structural core of an addition (foundation, walls, roof construction, and all installations) must always be handled by licensed contractors. Mistakes in the load-bearing structure aren't just costly to fix; they can also be dangerous and lead to rejection by the municipality. Electrical work in a new addition must also be inspected by a licensed electrical company; without that inspection report, your insurer may refuse to pay out if there's damage. The finishing phase does leave room for doing it yourself. Laying a laminate or vinyl floor, painting, and installing baseboards are tasks where a handy DIYer can save thousands of euros. Plastering is doable with experience, but ask a plasterer for a quote for visible surfaces: an uneven plastered surface is hard to hide afterward.

The full process step by step

1

Permit check and getting quotes

The contractor (or you) checks with the municipality whether the addition is permit-free or requires a building permit. To be permit-free, the addition can be at most 4 meters deep and must meet height limits. If needed, have structural drawings and stability calculations made. Request quotes from at least three contractors to compare prices and approaches.

1–4 weeks

2

Demolition and excavation

The contractor breaks an opening in the rear wall and removes the existing foundation or paving. Next, the ground is excavated for the new floor slab. In older homes, foundation reinforcement or rerouting cables and pipes may be needed; this is investigated and resolved in this phase.

2–5 days

3

Foundation and pouring the floor slab

The strip footing or pier foundation is installed and the formwork for the concrete floor slab is set. After the concrete is poured, it needs at least several days to cure before construction can continue. If you're installing radiant floor heating, the tubing is embedded in the floor in this phase.

3–5 days (excl. curing)

4

Walls, roof structure, and insulation

The new walls go up in masonry or as a timber frame. Then the roof structure is installed: for a flat roof, with roof panels and EPDM or bitumen roofing; for a gable roof, with purlins and roof tiles. Insulation of the floor, walls, and roof is added in this phase in line with current energy performance requirements.

1–2 weeks

5

Installations: electrical and plumbing

A licensed electrician expands the breaker panel and runs new circuits for outlets, lighting, and any appliances. The plumber installs hot and cold water lines if the kitchen is being expanded. With radiant floor heating, it's connected to the central heating boiler or heat pump. Once finished, the electrical company issues an inspection certificate.

2–4 days

6

Finishing and handover

Plastering of new walls and ceiling, followed by installing frames, doors, and any French doors to the backyard or a skylight. The floor is finished and the painting is done. At the final handover, the contractor walks through the punch list with you and remaining items are resolved.

1–2 weeks

What can go wrong?The most common pitfalls with an addition are: a budget that's too tight, with no reserve for unexpected demolition, foundation problems, or hidden pipes (plan a 10–15% buffer). Many people who own their home also underestimate how long a permit takes: municipalities take up to 8 weeks for a building permit, which can shift your whole schedule. Another pitfall is poor coordination between the general contractor and the electricians and plumbers: if electrical and plumbing aren't ready on time, walls get closed up before connections are made. Finally, some customers forget to include connecting the new space to the existing ventilation or central heating in the job, leaving the addition uncomfortably cold or poorly ventilated in winter.

6 smart money-saving tips

Choose a shell addition and do the finishing yourselfHave the general contractor stop after the shell phase (foundation, walls, roof, insulation, and rough-in connections) and do the floor, plastering, and painting yourself or at your own pace. This usually saves €3,000 to €8,000 on the total contractor price.
Carefully check whether you're permit-exemptA rear addition up to 4 meters deep is permit-free in many situations under the Besluit bouwwerken leefomgeving (Dutch building regulations decree). Check this through the omgevingsloket (the Dutch online permit portal) or with the municipality before you apply for a building permit. That saves you €500 to €1,200 in fees and weeks of waiting.
Choose a flat roof instead of a gable roofA flat roof is €1,500 to €3,500 cheaper than a gable roof of the same size and has a simpler structure with fewer labor hours. Do plan periodic maintenance after 15–20 years and make sure drainage is good; a poor slope is the most common cause of leaks.
Compare at least three detailed quotesPrice differences of 20–30% between contractors for exactly the same work are very normal for additions. Always ask for an itemized quote with separate line items (foundation, walls, roof, finishing) so you can compare quotes fairly and negotiate effectively.
Combine the addition with other planned renovationsHave the electrician upgrade the breaker panel at the same time, or have the plumber take on the bathroom. Contractors and subcontractors charge less in mobilization costs when they can combine several jobs in one visit, saving hundreds of euros per item.
Schedule construction in the fall or winterContractors usually have full schedules in spring and early summer, with waits of several months. Start your build in September or later and you can begin sooner, and sometimes negotiate a better price because demand is lower.

Frequently asked questions

What does a kitchen or living room addition cost on average?

On average, you'll pay €22,000 for a standard 10 m² addition including plastering, floor, and electrical. The range runs from €7,500 for a small shell addition to €65,000 for a luxury version with a glass roof.

What does an addition cost per m²?

Expect €1,400 to €2,500 per m², depending on the level of finish and the type of construction. A shell addition is cheaper; fully finished with radiant floor heating and premium windows costs more.

How long does it take to build an addition?

The construction itself takes 2 to 4 weeks. Including preparation, any permit process, and finishing, you should plan for a total timeline of 4 to 10 weeks.

Do I need a permit for an addition?

An addition up to 4 meters deep is permit-free in many situations, provided it meets the conditions of the Besluit omgevingsrecht (Dutch environmental law decree). Always check with the municipality. A building permit costs an average of €500 to €1,200 in fees.

Can I do anything myself to save costs?

Yes. You can do the painting, the tiling, or the laminate flooring yourself. Always have the structural work (foundation, walls, roof, electrical, and plumbing) done by licensed contractors.

Does an addition increase home value?

Yes, an addition increases home value on average, especially in urban areas. How much depends on the quality of the work, the location, and the housing market. A well-built 10 m² addition can increase home value by €20,000 to €40,000.

Related jobs

Ready to have your addition built?

Describe your job and get quotes from verified general contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →