Cost of floor leveling: everything you need to know
Leveling a floor is necessary before you install new floor covering, tile, or hardwood. The cost depends on the type of subfloor, the size of the room, and the thickness of the leveling layer. On this page, you'll find current prices per square meter, an overview of material and labor costs, and answers to frequently asked questions.
In this article
- ›What does floor leveling cost?
- ›Prices by type of subfloor
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›How does floor leveling work?
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€650
average for a 25 m² room
average hourly rate
€45
contractor hourly rate (€40–55/hour)
turnaround time
1–2 days
depending on area and drying
€ Average price by type
| Leveling type | Range | Average price |
|---|---|---|
| Leveling a concrete floorthin layer of self-leveling compound on an existing concrete floor, up to 5 mm | €200 – €550 | €375avg.incl. labor |
| Standard leveling (most chosen)leveling compound on a concrete subfloor, 20–30 m² room, including primer | €450 – €850 | €650avg.incl. labor |
| Leveling a wood subfloorflexible leveling mortar on a wood floor, extra preparation | €700 – €1,800 | €1,250avg.incl. labor |
| Pourable screed (anhydrite)thick leveling layer of 10–50 mm, suitable for radiant floor heating | €900 – €2,200 | €1,550avg.incl. installation |
| Leveling an entire floor of a homemultiple rooms, approx. 60–80 m², including primer and travel costs | €1,400 – €3,500 | €2,450avg.incl. labor |
Prices include primer and labor for a room of about 25 m²; wood subfloors require flexible mortar and cost more. Based on Google price research.
Material and labor costs
Carpenter / flooring installer hourly rate averages €40–55/hour. Drying time of the leveling layer (24–48 hours) isn't included in the labor time.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Leveling small unevenness on a concrete floorheight difference of up to 3 mm, flat and clean surface | DoableSelf-leveling compound is easy to find at home improvement stores and relatively easy to apply | €80–€180 | up to €220 |
| Leveling a standard concrete floor (20–30 m² room)including applying primer, height difference up to 5 mm | With experienceThe right mixing ratio, waiting for the primer, and using a spiked roller are crucial; mistakes lead to cracks | €150–€300 | up to €350 |
| Repairing cracks and pits before levelingfilling small cracks and holes with repair mortar | DoableRepair mortar from a home improvement store works well for small defects; it saves the contractor prep time | €10–€30 | up to €80 |
| Leveling a wood subfloorflexible leveling mortar on a moving wood substrate | Not recommendedRegular leveling compound doesn't bond to wood and cracks as the boards move: extra repair costs are high | €700–€1,800 | No recommended savings |
| Applying pourable screed (anhydrite) for radiant floor heatingthick layer of 10–50 mm, requires special mixing and pumping equipment | Not recommendedAnhydrite requires professional pumping equipment and a controlled drying process; incorrect application damages the heating system | €900–€2,200 | No recommended savings |
For small unevenness on a flat, dry concrete floor, leveling it yourself is quite doable with a self-leveling product from a home improvement store. Prepare the surface carefully: clean it thoroughly, fill small cracks with repair mortar, and always apply a primer first. Never skip this step, because without primer the subfloor draws the water out of the mortar too quickly and cracks form. As soon as the height difference is more than 5 mm, the subfloor is wood, or radiant floor heating is involved, a contractor is essential. Wood floors move and require a special flexible mortar; pourable screed for radiant floor heating requires professional pumping equipment and a precise drying protocol. A mistake in these applications quickly leads to the layer coming loose, damage to the heating system, or a costly repair job. That isn't worth saving a day of contractor's wages.
The full process step by step
Inspection and flatness measurement
The contractor goes over the entire room with a level (or laser level) and maps out the height differences. Loose or damaged parts of the subfloor are scratched and marked for repair. Based on the measurement, the contractor determines which type of leveling product and which layer thickness are needed.
30–60 min
Cleaning and repairing the subfloor
Dust, grease, loose material, and remnants of old floor covering are completely removed: a clean surface is a prerequisite for good adhesion. Cracks and pits are filled with fast-setting repair mortar and smoothed flat so the leveling layer is the same thickness everywhere.
30–90 min
Applying the primer and letting it dry
The bonding primer is applied fully and evenly to the subfloor with a roller or brush. The primer seals the pores and makes sure the leveling mortar doesn't lose moisture too quickly. After applying it, the contractor waits for the required drying time: usually 30 to 60 minutes, depending on the product and the absorbency of the surface.
15 min to apply + 30–60 min to dry
Mixing the leveling compound
The leveling powder is mixed with water in the ratio specified by the manufacturer, usually with an electric drill mixer at low speed. A mix that's too thin or too thick affects the strength and the self-leveling properties. For large areas, the work is sometimes done in multiple batches to prevent drying out.
15–30 min
Pouring, spreading, and removing air
The leveling compound is poured onto the floor and spreads out through its self-leveling action. The contractor helps move the compound along with a squeegee or smoothing trowel and works systematically from the back of the room toward the door. Right after that, a spiked roller is rolled through the compound to remove trapped air bubbles, which would otherwise cause weak spots.
1–2 hours
Drying and curing
After pouring, no one may walk in the room, and drafts and large temperature swings must be avoided. Standard leveling compound can be walked on after 24–48 hours; pourable screed (anhydrite) takes 3–7 days or longer depending on the layer thickness. Radiant floor heating may only be turned on weeks later, following the manufacturer's drying protocol.
24–48 hours (standard compound) or 3–7 days (pourable screed)
Flatness check and completion
Once the floor has fully cured, the contractor checks it for flatness again with the level. Any high edges or small imperfections are ground down. Only when the floor is within tolerance (usually a maximum of 2 mm per 2 meters) is the job considered finished, and the finished floor or floor covering can be installed.
30–45 min
6 smart money-saving tips
Frequently asked questions
What does floor leveling cost on average?
On average, you pay €10–€30 per m². For a 25 m² room, that comes to €250–€750 for materials plus labor. Wood subfloors are more expensive: €45–€75 per m².
How long does it take to level a floor?
Applying the compound takes half a day to a full day for an average room. Drying time is 24–48 hours for standard leveling compound and sometimes longer for pourable screed. Plan on 1–2 workdays in total before you can move on to installing the floor.
Do I need a permit to level a floor?
No, you don't need a permit. Floor leveling is a standard preparatory job that doesn't involve any structural changes to the load-bearing structure.
Can I level a floor myself?
Yes, self-leveling compound is available at home improvement stores. For small unevenness on a flat concrete floor, it's doable for a DIYer. For large height differences (more than 5 mm), a wood subfloor, or radiant floor heating, we recommend a contractor.
How long does a leveled floor last?
A good leveling layer lasts for decades, as long as it's applied correctly and covered with the right floor covering. The layer itself isn't the wear layer, so lifespan isn't an issue in practice.
When is a primer required?
Almost always. A primer (bonding coat) is needed to keep the subfloor from absorbing the water in the leveling mortar too quickly, which causes cracks and poor adhesion. Some leveling products require a specific primer: check the product data sheet.
Related jobs
Ready to have your floor leveled professionally?
Describe your job and get quotes from verified floor leveling contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes