Cost of installing or moving lighting: everything you need to know

Installing new lighting or moving an existing light fixture point instantly changes the look of a home. The cost depends on the type of lighting, the number of fixture points, and whether new wiring is needed. A certified electrician makes sure the connection is safe and passes inspection.

In this article

  • ›What does installing or moving lighting cost?
  • ›Prices by type of lighting job
  • ›What determines the price?
  • ›Hiring a contractor vs. doing it yourself
  • ›Step by step: how does the job work?
  • ›Money-saving tips for lighting
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€350

installation including materials per room

average hourly rate

€55

contractor hourly rate (€45–70/hour)

turnaround time

1–2 days

depending on scope

€ Average price by type

Lighting job typeRangeAverage price
Hanging a single lightone pendant, wall light, or ceiling light on an existing connection point€60 – €150€100avg.incl. installation
Moving a light pointexisting connection point to another spot; extending cable or wall chasing€100 – €250€175avg.incl. installation
Installing recessed spotlights (most popular)4 to 6 LED recessed spotlights including wiring and switch€250 – €600€400avg.incl. installation
Complete room lighting installationnew circuit, multiple light points, and switch in one room€400 – €900€600avg.incl. installation
LED strip or indirect lightingbuilt into alcoves, cabinets, or crown molding including dimmer€200 – €700€400avg.incl. installation
Installing outdoor lightingwall lights or yard spotlights including weatherproof wiring and switch€150 – €500€300avg.incl. installation

Prices are estimates including standard materials and labor; wall chasing, extra wiring, or special fixtures are quoted separately. Based on Google price research.

Material and labor costs

LED recessed spotlights (each)material
€25€10 – €50
Wiring, conduit, and junction boxesmaterial
€60€30 – €120
Switch or dimmermaterial
€30€15 – €60
Installation and mounting (2–4 hours)labor
€180€90 – €280
Wall chasing or concealing cablesadditional
€80€40 – €150
Electrician trip chargeadditional
€45€25 – €75

Electrician hourly rate averages €50–€70/hour. A trip charge (€25–€75) is often billed separately for small jobs.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Replacing an existing light or fixtureRemoving the old fixture and connecting a new one to the same connection pointDoableTurn off the power at the breaker panel and check the socket; no new wiring or cable routes needed€0 (yourself) vs. €75–€150 (electrician)up to €150
Connecting a recessed spotlight in an existing cutoutClicking a spotlight into a precut hole and connecting it to an existing point via a plug systemWith experienceOnly with a plug-and-play connector; wiring junction boxes yourself requires expertise and increases fire risk€15–€40 per spotlight (yourself) vs. €50–€100 per spotlight (electrician)up to €60 per spotlight
Moving a light point to another positionRemoving the connection point and creating a new one in the ceiling or wallNot recommendedRequires running new wiring; legally reserved for a licensed electrician and required by insurers in case of damage€100–€250 (electrician)No recommended savings
Installing multiple recessed spotlights including wiringRunning new cable routes, connecting spotlights to a switch, and connecting to the breaker panelNot recommendedWork on circuits and new wiring is legally reserved for a licensed electrician; risk of short circuits and fire damage€250–€600 (electrician)No legal savings possible
Installing LED strip or indirect lightingMounting a strip in an alcove or crown molding and connecting it to an existing outlet or dimmerDoable12V or 24V LED strips with an adapter are safe to install yourself; a built-in dimmer requires an electrician€50–€150 materials (yourself) vs. €200–€500 (electrician including dimmer)up to €350

For installing or moving lighting, there's a clear line: anything involving new wiring, new cable routes, or connections to the breaker panel is legally reserved for a licensed electrician (NEN 1010). Insurers deny damage claims if unauthorized people worked on the fixed installation. In practice, this means moving a light point, adding a new lighting circuit, or installing recessed spotlights with their own wiring must always be done by a contractor. What you can do yourself: replace an existing fixture on the same connection point (switching off the circuit breaker is enough), and mount LED strips that run on an adapter plugged into an outlet in an alcove or molding. Unsure about anything in between? Have an electrician assess it. The extra cost easily outweighs the risks of unsafe installations or ones that won't pass inspection.

The full process step by step

1

On-site inspection and quote

The electrician assesses on site how many light points are needed, whether the existing wiring is usable, and the condition of the breaker panel. They measure the distances for cable routes and determine whether wall chasing or routing through the cavity wall is needed. Based on this, they prepare an itemized quote with labor, materials, and any wall chasing.

30–60 min

2

Preparing materials and fixtures

The electrician and the customer agree on which fixtures, spotlights, switches, and dimmers will be used. If the customer buys fixtures themselves (see money-saving tips), the specifications are checked for socket, wattage, and dimensions. Wiring, junction boxes, and tools are scheduled.

1–2 days (material delivery)

3

Creating cable routes and running wiring

If needed, channels are cut for new cable channels, or wiring is run through the wall cavity, the crawl space, or existing channels. The electrician finishes the cable routes neatly with cable channels or filler. This is the most time-consuming part when moving light points.

1–4 hours depending on scope

4

Mounting and connecting fixtures

Recessed spotlight holes are cut and the spotlights placed, pendants hung, and wall or ceiling lights mounted. All connections are made in junction boxes; switches, dimmers, and any timers are connected to the correct circuit in the breaker panel.

1–3 hours

5

Testing, measuring, and handover

The electrician turns the power on and tests each light point individually. They check the circuit load in the breaker panel and measure whether the residual current device (RCD), the European counterpart of a GFCI, works correctly. Any dimmer settings are adjusted, and the customer gets an explanation of operation and maintenance.

15–30 min

What can go wrong?Common pitfalls with lighting installations: wiring that doesn't meet NEN 1010, so the installation fails inspection when selling the home or filing an insurance claim; fixtures that are too heavy for the ceiling (plaster ceilings hold a maximum of 3–5 kg); a circuit that gets overloaded because too many spotlights are connected to one RCD circuit; wall chasing that unexpectedly hits structural beams, pipes, or existing wiring; and junction box connections that aren't fully sealed, so moisture later causes a short circuit. Always ask for an itemized quote that explicitly includes wall chasing, finishing, and checking the breaker panel.

6 smart money-saving tips

Combine multiple light points in one visitAn electrician charges a trip charge (€25–€75) per visit, regardless of the size of the job. Combine installing spotlights, moving a connection point, and any extra switches in one job. This saves you one or two extra trips and can save €50–€150.
Buy the fixtures yourselfElectricians usually add a 10–20% markup on fixtures and spotlights they purchase. By buying lights, pendants, or recessed spotlights yourself at a home improvement store or online, you can easily save €30–€100 on an average lighting job. Share the exact specifications (socket, cutout diameter, depth) with the electrician in advance.
Choose recessed spotlights with a standard GU10 socketSpotlights with a GU10 socket are universal and can be swapped by anyone without an electrician when replacing a bulb or changing dimmers. Avoid proprietary systems (fixed LED modules from one brand) where even a simple bulb change requires a contractor's help.
Limit wall chasing by routing through the cavity wallWall chasing for cable channels costs €40–€150, and repair work (plastering, painting) is often billed on top. Ask the electrician whether the wiring can be run through the wall cavity, an existing cable channel, or the crawl space. This saves chasing costs and the related finishing costs.
Compare at least three quotesHourly rates for lighting work range from €45 to €70. On a four-hour job, that's already a €100 difference. Request quotes from three certified electricians and check whether wall chasing, finishing costs, and the trip charge are included: that makes the comparison fair.
Negotiate a day rate for larger jobsIf you're installing lighting in multiple rooms at once (for example, during a renovation or a new interior), ask for a day rate (usually €400–€550) instead of an hourly rate. For an eight-hour workday, this saves you €50–€110 compared with separate hourly rates.

Frequently asked questions

What does installing lighting cost on average?

On average €150 to €500 per room including materials and labor. Hanging a single light costs €75 to €150; a full installation with multiple spotlights can run €500 to €900.

What does moving a light point cost?

On average €100 to €250 per light point, depending on how far it moves and whether wall chasing is needed for new cable routes.

How long does installing lighting take?

An electrician hangs a single light in 30 to 60 minutes. A complete lighting installation for one room takes 2 to 6 hours; larger jobs across multiple rooms take 1 to 2 days.

Do I need a permit?

Standard indoor lighting doesn't require a permit. Major changes to the electrical system may require a NEN 1010 (the Dutch standard for electrical installations) inspection; your electrician will let you know.

Can I install lighting myself?

You can replace a light on the same connection point yourself (turn off the power first). Running new wiring or moving light points must be done by a licensed electrician; most insurers require this too.

What does having recessed spotlights installed cost?

On average €50 to €100 per spotlight including installation and materials. A set of 6 spotlights in one room usually costs €300 to €600 in total.

Related jobs

Ready to have your lighting installed or moved?

Describe your job and receive quotes from verified electricians near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →