Cost of retrofitting radiant floor heating by milling: everything you need to know
When milling for radiant floor heating, channels are cut into the existing floor, after which heating pipes are laid in and sealed. The cost depends on the floor thickness, the type of subfloor (concrete, anhydrite, or screed), the area to be treated, and the contractor's regional rates.
In this article
- ›Average cost
- ›Prices by type
- ›Material and labor costs
- ›Hire a contractor or do it yourself?
- ›Step by step
- ›Money-saving tips
- ›Frequently asked questions
Need a contractor for this?
Describe your job and get quotes from contractors near you.
average price
€2,200
average total price (approx. 80 m²)
average hourly rate
€55
contractor hourly rate (€45–70/hour)
turnaround time
1–2 days
depending on area and floor type
€ Average price by type
| Floor type | Range | Average price |
|---|---|---|
| Anhydrite or cement screedSofter subfloor, faster to mill | €12 – €22 | €17avg.incl. labor |
| Concrete floorHarder subfloor, takes more time and causes more tool wear | €20 – €35 | €27avg.incl. labor |
| Wood subfloor (suitable type)Only possible with sufficient thickness; higher technical requirements | €25 – €40 | €32avg.incl. labor |
| Combination package: milling + laying pipesMilling plus laying and filling the pipes by one company | €35 – €60 | €47avg.incl. installation |
Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.
Material and labor costs
Hourly rates vary by region and contractor.
Hiring a contractor vs. doing it yourself
| Job | Do it yourself | Via a contractor | Savings doing it yourself |
|---|---|---|---|
| Operating the milling machineCorrect settings for depth and width | With experienceRental machine available, but practice required | €150–250 rental + time | €600–1,200 |
| Laying and connecting pipesCorrect layout pattern and manifold connections | Not recommendedMistakes lead to leaks or a poorly working system | - | Risk too high |
| Filling channels with mortarCorrect mortar type and compaction | DoableContractor's instructions needed for a good bond | €50–100 materials | €100–200 |
| Starting up and testing the systemPressure test and tuning to the boiler or heat pump | Not recommendedRequires expertise and certification for the warranty | - | Risk of losing the warranty |
The milling itself is, in principle, doable with a rented milling machine if you're a DIYer with construction experience. The risks mainly lie in channels that are too deep, which can weaken the floor structure, or too narrow, so the pipe doesn't fit properly. Laying the pipes, connecting them to the manifold, and starting up the system are tasks you're better off leaving to a licensed heat pump installer or HVAC technician. A mistake in the pipes or connections can lead to water leaking under the floor, resulting in a costly repair.
The full process step by step
Inspection and measurement
The contractor inspects the existing floor for thickness, composition, and any obstacles such as pipes or reinforcing steel. Then the layout plan for the channels is drawn up.
0.5–1 hours
Milling the channels
Using a professional channel milling machine, the channels are milled to the correct depth and width. Dust control (a vacuum attached to the machine) is essential to limit damage to the surroundings.
4–8 hours (depending on area)
Laying the heating pipes
The PE-RT or PEX heating pipes are laid in the channels and connected to the manifold. The pattern (spiral or double spiral) is determined by the desired heat distribution.
2–4 hours
Pressure test and filling
Before the channels are sealed, the HVAC technician performs a pressure test to rule out leaks. Then the channels are filled with sand-cement or anhydrite mortar.
1–2 hours + 24–48 hours drying time
Startup and final check
After the drying time, the system is slowly heated up (a commissioning protocol) and tuned to the boiler or heat pump. The contractor checks the pressure, flow, and temperature distribution.
1–2 hours
4 smart money-saving tips
Frequently asked questions
What does milling for radiant floor heating cost per m²?
On average, you pay €15 to €35 per m², depending on the floor type and complexity. A soft anhydrite floor is cheaper to mill than a hard concrete subfloor. Always compare multiple quotes for the best price.
Which floor type is best suited for milling?
Anhydrite and cement screeds are the easiest to mill because of their relatively soft composition. Concrete floors are also possible, but they take more time and cause more wear on the equipment. Wood floors only qualify if they're thick enough and the load-bearing structure isn't affected.
How deep are the channels milled?
As standard, the channels are milled 20–25 mm deep and 18–22 mm wide, so the heating pipe fits well. The exact dimensions depend on the pipe diameter and the thickness of the existing screed.
How long do I have to wait before I can put weight on the floor?
After the channels are filled with mortar, you usually need to wait 24 to 48 hours before you can put weight on the floor. Before laying the final floor covering and starting up the heating system, allow a drying time of at least 3–4 weeks, depending on the type of mortar and the ambient temperature.
Do I need a permit for the milling?
Milling channels in an existing floor usually doesn't require a permit. If the home is a historic building or the work affects load-bearing structures, it's wise to consult the municipality or a structural engineer. Ask your contractor for advice.
Related jobs
Ready to have channels milled for radiant floor heating?
Describe your job and receive quotes from verified contractors near you.
Within 24 hours
response from a contractor
Verified
all contractors checked
Competitive price
compare quotes