Skip to main content

Are you a contractor? Sign up for free

Contractor milling channels for radiant floor heating in a Dutch home
8 min readPrices verifiedHeating & Boilers

Cost of retrofitting radiant floor heating by milling: everything you need to know

When milling for radiant floor heating, channels are cut into the existing floor, after which heating pipes are laid in and sealed. The cost depends on the floor thickness, the type of subfloor (concrete, anhydrite, or screed), the area to be treated, and the contractor's regional rates.

In this article

  • ›Average cost
  • ›Prices by type
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›Step by step
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€2,200

average total price (approx. 80 m²)

average hourly rate

€55

contractor hourly rate (€45–70/hour)

turnaround time

1–2 days

depending on area and floor type

€ Average price by type

Floor typeRangeAverage price
Anhydrite or cement screedSofter subfloor, faster to mill€12 – €22€17avg.incl. labor
Concrete floorHarder subfloor, takes more time and causes more tool wear€20 – €35€27avg.incl. labor
Wood subfloor (suitable type)Only possible with sufficient thickness; higher technical requirements€25 – €40€32avg.incl. labor
Combination package: milling + laying pipesMilling plus laying and filling the pipes by one company€35 – €60€47avg.incl. installation

Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.

Material and labor costs

Milling work (labor)labor
€20€12 – €35
Heating pipe (per-meter price, e.g., PE-RT or PEX)material
€2.50€1.50 – €3.50
Filling mortar or sand-cementmaterial
€5€3 – €8
Manifold including connectionsmaterial
€250€150 – €400
Dust extraction and construction dust cleanupadditional
€90€50 – €150
Removal of debris and dustadditional
€120€75 – €200

Hourly rates vary by region and contractor.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Operating the milling machineCorrect settings for depth and widthWith experienceRental machine available, but practice required€150–250 rental + time€600–1,200
Laying and connecting pipesCorrect layout pattern and manifold connectionsNot recommendedMistakes lead to leaks or a poorly working system-Risk too high
Filling channels with mortarCorrect mortar type and compactionDoableContractor's instructions needed for a good bond€50–100 materials€100–200
Starting up and testing the systemPressure test and tuning to the boiler or heat pumpNot recommendedRequires expertise and certification for the warranty-Risk of losing the warranty

The milling itself is, in principle, doable with a rented milling machine if you're a DIYer with construction experience. The risks mainly lie in channels that are too deep, which can weaken the floor structure, or too narrow, so the pipe doesn't fit properly. Laying the pipes, connecting them to the manifold, and starting up the system are tasks you're better off leaving to a licensed heat pump installer or HVAC technician. A mistake in the pipes or connections can lead to water leaking under the floor, resulting in a costly repair.

The full process step by step

1

Inspection and measurement

The contractor inspects the existing floor for thickness, composition, and any obstacles such as pipes or reinforcing steel. Then the layout plan for the channels is drawn up.

0.5–1 hours

2

Milling the channels

Using a professional channel milling machine, the channels are milled to the correct depth and width. Dust control (a vacuum attached to the machine) is essential to limit damage to the surroundings.

4–8 hours (depending on area)

3

Laying the heating pipes

The PE-RT or PEX heating pipes are laid in the channels and connected to the manifold. The pattern (spiral or double spiral) is determined by the desired heat distribution.

2–4 hours

4

Pressure test and filling

Before the channels are sealed, the HVAC technician performs a pressure test to rule out leaks. Then the channels are filled with sand-cement or anhydrite mortar.

1–2 hours + 24–48 hours drying time

5

Startup and final check

After the drying time, the system is slowly heated up (a commissioning protocol) and tuned to the boiler or heat pump. The contractor checks the pressure, flow, and temperature distribution.

1–2 hours

What can go wrong?Channels that are too deep can damage reinforcing steel or existing pipes. If the mortar isn't properly compacted or cured, cracks can form over time. An incomplete pressure test before filling can result in a leak that only becomes visible after the floor covering is laid: a costly mistake.

4 smart money-saving tips

Combine with other floor workCombine the milling with laying a new screed or floor covering. Contractors charge less in travel costs and base rates when they do several jobs at once.
Request at least three quotesRates for milling work can vary widely by region and contractor. Through VakmanBaas, you receive quotes from multiple verified contractors, so you can compare fairly.
Schedule outside the busy seasonIn fall and winter, demand for HVAC companies is lower. Contractors then have more room in their schedules and can sometimes offer sharper rates.
Remove the old floor covering yourselfBy removing the existing floor covering yourself before the contractor arrives, you save one to two hours of labor costs. Make sure the subfloor is clean and flat.

Frequently asked questions

What does milling for radiant floor heating cost per m²?

On average, you pay €15 to €35 per m², depending on the floor type and complexity. A soft anhydrite floor is cheaper to mill than a hard concrete subfloor. Always compare multiple quotes for the best price.

Which floor type is best suited for milling?

Anhydrite and cement screeds are the easiest to mill because of their relatively soft composition. Concrete floors are also possible, but they take more time and cause more wear on the equipment. Wood floors only qualify if they're thick enough and the load-bearing structure isn't affected.

How deep are the channels milled?

As standard, the channels are milled 20–25 mm deep and 18–22 mm wide, so the heating pipe fits well. The exact dimensions depend on the pipe diameter and the thickness of the existing screed.

How long do I have to wait before I can put weight on the floor?

After the channels are filled with mortar, you usually need to wait 24 to 48 hours before you can put weight on the floor. Before laying the final floor covering and starting up the heating system, allow a drying time of at least 3–4 weeks, depending on the type of mortar and the ambient temperature.

Do I need a permit for the milling?

Milling channels in an existing floor usually doesn't require a permit. If the home is a historic building or the work affects load-bearing structures, it's wise to consult the municipality or a structural engineer. Ask your contractor for advice.

Related jobs

Ready to have channels milled for radiant floor heating?

Describe your job and receive quotes from verified contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →