Cost of installing or moving lighting: everything you need to know
Installing new lighting or moving an existing light fixture point instantly changes the look of a home. The cost depends on the type of lighting, the number of fixture points, and whether new wiring is needed. A certified electrician makes sure the connection is safe and passes inspection.
In this article
- ›What does installing or moving lighting cost?
- ›Prices by type of lighting job
- ›What determines the price?
- ›Hiring a contractor vs. doing it yourself
- ›Step by step: how does the job work?
- ›Money-saving tips for lighting
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€350
installation including materials per room
average hourly rate
€55
contractor hourly rate (€45–70/hour)
turnaround time
1–2 days
depending on scope
€ Average price by type
| Lighting job type | Range | Average price |
|---|---|---|
| Hanging a single lightone pendant, wall light, or ceiling light on an existing connection point | €60 – €150 | €100avg.incl. installation |
| Moving a light pointexisting connection point to another spot; extending cable or wall chasing | €100 – €250 | €175avg.incl. installation |
| Installing recessed spotlights (most popular)4 to 6 LED recessed spotlights including wiring and switch | €250 – €600 | €400avg.incl. installation |
| Complete room lighting installationnew circuit, multiple light points, and switch in one room | €400 – €900 | €600avg.incl. installation |
| LED strip or indirect lightingbuilt into alcoves, cabinets, or crown molding including dimmer | €200 – €700 | €400avg.incl. installation |
| Installing outdoor lightingwall lights or yard spotlights including weatherproof wiring and switch | €150 – €500 | €300avg.incl. installation |
Prices are estimates including standard materials and labor; wall chasing, extra wiring, or special fixtures are quoted separately. Based on Google price research.
Material and labor costs
Electrician hourly rate averages €50–€70/hour. A trip charge (€25–€75) is often billed separately for small jobs.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Replacing an existing light or fixtureRemoving the old fixture and connecting a new one to the same connection point | DoableTurn off the power at the breaker panel and check the socket; no new wiring or cable routes needed | €0 (yourself) vs. €75–€150 (electrician) | up to €150 |
| Connecting a recessed spotlight in an existing cutoutClicking a spotlight into a precut hole and connecting it to an existing point via a plug system | With experienceOnly with a plug-and-play connector; wiring junction boxes yourself requires expertise and increases fire risk | €15–€40 per spotlight (yourself) vs. €50–€100 per spotlight (electrician) | up to €60 per spotlight |
| Moving a light point to another positionRemoving the connection point and creating a new one in the ceiling or wall | Not recommendedRequires running new wiring; legally reserved for a licensed electrician and required by insurers in case of damage | €100–€250 (electrician) | No recommended savings |
| Installing multiple recessed spotlights including wiringRunning new cable routes, connecting spotlights to a switch, and connecting to the breaker panel | Not recommendedWork on circuits and new wiring is legally reserved for a licensed electrician; risk of short circuits and fire damage | €250–€600 (electrician) | No legal savings possible |
| Installing LED strip or indirect lightingMounting a strip in an alcove or crown molding and connecting it to an existing outlet or dimmer | Doable12V or 24V LED strips with an adapter are safe to install yourself; a built-in dimmer requires an electrician | €50–€150 materials (yourself) vs. €200–€500 (electrician including dimmer) | up to €350 |
For installing or moving lighting, there's a clear line: anything involving new wiring, new cable routes, or connections to the breaker panel is legally reserved for a licensed electrician (NEN 1010). Insurers deny damage claims if unauthorized people worked on the fixed installation. In practice, this means moving a light point, adding a new lighting circuit, or installing recessed spotlights with their own wiring must always be done by a contractor. What you can do yourself: replace an existing fixture on the same connection point (switching off the circuit breaker is enough), and mount LED strips that run on an adapter plugged into an outlet in an alcove or molding. Unsure about anything in between? Have an electrician assess it. The extra cost easily outweighs the risks of unsafe installations or ones that won't pass inspection.
The full process step by step
On-site inspection and quote
The electrician assesses on site how many light points are needed, whether the existing wiring is usable, and the condition of the breaker panel. They measure the distances for cable routes and determine whether wall chasing or routing through the cavity wall is needed. Based on this, they prepare an itemized quote with labor, materials, and any wall chasing.
30–60 min
Preparing materials and fixtures
The electrician and the customer agree on which fixtures, spotlights, switches, and dimmers will be used. If the customer buys fixtures themselves (see money-saving tips), the specifications are checked for socket, wattage, and dimensions. Wiring, junction boxes, and tools are scheduled.
1–2 days (material delivery)
Creating cable routes and running wiring
If needed, channels are cut for new cable channels, or wiring is run through the wall cavity, the crawl space, or existing channels. The electrician finishes the cable routes neatly with cable channels or filler. This is the most time-consuming part when moving light points.
1–4 hours depending on scope
Mounting and connecting fixtures
Recessed spotlight holes are cut and the spotlights placed, pendants hung, and wall or ceiling lights mounted. All connections are made in junction boxes; switches, dimmers, and any timers are connected to the correct circuit in the breaker panel.
1–3 hours
Testing, measuring, and handover
The electrician turns the power on and tests each light point individually. They check the circuit load in the breaker panel and measure whether the residual current device (RCD), the European counterpart of a GFCI, works correctly. Any dimmer settings are adjusted, and the customer gets an explanation of operation and maintenance.
15–30 min
6 smart money-saving tips
Frequently asked questions
What does installing lighting cost on average?
On average €150 to €500 per room including materials and labor. Hanging a single light costs €75 to €150; a full installation with multiple spotlights can run €500 to €900.
What does moving a light point cost?
On average €100 to €250 per light point, depending on how far it moves and whether wall chasing is needed for new cable routes.
How long does installing lighting take?
An electrician hangs a single light in 30 to 60 minutes. A complete lighting installation for one room takes 2 to 6 hours; larger jobs across multiple rooms take 1 to 2 days.
Do I need a permit?
Standard indoor lighting doesn't require a permit. Major changes to the electrical system may require a NEN 1010 (the Dutch standard for electrical installations) inspection; your electrician will let you know.
Can I install lighting myself?
You can replace a light on the same connection point yourself (turn off the power first). Running new wiring or moving light points must be done by a licensed electrician; most insurers require this too.
What does having recessed spotlights installed cost?
On average €50 to €100 per spotlight including installation and materials. A set of 6 spotlights in one room usually costs €300 to €600 in total.
Related jobs
Ready to have your lighting installed or moved?
Describe your job and receive quotes from verified electricians near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes