Skip to main content

Are you a contractor? Sign up for free

Contractor building a swimming pond at a Dutch home
8 min readPrices verifiedLandscaping & Paving

Cost of building a swimming pond: everything you need to know

A swimming pond is an eco-friendly alternative to a traditional swimming pool: the water is cleaned by plants and a biological filter system instead of chlorine. The cost depends on the surface area, the depth, the filter package you choose, and the finish of the banks and the patio.

In this article

  • ›Average cost
  • ›Prices by type
  • ›Material and labor costs
  • ›Hire a contractor or do it yourself?
  • ›Step by step
  • ›Money-saving tips
  • ›Frequently asked questions

Need a contractor for this?

Describe your job and get quotes from contractors near you.

1
Describe the job
2
Choose a contractor
3
Job posted
Find a contractor →

average price

€18,500

including excavation, liner basin, filter system, and bank plants

average hourly rate

€55

contractor hourly rate (€45–€75/hour)

turnaround time

3–10 days

depending on size and complexity

€ Average price by type

Swimming pond typeRangeAverage price
Small swimming pondapprox. 20–30 m², liner, simple filter system€7,500 – €14,000€10,500avg.incl. installation
Medium swimming pondapprox. 35–55 m², liner or concrete, plant filter zone€14,000 – €24,000€18,500avg.incl. installation
Large swimming pondapprox. 60–90 m², concrete or prefab, luxury bank finish€24,000 – €40,000€31,000avg.incl. installation
Custom/premium90 m²+, natural stone, LED lighting, tied into yard design€38,000 – €70,000€52,000avg.incl. installation

Prices include VAT and are estimates; always request multiple quotes. Based on Google price research.

Material and labor costs

Excavation and soil removallabor
€1,800€800 – €3,500
EPDM or PVC liner (incl. underlayment)material
€1,900€900 – €3,500
Concrete basin (alternative to liner)material
€5,500€3,500 – €9,000
Biological filter system + pumpmaterial
€2,600€1,200 – €4,500
Bank plants and regeneration zone plantingmaterial
€900€400 – €1,800
Installation + finishing of banks, patio, and stepsadditional
€3,200€1,500 – €6,000

Hourly rates vary by region and contractor.

Hiring a contractor vs. doing it yourself

JobDo it yourselfVia a contractorSavings doing it yourself
Digging and soil removalDigging with a mini excavator or by handWith experienceHeavy work; rent a mini excavator and dumpster€400–€900€600–€1,500
Installing the linerLaying and finishing EPDM or PVC linerDoableInstructional videos available; make sure it's wrinkle-free€800–€2,000€500–€1,200
Connecting the filter systemInstalling pump, piping, and biological filterNot recommendedMistakes lead to algae problems and poor water quality€500–€1,500€300–€800
Bank finish and patioStone, wood, or tiles around the pondWith experienceMoisture-resistant material required; slope matters€800–€2,500€600–€1,800

An experienced landscaping company or pond contractor ensures a watertight structure and a working biological filter system from day one. The added value lies mainly in flawless liner installation and correctly sizing the filter to the pond volume. If you want to pitch in, you can take on the excavation and liner installation yourself and have a contractor handle only the filter and the final finish. This saves €1,500–€3,500 on a medium-sized pond.

The full process step by step

1

Design and measuring

The contractor comes on site, determines the best location (sunlight, distance from trees), sets the desired dimensions, and creates a design with filter zoning and a bank plan.

1 day

2

Excavation and digging

The pond pit is dug with a mini excavator to the right depth (swimming area at least 1.5 m) and the regeneration zone is created. Soil is hauled away or reused in the yard.

1–2 days

3

Building the basin (liner or concrete)

A fleece layer protects the liner; then the EPDM or PVC liner is laid wrinkle-free and anchored at the banks. For a concrete basin, reinforced concrete is poured and cured.

1–3 days

4

Filter system and filling

The pump, piping, and biological filter are connected and tested. The pond is filled with tap water or rainwater. Bank plants and aquatic plants for the regeneration zone are planted.

1–2 days

5

Bank finish and completion

The patio and banks are finished with stone, wooden decking, or basalt. After a break-in period of two to four weeks (bacteria building up in the filter), the pond is ready for swimming.

1–2 days

What can go wrong?The most common problems are a filter system that's too small (leading to green algae and cloudy water), liner damage from tree roots or sharp stones, and a swimming zone that's too shallow, so the water warms up too quickly in summer. Always choose a contractor with specific pond experience and ask for reference projects.

4 smart money-saving tips

Request at least three quotesPrice differences between pond contractors can reach 30–40%. Always compare material specifications (liner thickness, pump capacity) so you're comparing apples to apples.
Schedule the work outside peak seasonLandscapers have more capacity in spring and fall. Scheduling the work in September or October can sometimes get you a 10–15% discount on labor costs.
Choose EPDM liner over concreteA concrete basin is more durable but costs two to three times as much as a quality EPDM liner. Installed correctly, EPDM lasts 25+ years and is more than enough for most yards.
Combine the work with other yard workIf you're planning paving or landscaping anyway, have everything done in one job. The equipment costs (mini excavator, dumpster) are shared, and you save on trip charges.

Frequently asked questions

How much does building a swimming pond cost on average?

Building a swimming pond in the Netherlands costs €8,000–€35,000 on average. The exact price depends heavily on the surface area, the basin type you choose (liner or concrete), the filter system, and the bank finish. Based on Google price research.

Which filter system is best for a swimming pond?

The most common option is a biological plant filter (regeneration zone): aquatic plants clean the water naturally. Alternatives are a mechanical filter basin or a combination of both. A biological system needs fewer chemicals but more space (approx. 30–50% of the swimming area).

Can I build a swimming pond myself?

Digging and installing the liner is doable for a DIYer with the right materials. Connecting the filter system and leveling the banks, however, takes more expertise. Mistakes in the liner or the filter can lead to leaks and algae growth. For larger ponds, we recommend a specialized landscaping company.

Does a swimming pond need a permit?

In most municipalities, you don't need a permit for a swimming pond in your backyard as long as the structure is permit-free and you respect the property lines. Always check the local rules, because some municipalities set requirements for the maximum surface area or the distance to the property line.

What are the annual maintenance costs of a swimming pond?

Expect €300–€800 per year. This covers electricity for the pump (€100–€300), pruning bank plants, replacing filter material, and occasional algae treatment. A well-built biological system needs almost no chemicals.

Related jobs

Ready to have your swimming pond built?

Describe your job and get quotes from verified contractors near you.

Within 24 hours

response from a contractor

Verified

all contractors checked

Competitive price

compare quotes

1
Describe the job
2
Choose a contractor
3
Job posted
Post a job now →