A swimming pool in your backyard is a luxury investment that increases the value of your home and gives you years of swimming fun. The price depends on the type of pool (above-ground, in-ground, or fiberglass), the dimensions, the materials you choose, and additional systems such as heating and filtration. For a renovation, the condition of the existing structure, new lining, and any replacement of the filter system matter most.

In this article

  • ›What does installing a swimming pool cost?
  • ›Cost by type of pool
  • ›Material and labor cost breakdown
  • ›Pool renovation: what does it cost?
  • ›Hire a pool contractor or do it yourself?
  • ›Step by step: how does the installation work?
  • ›Money-saving tips for your pool

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€35,000

in-ground pool 8×4 m, fully installed

average hourly rate

€45

pool contractor (€35–55/hour)

turnaround time

3–14 days

depending on type and scope

€ Average price by type

Pool typeRangeAverage price
Portable above-ground poolframe or inflatable pool, temporary, simple setup€300 – €2,500€1,200avg.incl. installation
Permanent above-ground pool (wood or steel)permanent above-ground model, 6×3 m, including installation€4,000 – €12,000€7,500avg.incl. installation
Fiberglass in-ground pool (most popular)prefab in-ground pool 8×4 m, including excavation and installation€20,000 – €45,000€32,000avg.incl. installation
Custom concrete in-ground poolfully custom-built in masonry, premium finish€50,000 – €100,000€70,000avg.incl. installation
Pool renovation (basic)new liner or coating, filter system intact€3,000 – €8,000€5,500avg.incl. installation
Pool renovation (complete)replace lining, filter system, heating, and structure€10,000 – €25,000€17,000avg.incl. installation

Prices include standard installation and VAT; extra work for an enclosure, lighting, or heating is quoted separately. Based on Google price research.

Material and labor costs

Fiberglass pool shell (8×4 m)material
€13,000€8,000 – €18,000
Excavation and digginglabor
€4,000€2,000 – €6,000
Filter system and pumpmaterial
€2,500€1,500 – €4,000
Pool heating (heat pump)material
€3,500€2,000 – €5,000
Installation and hookup (plumber + electrician)labor
€5,500€3,000 – €8,000
Pool coping, patio, and surrounding finishadditional
€4,500€2,000 – €8,000

Pool contractor hourly rate averages €45–65/hour. Excavation and electrical hookup are usually done by specialized subcontractors.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Assembling a portable above-ground poolSet up a frame or inflatable pool, fill it, and set up water careDoableNo tools or special knowledge required; the manual is enough€300–€2,500up to €400
Building a foundation for and placing a permanent above-ground poolPour a concrete base, level the pool, and seal itWith experienceConcrete work and leveling require construction experience; mistakes cause the pool to tilt€4,000–€12,000up to €1,500
Installing a fiberglass in-ground poolExcavate, place the shell, and run water and electrical connectionsNot recommendedRequires a licensed plumber and electrician; building permit and inspection needed€20,000–€45,000No legal savings possible
Replacing the pool liner during a renovationRemove the old liner, repair the substrate, and seamlessly weld the new linerNot recommendedSeamless welding requires professional welding equipment; gaps lead directly to leaks€3,000–€8,000No recommended savings
Cleaning the filter system and balancing chemicalsBackwash the filter, measure and correct pH and chlorine levelsDoableWith a test kit and clear instructions, easy to do yourself as seasonal maintenance€100–€400 per serviceup to €300

For in-ground pools, a licensed pool contractor is indispensable. Installing a fiberglass or concrete pool requires excavators, precision work on the water connections, and an electrical installation that complies with NEN 1010 (the Dutch standard for electrical installations; damp locations). Most municipalities also require a building permit (in Dutch: omgevingsvergunning), and the completed work must be inspected. A mistake in the structure or sealing almost always leads to leaks that cost more than the entire project. If you like doing things yourself, you can make a real contribution when assembling a portable above-ground pool and with seasonal maintenance: backwashing the filter, adjusting the pH, and putting on the pool cover are things you can easily do yourself with the right test kit and manual. As soon as excavation, plumbing, or permanent electrical work is involved, hiring a contractor isn't just sensible but also legally required.

The full process step by step

1

Intake, site assessment, and permit application

The pool contractor visits your backyard for a thorough assessment: they evaluate the soil conditions, the groundwater level, the available space, and the desired location. Based on this, they prepare a detailed quote and help you apply for the building permit with your municipality: required for almost every in-ground pool.

1–3 weeks

2

Excavation and digging

An excavator operator digs the pit to the exact required dimensions and depth. The excavated soil is hauled away or, where possible, reused to raise the patio. The bottom of the pit is compacted and a stable sand bed is laid to support the pool shell or formwork.

1–3 days

3

Placing the pool shell or formwork

For a fiberglass pool, the prefab shell is carefully lowered into the pit with a crane and leveled to the millimeter. For a concrete pool, steel rebar is placed, formwork is assembled, and concrete is poured. Sand is tamped around the shell to prevent lateral pressure and settling.

1–2 days (fiberglass) or 2–4 weeks (concrete)

4

Plumbing and electrical installation

The licensed plumber installs the water supply, return, and drain lines and connects them to the filter system and the heat pump. The electrician installs the pump, underwater lighting, heat pump, and any automation in compliance with NEN 1010. All connections are tested for leaks and proper operation.

1–2 days

5

Finishing and patio around the pool

The paver installs pool coping and an adjoining patio in the material you choose. Steps, a ladder, and any enclosure or roller cover system are installed. The pool is filled and the water chemistry (pH, total alkalinity, and chlorine level) is set to safe swimming levels.

1–3 days

6

Handover, operating instructions, and warranty transfer

The contractor demonstrates how to operate the filter system, heating, and automation, and how to maintain the water chemistry. You receive a complete file with manuals, warranty certificates, and the inspection report for the electrical installation. Go through the handover point by point before you sign.

2–4 hours

What can go wrong?The most common problems with pool installation start during preparation: a high water table or soft peat soil isn't identified in time, so extra drainage or piles are needed that blow the budget. If you skip the building permit, you risk an enforcement notice from the municipality requiring demolition at your own expense. With renovations, the most common mistake is applying a new liner or coating over a structurally damaged wall: cracks in the concrete or loose plaster cause the new lining to come loose after just one season. Finally, cheap contractors who handle the electrical hookup as part of the plumbing work without a licensed electrician risk an installation that doesn't pass inspection, after which you still have to hire a second contractor for repairs.

6 smart money-saving tips

Choose a fiberglass pool over a concrete oneA prefab fiberglass in-ground shell is on average €20,000–€40,000 cheaper than a custom-built concrete pool. Its smooth, non-porous wall is also less prone to algae, so you need fewer chemicals and less cleaning each year.
Request at least three itemized quotesPrice differences between pool contractors for identical jobs can reach €5,000–€10,000. Always ask for an itemized quote with separate line items for excavation, shell, installation, and finishing: that way you compare apples to apples and see right away where one contractor is more or less expensive.
Schedule the installation in spring or fallPool season runs from April to August. Outside peak season, pool contractors are less busy, and negotiating a 5–10% discount or faster completion is much easier. If you order in September, your pool will be ready for the next summer season.
Invest in a high-quality pool cover or enclosureA good thermal cover (€800–€3,000) or permanent enclosure (up to €8,000) lowers heating costs by 30–50% and significantly reduces chemical use. In most cases, the investment pays for itself within two to three seasons.
Choose a heat pump instead of electric resistance heatingAn air-to-water heat pump for your pool has a COP of 4–6: for every euro of electricity, it delivers four to six euros' worth of heat. Compared with an electric resistance heater or gas boiler, you save €300–€800 a year on energy costs, depending on how much you use it.
Combine excavation with other yard projectsIf you're also having a patio, driveway, or pond built alongside the pool, the excavator operator can handle several digging jobs in one mobilization. This saves considerably on transport costs and trip charges, which easily run €500–€1,500 per visit.

Frequently asked questions

What does installing a swimming pool cost on average?

A fiberglass in-ground pool of 8×4 m costs €32,000 on average, with a range of €20,000 to €45,000 depending on dimensions, finish, and additional systems. A portable model starts at just €300.

How long does it take to install an in-ground pool?

A fiberglass in-ground pool is installed in 3 to 7 workdays, including excavation and installation. A custom-built concrete pool takes 2 to 6 weeks. Renovations usually take 3 to 10 workdays depending on the scope.

Do I need a permit for a swimming pool?

For an in-ground pool, most municipalities require a building permit because of the excavation work. Portable and above-ground pools usually don't require a permit. Always check your municipality's rules and zoning plan.

Can I install or renovate a swimming pool myself?

You can install a portable or small above-ground pool yourself. For in-ground pools, professional help is essential because of the excavation, water connections, and electrical work. Improper work leads to leaks and structural problems.

Which type of pool is cheapest to maintain?

A fiberglass pool needs the least maintenance thanks to its smooth, non-porous surface that slows algae growth. Concrete pools require more chemicals and periodic coating repairs. For any type, expect €500–€1,500 in annual maintenance costs.

What are the benefits of a pool cover or enclosure?

A pool cover or enclosure lowers heating costs by 30–50%, reduces the amount of chemicals needed, and keeps the water cleaner. A good enclosure costs between €1,500 and €8,000, but it pays for itself quickly.

Related jobs

Ready to have your swimming pool installed or renovated?

Describe your job and receive quotes from verified pool contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →