9 min readPrices verifiedFlooring

Cost of floor leveling: everything you need to know

Leveling a floor is necessary before you install new floor covering, tile, or hardwood. The cost depends on the type of subfloor, the size of the room, and the thickness of the leveling layer. On this page, you'll find current prices per square meter, an overview of material and labor costs, and answers to frequently asked questions.

In this article

  • ›What does floor leveling cost?
  • ›Prices by type of subfloor
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›How does floor leveling work?
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€650

average for a 25 m² room

average hourly rate

€45

contractor hourly rate (€40–55/hour)

turnaround time

1–2 days

depending on area and drying

€ Average price by type

Leveling typeRangeAverage price
Leveling a concrete floorthin layer of self-leveling compound on an existing concrete floor, up to 5 mm€200 – €550€375avg.incl. labor
Standard leveling (most chosen)leveling compound on a concrete subfloor, 20–30 m² room, including primer€450 – €850€650avg.incl. labor
Leveling a wood subfloorflexible leveling mortar on a wood floor, extra preparation€700 – €1,800€1,250avg.incl. labor
Pourable screed (anhydrite)thick leveling layer of 10–50 mm, suitable for radiant floor heating€900 – €2,200€1,550avg.incl. installation
Leveling an entire floor of a homemultiple rooms, approx. 60–80 m², including primer and travel costs€1,400 – €3,500€2,450avg.incl. labor

Prices include primer and labor for a room of about 25 m²; wood subfloors require flexible mortar and cost more. Based on Google price research.

Material and labor costs

Leveling compound (standard or self-leveling)material
€165€80 – €250
Primer / bonding coatmaterial
€40€20 – €60
Contractor labor (4–8 hours)labor
€310€180 – €440
Prep work (cleaning, repairing cracks)labor
€100€50 – €150
Removal of old debris or flooring remnantsadditional
€80€40 – €120
Contractor trip chargeadditional
€50€25 – €75

Carpenter / flooring installer hourly rate averages €40–55/hour. Drying time of the leveling layer (24–48 hours) isn't included in the labor time.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Leveling small unevenness on a concrete floorheight difference of up to 3 mm, flat and clean surfaceDoableSelf-leveling compound is easy to find at home improvement stores and relatively easy to apply€80–€180up to €220
Leveling a standard concrete floor (20–30 m² room)including applying primer, height difference up to 5 mmWith experienceThe right mixing ratio, waiting for the primer, and using a spiked roller are crucial; mistakes lead to cracks€150–€300up to €350
Repairing cracks and pits before levelingfilling small cracks and holes with repair mortarDoableRepair mortar from a home improvement store works well for small defects; it saves the contractor prep time€10–€30up to €80
Leveling a wood subfloorflexible leveling mortar on a moving wood substrateNot recommendedRegular leveling compound doesn't bond to wood and cracks as the boards move: extra repair costs are high€700–€1,800No recommended savings
Applying pourable screed (anhydrite) for radiant floor heatingthick layer of 10–50 mm, requires special mixing and pumping equipmentNot recommendedAnhydrite requires professional pumping equipment and a controlled drying process; incorrect application damages the heating system€900–€2,200No recommended savings

For small unevenness on a flat, dry concrete floor, leveling it yourself is quite doable with a self-leveling product from a home improvement store. Prepare the surface carefully: clean it thoroughly, fill small cracks with repair mortar, and always apply a primer first. Never skip this step, because without primer the subfloor draws the water out of the mortar too quickly and cracks form. As soon as the height difference is more than 5 mm, the subfloor is wood, or radiant floor heating is involved, a contractor is essential. Wood floors move and require a special flexible mortar; pourable screed for radiant floor heating requires professional pumping equipment and a precise drying protocol. A mistake in these applications quickly leads to the layer coming loose, damage to the heating system, or a costly repair job. That isn't worth saving a day of contractor's wages.

The full process step by step

1

Inspection and flatness measurement

The contractor goes over the entire room with a level (or laser level) and maps out the height differences. Loose or damaged parts of the subfloor are scratched and marked for repair. Based on the measurement, the contractor determines which type of leveling product and which layer thickness are needed.

30–60 min

2

Cleaning and repairing the subfloor

Dust, grease, loose material, and remnants of old floor covering are completely removed: a clean surface is a prerequisite for good adhesion. Cracks and pits are filled with fast-setting repair mortar and smoothed flat so the leveling layer is the same thickness everywhere.

30–90 min

3

Applying the primer and letting it dry

The bonding primer is applied fully and evenly to the subfloor with a roller or brush. The primer seals the pores and makes sure the leveling mortar doesn't lose moisture too quickly. After applying it, the contractor waits for the required drying time: usually 30 to 60 minutes, depending on the product and the absorbency of the surface.

15 min to apply + 30–60 min to dry

4

Mixing the leveling compound

The leveling powder is mixed with water in the ratio specified by the manufacturer, usually with an electric drill mixer at low speed. A mix that's too thin or too thick affects the strength and the self-leveling properties. For large areas, the work is sometimes done in multiple batches to prevent drying out.

15–30 min

5

Pouring, spreading, and removing air

The leveling compound is poured onto the floor and spreads out through its self-leveling action. The contractor helps move the compound along with a squeegee or smoothing trowel and works systematically from the back of the room toward the door. Right after that, a spiked roller is rolled through the compound to remove trapped air bubbles, which would otherwise cause weak spots.

1–2 hours

6

Drying and curing

After pouring, no one may walk in the room, and drafts and large temperature swings must be avoided. Standard leveling compound can be walked on after 24–48 hours; pourable screed (anhydrite) takes 3–7 days or longer depending on the layer thickness. Radiant floor heating may only be turned on weeks later, following the manufacturer's drying protocol.

24–48 hours (standard compound) or 3–7 days (pourable screed)

7

Flatness check and completion

Once the floor has fully cured, the contractor checks it for flatness again with the level. Any high edges or small imperfections are ground down. Only when the floor is within tolerance (usually a maximum of 2 mm per 2 meters) is the job considered finished, and the finished floor or floor covering can be installed.

30–45 min

What can go wrong?The most common mistake is skipping the primer or applying it too thinly: the subfloor then quickly draws the water out of the mortar, so the leveling layer doesn't cure properly and eventually comes loose or cracks. A second common problem is applying leveling layers that are too thick in one pass: standard leveling compound usually allows a maximum of 5–10 mm per layer; thicker layers shrink too much and crack. On wood subfloors, using cement-based leveling compound is a classic mistake: wood moves with moisture and temperature changes, and a rigid cement layer inevitably cracks as a result. Finally, working on a surface that's too cold or too warm (below 10 °C or above 25 °C) slows or disrupts curing and weakens the final strength of the layer.

6 smart money-saving tips

Request at least three quotesThe price per m² for floor leveling varies considerably by region and by the contractor who does the job. By comparing several certified flooring installers, you can save hundreds of euros on the same job without sacrificing quality.
Combine leveling with installing the new floorHave the same contractor handle both the leveling and the installation of the finished floor in one job. The contractor is already on site, the material is already scheduled, and the trip charge is only billed once. That easily saves €75–€150 on the total bill.
Repair small cracks yourself beforehandYou can fill pits and hairline cracks in the concrete floor yourself beforehand with repair mortar (€10–€20 at a home improvement store). Every minute of prep time you save the contractor also saves on the hourly rate: half an hour of work can easily save you €20–€25.
Remove the old floor covering and baseboards yourselfClearing out carpet, laminate, or cork and removing baseboards is work anyone can do without tools. Do this before the contractor arrives: a clean, empty room means they can start right away, with fewer hours on the invoice.
Choose standard leveling compound if the layer thickness allowsFor height differences up to 5 mm, standard leveling compound is considerably cheaper than anhydrite pourable screed (up to 40% difference in material costs). Ask the contractor explicitly whether pourable screed is technically necessary, or whether standard leveling compound is enough for your situation.
Schedule the job outside peak seasonFlooring installers are busiest in the summer months and around the end of the year. In spring and fall (March–April and September–October), they're often available sooner and sometimes willing to charge lower rates for immediate jobs.

Frequently asked questions

What does floor leveling cost on average?

On average, you pay €10–€30 per m². For a 25 m² room, that comes to €250–€750 for materials plus labor. Wood subfloors are more expensive: €45–€75 per m².

How long does it take to level a floor?

Applying the compound takes half a day to a full day for an average room. Drying time is 24–48 hours for standard leveling compound and sometimes longer for pourable screed. Plan on 1–2 workdays in total before you can move on to installing the floor.

Do I need a permit to level a floor?

No, you don't need a permit. Floor leveling is a standard preparatory job that doesn't involve any structural changes to the load-bearing structure.

Can I level a floor myself?

Yes, self-leveling compound is available at home improvement stores. For small unevenness on a flat concrete floor, it's doable for a DIYer. For large height differences (more than 5 mm), a wood subfloor, or radiant floor heating, we recommend a contractor.

How long does a leveled floor last?

A good leveling layer lasts for decades, as long as it's applied correctly and covered with the right floor covering. The layer itself isn't the wear layer, so lifespan isn't an issue in practice.

When is a primer required?

Almost always. A primer (bonding coat) is needed to keep the subfloor from absorbing the water in the leveling mortar too quickly, which causes cracks and poor adhesion. Some leveling products require a specific primer: check the product data sheet.

Related jobs

Ready to have your floor leveled professionally?

Describe your job and get quotes from verified floor leveling contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted